2840525940 PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. E;OX 8699 PHILADELPHIA. PA.19101 FEB 161984
'*"-4 m,.u.... _. m., _,....
- Mr. Thomas E. Murley, Direc tor United States Nuclear. Regulatory Commission Office.of Inspection and Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406 Subj ect: USNRC Bulletin dated July 22, 1983 IE Bulletin 83-06 Nonconforming Materials Supplied by Tube-Line Corporation Facilities at Long Island City, New York; Houston, Texas; and Carol Stream, Illinois Limerick Generating Station - Units 1 & 2 Ref erenc e: Letter:
J. S. Kemper to T. E. Murley, USNRC Dated 11-17-83 File: Government 1-1 (IE Bulletin No. 83-06)
Dear Mr. Murley:
The following is our complete response to NRC IE Bulletin 83-06 concerning possible nonconformities of Tube-Line Corporation supplied ma terial. To completely respond to the Bulletin, Bechtel Power Corporation reviewed 415 vendors who provided material to various Bechtel nuclear proj ec ts.
The review identified 30 vendors who may have supplied '1bbe-Line material to the Limerick Generating Station.
It ms confirmed that only" one supplier, Guyon Alloys, Inc. of Harrison, NJ, delivered ASME
.. material from Tube-Line to the Limerick jobsite. A list of the material delivered from Guyon is presented in Att.1chment 1.
Tube-Line Corporation notified Bechtel (Attachments 2 & 3) that material received from Guyon under five purchase orders may not have been fabricated to ASME Section III requirements. The material identified included:
1.
An eight-inch blind flange (Attach.1, Pg. 2, Order 8031-F-57228).
2.
Ten six-inch 45 degree elbows (Attach.1, Pg.1, Order 8031-F-4 5718).
3.
_ Two four-inch S.R. 90 degree elbows (Attach.1, Pg.1, Order 8031-F-45829).
4.
Seven six-inch by three-inch concentric reducers (Attach.1, Pg. _2, Order 8031-F-48026, Item 3).
5.
A four-inch L.R. '90 degree elbow (Attach.1, Pg. 2, Order 8031-F-48216, Regn. 73881).
8403090055 840216 PDR ADOCK 05000352
\\\\
G PM i
2840525940 Mr. Thomas E. Murley, Director NRC Office of ~ Inspection and Enforement, Region I Page 2 The disposition of the material identified by Tube-Line is described below.-
The eight-inch blind flange, the six-inch 45 degree elbows, and the four-inch S.R. 90 degree elbows (Items 1, 2, and 3) are still at the jobsite. In a letter to the NRC dated June 9,1983, Tube-Line verified that the eight-inch blind flange was properly heat treated per ASME SA-182 requirements and was suitable for use. The ten six-inch 45 degree elbows and one four-inch S.R. 90 degree elbow have been quarantined per NCR 7375 and are awaiting shipment back to Tube-Line. The other four-inch S.R. 90 degret elbow has been installed in a non-safety rel.ated system and has been accepted for use by the engineering disposition given on NCR 7375. Items 4 and.5 were returned to Tube-Line and have been replaced with stainless fittings supplied by Q21f and Western-Taylor.
The other items listed on Attachment I have also been returned to Tube-Line. These items are:
1)
Twenty Efive four-inch by two-inch concentric reducers (Attach,1, Pg. 2, Order 8031-F-48026, Item 1) 2)
Ten three-inch caps (Attach.1, Pg. 2, Order 8031-F-l.R216, Regn. 73387.
All other Tube-Line supplied ASME material has been accepted for use in accordance with Bechtel Specification P-309.
This material includes a three-inch 45 degree elbow (Attach 1, Pg.1, Order 8031-F-45718, Item 6) which has been installed in the Standby Liquid Control Sys tem.'
The remainder of the Tube-Line ASME ma terial accepted under P-309 has not been installed and has not been assigned to a system.
In' m2mmary, except f or the elbow installed in a non-saf ety related system, all Tube-Line material delivered to Limerick Generating Station
- has been 1) manufactured per ASME code requirements, 2) replaced with material that has been manufactured per ASME code requirements, or 3) will be returned to Tube-Line. The above statement concludes our response
. to NRC IE Bulletin 83-06.
Sinc erely, N
'J Mdsdger Engineering and Research I)epartment JPE/drd /840209 Attachment Copy to: Director of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 S.K. Chaudhary, USNRC Resident Inspector
2840525940 COMMONWEALTH OF PENHSYLVANIA :
ss.
