ML20087B400
| ML20087B400 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 01/06/1992 |
| From: | Reynolds N WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Bloch P, Bright G, Schink D Atomic Safety and Licensing Board Panel, TEXAS A&M UNIV., COLLEGE STATION, TX |
| References | |
| CON-#192-12489 OL, NUDOCS 9201130109 | |
| Download: ML20087B400 (1) | |
Text
.
/22/El WINSTON & STRAWN
.. tnt :it.
rnEDEmick N wrNSTON positese) 1400 ( STREET, N W.
cueaoo cwna sus a sinam.0891-1646)
WASHINGTON DC 20005 3$02 as west wacarm parve CHIC.aOO 6WN>5 We 72 JAN -9 P4 :06
- * ~ ~
trez, a s700
~, w
. o.m.
8AC$%titt (702) 3715950
. r r n e ?[;at.its / ~,. a wth s'.atti tr m,
hh January 6, 1992 Peter B.
Bloch, Esquire David R. Schink Chairman, Atomic Safety and Department of Oceanography Licensing Board Texas A&M University U.S. Nuclear Regulatory C;ollege Station, Texas 77843 Commission Washington, D.C.
20555 Mr. Glenn O.
Bright Atomic Safety and Licensing Board U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Subj:
Washington Public Power Supply System (WPPSS Nuclear Project No. 1) Docket No. 50-460-OL Gentlemen:
In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby submits its quarterly status report regarding construction activities at WNP-1.
During the fourth quarter of 1991, no significant safety-related construction activities were performed at WNP-1, although a limited engineering effort was continuing.
We do not
. anticipate any change in this level of activity during the next several months.
Sincer y,
D 1
I Nicholas 3
Re do Counsel or'Ap
. ant cc:
Service List 8) 9201130109 920106 PDR ADOCK 05000460 p
G PDR