ML20087C210

From kanterella
Jump to navigation Jump to search
Comment Supporting Proposed Rule 10CFR50 Re Changes in Frequency Requirements for Emergency Planning & Preparedness Exercises from Annual to Biennial
ML20087C210
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/10/1995
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF THE SECRETARY (SECY)
References
FRN-60FR19002, RULE-PR-50 60FR19002-00018, 60FR19002-18, AEP:NRC:0508AM, AEP:NRC:508AM, NUDOCS 9508090091
Download: ML20087C210 (1)


Text

WG bCOL i

$lO" 0

K 32'8

.. O,.

g USHRC INDIANA ie n' p y MCMGAN 44

'95 g 4 P3 :

powse OFFICE OF SE[CREyR00CKET g

, 1995 C

AEP:NRC:0508AM DOCE N g Docket Nos.: 50-315 50-316 Nuclear Regulatory Commission

(

ATTN: Docketing and Service Branch (Qggg U.

S.

Washington, D.C. 20555

)

Gentlemen:

DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 PROPOSED RULE CHANGED CONCERNING EMERGENCY PLANNING AND EXERCISE REQUIREMENTS 72 of the Federal Register includes proposed rule Volume 60, No.

changes to Appendix E,

Section IV, F.2, to 10CFR Part 50, Preparedness for Production and

" Emergency Planning andThe following are our comments regarding Utilization Facilities."

the proposed changes.

We also concur We agree with the wording of the proposed change.

is not with the petitioner's contention that an annual exercise cost ef fective for either the Federal Government or the licensee.

In view of the steady industry improvement in the area of emergency preparedness, as evidenced by the improvement in industry-averaged SALP ratings, we believe that biennial exercises will be sufficient to assure the protection of public health and safety.

Sincerely, uld 0 f E.

E.

Fitzpatric4 Vice President b1b c:

A. A. Blind G. Charnofi H. J. Miller NFEM Section Chief NRC Resident Inspector - Bridgman J.

R.

Padgett 9508090091 950710 D

p\\

PDR PR 50 60FR19002 PDR J