COUNTY OF PRTT.A N HIA JOSEPH W. GALLAGHER, being first duly sworn, deposes and says:
That he is Manager, Engineering & Research Department of Philadelphia Electric Company, the holder of Construction Permits CPPR-106 and CPPR-107 for Limerick Generating Station Units 1 and 2; that he has read the foregoing final Response to IE Bulletin 83-06 f% Docket Nos. 50-352 and 50-353 and knows the contents thereof; and that the statements and matters set forth therain are true and correct to the best of his knowledge, information and belief.
& _ Ab &1=
LJ G
Subscribed and sworn to beforemethis/hD day of 2428f_d W (f8M t
t
' ' a % 4*3 h k k 2
,if Notary Public Y,
PhTRICIA D. SCHOLL
, / Ncesty Pubkc, l'hdadelphia. Philadelphia Co.
My Commissbn Empires Fetc.iy 10,1935
~..
~
)
TUBULAR PRODUCTS FOR THE ENERGY INDUSTRES A South Fourth Street, Harrison, N.J. 07029 (201) 485 5050 September 30, 1983' Bechtel Power Corporation P.O. Box A Sanatoga Branch ExnIBIT B031 Pottstown, PA.
19464 Dechtel Power Job Ho. 8031 Philadelphia ElectrJ.c Co.
Attn:
Mr. Gary Coughlin Limerick Generating Station Bechtel Site Manager cc:
S.I. Heisler, Mgr. PSQ-Bechtel-San Francisco
Subject:
NRC IE Bulletin No. 83-06 Tube-Line Corporation Philadelphia Electric Co. Limerick Nuclear Power Station With reference to the subject NRC IE' Bulletin and as part of the process of pro-
.viding infonnation requested by your San Francisco Corporate office by means of copy hereof, please be advised that the following listed items with applicable order numbers constitute all nuclear quality material of Tube-Line manufacture or origin which has been furnished by Guyon Alloys directly to you at the Limerick plant site.
d The listed items were purchased by Guyon Alloys from Tube-Line in accordance with yourstipulated nuclear procurement requirements based on' ASME qualification and accreditation of Tube-Line by issuance of Quality Systems Certificates (Mater-1als) QSC-434 and QSC-435, and the inclusion of Tube-Line in the 8echtel Evaluated Supplier List (ESL) of Qualified Material Manufacturers and Material Suppliers.
Order No. 8031-F-45718, Regn. 70033 lItem #4 ' Oocs 6" S/10 SA-403 Grade WP304W 45' Elbows of Tube-Line Heat Code AACB
~
- 5 'Opcs 4" S/10 Ditto Heat Code AACK4
- 6 1 pcs 3" S/10 Ditto Heat Code AACA Quw o lum irrut <Nk.ih ?. * 'h.?'I?f EP,*Ab4bO 'n. it ps, Gwan+1nocL per
^
k
- D Order NO. 8031-F-45029, Regn. 71107, Item #12 pes 4" S/10 SA-403 Grade WP304W S.R. 90* Elbows of Tube-Line Heat Code AAC8 l
Above shiooed 1/14/82 Order No. 8031-F-45936. Regn. 70362A Item #5 2 pes 6' S/10 SA-403 Grade WP304W Tees of Tube-Line Heat Code AADO Above shipped 1/14/82 l
Order No. 8031-F-48025, Regn. 72454 Item #16 pes 8" S/10 SA-403 Grade WP304W L.R. 90' Elbows of Tube-Line Heat Code ACFD d2 20 pes 6" S/10 Ditto Heat Codes ACFC(10), AACC(8), & AAYP(2)
I
- 3 2pcs 10" S/10 Ditto Heat Code AACD Item f3 above shipped 3/3/82., Items #1  shipped 4/22/82.
