ML20087C005
| ML20087C005 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/01/1995 |
| From: | Salas P TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9508080396 | |
| Download: ML20087C005 (5) | |
Text
-t 3AFEGUARDE
,v:m yy Tenressee va"ev Aconty Por 0" ce B<a 2000 DeCaM A!aDama 3%D9 AUG 011995 l
U.S.
Nuclear Regulatory Commission 10 CFR 50.54(p)
ATTN: Document Control Desk l
L Washington, D.C.
20555 i
Gentlemen:
In the Matter of
)
Docket Nos. 50-259 i
Tennessee Valley Authority
)
50-260
-j 50-296 I
l BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2,
and 3
)
BASELINE PHYSICAL' SECURITY / CONTINGENCY PLAN (PSP /CP)
REVISION 0 j
Pursuant to 10 CFR 50.54(p), TVA has enclosed a baseline revision to the BFN PSP /CP.
As noted in NRC inspection report 50-259, 260, 296/92-09,' dated April 2, 1992, NRC I
discussed with BFN security management that TVA's security upgrade program would necessitate a revision to the BFN PSP /CP to address newly installed systems and access control methods.
TVA is providing this baseline (Revision 0) of the PSP /CP.to address the newly installed security equipment and access control methods.
The effective date of this revision coincides with the completion of BFN's Phase 1 of the security upgrade program which wac completed on July 28, 1995. to this submittal provides an executive summary of the changes to the PSP /CP. provides PSP /CP Revision O.
This letter and the enclosed information is being sent by certified mail.
TVA has enclosed instructions
)
for updating NRC copies 6 through 11.
The signed receipt
(-
[
I ?OJA4DS fisORMATION CLASS!FJCAT;gy
-OE5 NOT APPLY TO THIS PAGE Wygg ecPARATED FPOM ATTACHMENT
_ 'r q
l
- s. ',
.;(f s
i SAFEGUARDS h[
(A S
9508000396 950801
-y~'
8
/t
/
PDR ADOCK 05000259 I-E_-__ __in - _ _ _ _ _ _ _ _ _ _ _
__ __ _ _ _ _ _ _ !/
~ ~ " - "- ---'-~
m
- ...'.t"OUUkIDD,
,. ;. - n.,
i
...n.-.
< ft*,8 g g.,
)
,;ee y,,9 4
4 U.S. Nuclear Regulatory Commission Page 2 AUG 011995 1
signifies that you have received this information and j
appropriate steps will be taken to update your controlled copies, and destroy superseded. material..This information contains safeguards material and should be-withheld from public disclosure.
If you have any questions, please contact me at (205) 729-2636.
Sincarci
', -q l
/
i Ped
'Salas anager of Site Licensing Enclosures cc (w/o Enclosures):
NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Mr.
J.
F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. Mark S.
Lesser, Acting Branch Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 U.
S. Nuclear Regulatory Commission (w/ Enclosure)
ATTN: Mr. David R. McGuire Chief, Safeguards Section, DRSS Region II l
P.O.
Box 2257 l
Atlanta, Georgia 30323 "i EO'JA80S tNCORMATON CLA$9 FICA 70N CE3 fCT P% e TO THIS PAGE WHEN
'EPARATED FRG,'.: ATTACHMENT j
i SAFEGUARDS I
n.mm u mn.
"v h o v..n n,iU BJ
e f
f,}
k% ;
J SAFEGUARDS 1
1
,,_ _,,.. e".
SjK !fij{M t R /
i 1
ENCLOSURE 1-i TENNESSEE VALLEY AUTNORITY EROWNS FERRY NUCLEAR PLANT (EFN)
-UNITS 1, 2i AND 3 EEECUTIVE'SUNNARY i
i TVA is currently installing a major physical security upgrade program (PSUP). at BFN.. This PSUP consists of a total' renovation-of the security system which,fwhen complete,.willLfar exceed the i!
capabilities of the existing system.
Changes to the securityL system are highlighted below:
Installation of redundant high speed, high capacity, state.'of I
the art security computer system.
1 New vital area (VA). door cardreaders with Local Intelligence Units (LIUs) containing microprocessors capable of controlling access to doors should a loss of communication with the j
security computer occur.
Biometrics recognition system using handgeometry to perform identification of a security' badge-holder prior to' admittance j
to the PA.
This redundant stand alone system provides the-j; ability to perform access > control should a loss of communication with the security computer occur.
i New protected area (PA) perimeter-fencing and: state of the art intrusion detection system (IDS), consisting'of'E-Field, Infrared, Microwave, E-Flex, and Optimesh.
{
l New closed circuit television system (CCTV) consisting of high tilt and zoom and video recording capabilities..
l resolution' solid' state cameras with automatic. call up,: pan-
't New central and secondary alarm stations (CAS/SAS) an'd-hardened alarm station buildings.
)
e New uninterruptable power supply (UPS) and security diesel building.
New West Access Portal-(WAP)."
Upgraded East Access Portal (EAP); and, l
Upgraded. vehicle sally portz-at both. portals.
Upon completion of the PSUP, TVA will eliminate much of-.the:large-
)
armed security force which has compensated for an: antiquated security system, and replace compensatory officers with 1
1 hj. ((
{g]
SAFEGUAHOS ;NFCRMATION CLASSIFICATION COES NOT AFm Y TO THIS PAGE WHEN
" ' " " " " " " ^ * " " ' " '
INFORMATION z
.'A.F,.A.i.A.RDR i
t
~
- I 's
/ 1
' t I
technology installed by' the7SUP'th8t-'W1'Irexceed existing capabilities.
Some of the measures that will no. longer be required are as follows:
Additional armed motor patrols on PA perimeters due to inadequate CCTV coverage will be replaced with new CCTV system consisting of over 70 CCTV cameras.
- Additional armed plant foot patrols to compensate for outdated VA door hardware will be replaced with new VA cardreaders, electromagnetic locks and LIUs.
l Security badge issue officers will be replaced with handgeometry readers at PA portals.
Additional CAS/SAS operators manually logging alarms to compensate for outdated system will be replaced with an automated paperless system.
The attached Revision 0 to the Security Plan reflects the new system installed under the PSUP.
Since the PSUP actually increases the ef fectivenesr. o:! the BFN Security program, TVA is submitting this revision under the provisions of 10 CFR 50.54(p).
These changes do not reflect a reduction in level of security commitments or take exception to current regulatory requirements.
Revision 0 changes reformat the plan to create a more user-friendly PSP /CP, to eliminate redundancy, and to identify revisions affected by the PSUP.
I a e4
. ;".,1 ".1 ATT/syg;7P MS F,e E
-y~
"v+
j 3AFEGUARDS i
WFORMATioN
1 l
r
'1
, ;. c ~,': a r mO
.i
-,lR:* C'GJiis JV
{
\\
.,s.e
.i
- a --
l ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWN 8 FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 t
i PHYSICAL SECURITY / CONTINGENCY PLAN REVISION 0 See Attached L