ML20087C446
| ML20087C446 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/09/1992 |
| From: | Cottle W ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GNRO-92-00004, GNRO-92-4, NUDOCS 9201140237 | |
| Download: ML20087C446 (6) | |
Text
.
m ASk M.
I!ntergy Operauons,ine.
-:::. ENTERGY w * !,% N m. -
en:
ii 1-. 4.114 (7 N I &
W. T. Cettle
.4 e o.
41,
~
January 9, 1992 11.3 Nuclear Regulatory Commission Hall St at ton PI-137 WnshIngton, D.C.
20555 At t ont ioti:
Docuenetit Cont rol Desk
Subject:
Grnod Unli Nuclear Statton tin i t 1 Docket No. 50-416 ldcenne No. NIT-29 ASHE Settlon XI Relici Requent Number 1-00023, Revisioti 0 GNRO-42/00004 Gen t l ernen This sulanit tnl request a relief from the requirements of ASMF Section XI, in nccordance with 10CFR50.M n(g)(5)(lv) niul 10CFR50.55a(g)(6)(1).
A copy of the rollof r equest is attached.
Relief Requent 1-00023, Rovinton 0 idetitifies requirements belloved to impose undun hardship without provid1nt; o c.ommensurat o
',.m rense in the level of snict y or qualit y.
ASME Section X1, 19'? Edition thr ough t he Sun'mer 19 M Addeinta, lWA-6230 regulies filing t he Inservice It:spect.f on sumn.nry t opoi t n for Ginks 1 atui 2 pressure ret n in ing component s and t heir support r. within 90 days of t hri complet ion of t he lusenvice inspect ionn conducted during t hn erfueling cutnge.
IWA-6220 spec 3fien ihnt examinntions, tents, replacement e and repalts conduct ed since t he pi ecedlin; summary reporin be include <l.
Due to the fact that kotir pnckages at Grand Gulf nie subject ed to a series of reviews by neveral plant' organizations, n'ul the number of work packages to be reviewed, we have requested and receivel extenniour, for filing thn Innervice inspection Sumenty report following each of the previous two refueling outages.
Ilnsed on this nxpnrience, as well as our desire to miniinir.e extennive overt imn demands on personnel who havn just complet ed a prot ract ed out age pot lod, wn request permission to.
permanent ly ext < ' ' t he filing LJma limit for Inservice Inspect ion summniy reports to 180 ca.
8.
G9112191/SNLlCFLR - 1 g
9201140237 9201oo PDR. ADOCK 05000416
.f FDR
.)
(
l 1
i January 9 1992 i
GNRO-92/0000/e l'agn 2 of 3 Plonne review and apptove the attached requent by April 1992 to slipport filing the innervice ltispection summnry report for thn fif th refueling outage.
If any nddit ional information in required to support your review, please advise.
Yourn ttuly, e <D 1^~'CArtix WTC/JE0/mte attachment:
Rolief Request 1-00023, Rnvinfon 0 cci tir. D. C. Illnt es (w/n)
I Hr. J. h. Hat hin (w/n)
M r. R. 11 McGehoo (w/n)
Mr. N. S. Reynolds.(w/a)
Mr.11.
I,. Thoman (w/o)
Mr. Stewart D. Ebneter (w/n)
Regional klministrator.
U. S. Nt.c l-
, Regulatory Commlandon-Region 11 101 Marietto St.. N.W.. Suite 2900 j.
Atlanta Georgin 30323 Mr. P. W. O'Connor, Project Hannger (w/2)
Of f1co of Nucicar Reactor Regulat {on U.S. Nuclear Regtilatory Comminnion 11all Stop 13113 War.hington, D.C.
20555 l
L 09112191/SNh1CFl.R - 2
~.
__.._._.-..,_,,_._..a
--w GRAND GULF NUCLEAR STATION Innorvico Inupoetion Requircm:nto Section 4 INSERVICE INSPECTION Rollof Roquest TEN YEAR PROGRAM GRAllD GULF llUCLEAR FTATION UllIT 1 RELIEF REQUEST I-00023, REVISIOli 0 PAGB 1 OF 4 1HSIMICJJ1E1T&T1011 EMMARY REPORT FILIBO_.PEElQ.Q I.
Component:
All ASME Class 1, 2 and 3 components.
II.
Codes Reports for Inacrvico Inspection of ASME Class 1,
2 and 3
components are in accordance with ASME Section XI, 1977 Edition through tho Summor 1979 Addenda.
III.
Code requiromonto:
ASME Section XI, 1977 Edition through the Summer 1979
- Addenda, IWA-6230 requires filing the Inservice Inspection summary reports for Class 1
and 2
pressuro l
retaining components and their supports within 90 days of the completion of the inservice inspection conducted during the refueling outago. IWA-0220 specifies that examinations,
- tests, replacements and repairs conducted sinco the proceding sumnary reports be includod.
IV.
Information to IWA-6220 requires that e.batracts of support the repairs and replacements to included in dotornination that the summery report. GGNS performs reviews the Codo on all ASME Section XI work packages requirements are (including m.ochanic.al, cloctrical and Ituc impractical packages) after refueling outages to identify work packages whh doction XI repairs / replacements which require the preparation of NIS-2 forme. The review of work packegos and preparation of NIS-2s is required within 90 days.
Mooting this requiremont is impractical for the following reasons
_m l
M\\ MECH \\MUNitR\\tillif3\\tR?3401X,RR
_ _ - -. ~
- GRAND GUtr NuctEAR STATION Incorvico Incp ction Requiremonto tion 4 INSERVICE INSPECTION Ro of p TcN YEAR Pn0 CRAM GRA!1D GULF HUCLEAR STATION UllIT 1 RELIEF REQUEST I-00023, REVISION O PAGE 2 OF 4 IllSIB_V.EX_111RE110ll SUMihELERQlG_f.lldi!D PERI 03 IV.
Information to
- 1) Work packages for completed work are support the subjected to a
serios of reviews by determination that soveral plant organizations. These reviews the Code verify packago correctness and requirements are completonoss, address failures due to impractical equipment malfunction and verify that tho (continued):
work was proporly performed as documented in the package.
The amount of timo required to complete those post-work reviews can vary from two wooks to throo months. Subsequent to thcso reviews,.the packago is provided to the Section XI group which is responsible for preparation of the summary report. If another outago is required within tho 90 days following a refueling
- outage, the priority of the I
organizatione performing reviews changes from post-work reviews to outago support.
- 2) Over 900 Section XI work packages woro reviewed by tho So: tion XI group during RF04. Researching the supporting documents (design change
- packagos, material nonconformanco
- reports, material cortifications, etc.), preparing the HIS-2s and routing the NIS-2s through the review and approval process is manpower intensivo and time consuming.
V.
Specific rollef Permission is requested to extend the requestod filing timo limit for the Incorvice Inspection summary reports for Class 1 and 2 pressure roteining components and their supports to 180 days.
__J M \\MI C H \\ HUN i t R \\k t t il f l\\t R 23401 X. R R
__m_
' GRAND GULF NucLEAn STATION IncorVico Inspection Requiremento Socd on INSERVICE INSPECTION p,gg, Roquest TEN __ YEA _n_ PROGRAM GRAND GULF NUC?, EAR STATION UNIT 1 R2 LIEF REQUEST I-00023, REVISION O PAGE 3 0F 4 111ElMICE INSPECTION E.WitMRL_BEPORT FIIdl{Q_EZRIQQ VI.
Reasons why rollof Extension of the 90 day filing limit is should be grantedt requested for the following reasons:
1)
The codo requires inclusion of abstracts of repairs and replacements in the Inservico Inspection Summary Report.
For documentation of repairs and replacements, GGNS has elected to utilizo the NIS-2 form contained in a
later edition of the Codo As stated under "
Information to support the datormination that the Codo requirements are impractical",
completion of the work packago reviews and preparation of the NIS-2s during the 90 day period is impractical.
2)
The wor.
pack..go documents the performance of the repair or replacement.
It is assembled and implomonted in accordanco with plant programs that assure that repairs and mlacements are in accordance with the requirements of-ASME Section XI.
The NIS-2 is utilized to summarize the repair / replacements for reporting purposes and_ for Codo Data Report updatos as applicable. The Section l
XI group performs a comprehensive work packago review to ensure that the programs at GGNS are offectivo.
The Section XI group has the best exportise for the review of packages for ASME Section XI compliance.
This review providos added assurance that 100%
of the Section XI repairs and replacements are properly identified and reported, llowever, because of the time spent reviewing work packages and preparing NIS-2s, tho 90 day filing l
period causes undue hardship on utility l
paraonnel.
H\\ MECH \\HUWilt\\R(Lllf$\\RR23R011t.Rt
_._._m...______.._._._
GRAND GULr NucLEAn STATION Incorvice Inspection Requiremonto Section 4 INSERVICE INSPECTION M M hquest TEN YEAR PaoGRAM GRAND GULF NUCLEAR STATION U 41T 1 RELIEF REQUEST I-00023, REVISION O PAGE 4 OF 4 INSERVICE INSPECTION
SUMMARY
REPORT FILING PERIOD VI.
Reasons why relief Reviewing all Section XI work packages and should be granted preparing. the NIS-2s within the 90 day (continued):
filing period requires extensive overtime hours following the outage.- Filing the Inservice Inspection summary reports within 90 days of the completion of the inservice inspections is not: expected to result in a compensating imerovement in quality or safety.
l
\\
VII.
Alternate Testing:
None
{
VIII.
NRC discussion statement I
+
1 i
s t
I M\\M(CH\\MUNTER\\R(Llif$\\kR23ROTX.RR m.,. - _ -. _.. _ -.. ~
.~...m_,...
_~..~s.__, _ _..,.. - _,. ~. _. _.. _ -,. _
_