I
m ac uewr 1 - ace 2 2840525940 20YUN ALLOYS,IE, eg#
{' ULAR PRODUCTS FOR THE ENERGY INDUSTRES 950 South Fourth Street, Harrison, N.J. 07029
~
(201) 485 5060 PAGE #2 der No. 8031-F-48026, Regn. 73153 m #125 pes 4" X 2" S/40 SA-403 Grade WP304 Concentric Reducers of Tube-Line Heat Code AADA Item #1 above shipped 3/3/82 with the following material which per our records was returned by you to Tube-Line per Guyon Alloys confinning MRA 582-WA491 of 5/26/82,
./ Tube-Line RGA f4204.
em f3 7 pes 6". X 3" S/80 SA-403 Grade WP304W Concentric Reducers of Tube-Line Heat Code AAEL Item f3 was replaced with 7 pes of 6" X 3" SA-403 Grade WP304 Concentric Reducers of Gulf & Western-Taylor Forge Stainless manufacture and Heat Code JSXS which were shipped 6/16/82.
-der No. 8031-F-48216, Regn. 73387 & 73881 -
l
.em #1 (Regn 73387) 10 pcs 3" S/80 SA-403 Grade WP304 Caps of Tube-Line Heat Code AAECH Above shipped 2/5/82. with the following material which per our re-cords was returned by you to Tube-Line per Guyon Alloys confirming
/
MRA 582-WA490 of 5/26/82. Tube-Line RGA #4205.
- t
- 1 (Regn 73881) 15 pcs 4" S/80 SA-403 Grade WP304W L.R. 90" Elbows of Tube-Line Heat i
Code A8 LAC (lpc.) and A8QE(14pcs).
Item #1 for Regn. 73881 was replaced with 15 pes of 4" S/80 SA-403 Grade WP304 L.R. 90* Elbows of Gulf & WesterrrTaylor Forge Stainless manufacture and Heat Code JSXI which were shipped on 5/21/82.
l rder No. 8031-F-48339, Regn. 75335 Item #110 pcs 3" S/80 SA-403 Grade WP304 Caps of Tube-Line Heat Code AAECH above shipped 2/5/82.
rder No. 8031-F-57228, Regn. 87520 Item #11 pc. 8" 150f SA-182 Grade F304 RF Blind Flange of Tube-Line Heat Code A8XA above shipped 2/21/83.
Per Tube-Line notification letter dated 4/25/83 and Guyon Alloys notification lotter dated 5/3/83 sent to the attention of your Mr. Drew Krapf, you ire initially advised of the possibility of the one 8" 150f Blind Flange furnished for order 8031-F-57228 not having been heat treated in accordance with the requirements of SA-182.
Subsequently, per Tube-Line notification letters dated 5/6/83 to you and Cuyon Alloys Tube-Line additionally advised of the possibility of four items of olbows and reducers having been produced as or from welded with filler matal mater-l 1al which had not been manufactured by an N-type certificate holder, Code stamped,
~
furnished with Code required Data Reports.
nst i
=,. - - - - - -
MYM AEURIn
""fiy ATTAC'! PENT 1 - PACE 3 q
.l UBut.AR PRODUCTS FOR THE ENERGY INDUSTR!ES 50 South Fourth Street, Harrison, N.J. 07029 d,,485 5050 Page #3 By means of a letter dated 6/9/83 to the NRC with a copy to Guyon Alloys and possibly a copy to you, Tube-Line advised that the heat treatment records applica-ble to the one 8" 150f Blind Flange furnished for order 8031-F-57228 had been re-trieved and that this flange had been properly heat treated per SA-182 require-ments.
1
-The Tube-Line notification letters of 5/6/83 regarding~ welded with filler
. metal items were partially incorrect by including two items which had been re-
. turned by you to Tube-Line as previously indicated herein, i.e. seven 6" X 3"
,S/80 reducers of Heat Code AAEWa initially furnished for order 8031-F-48026 and one 4"_3/80 L.R.. 90',61 bow f aitally furnished as one of 15 pieces for. order.8031sF-4,8nt.
Accordingly, the material received and to date retained by you whi:h is affected by the possibility of having been produced as or from welded with filler metal mater-ial consists of only{ lopes. of 6" S/10 45' elbows of Heat Code AA 2pcs of 4" S/10 S.R. 90' elbows of Heat Code AACS furnished
{
ge Per telephone advice from your Mr. Don Davis to our Jack Gardner at our Wayne, k
(~.nna. office on 9/27/83, we understand that the 10 pcs. of 6" S/10 45' elbows of I
l.
Heat Code AAC8 furnished for order 8031-F-45718 have not been installed and are quar-s antined at yoursite.. Also, that you desire and have requested authorization to re-g turn these 10-6" S/10 45' elbows to Tube-Line.
We have requested Mr. Davis to deter-s mine and advise the corrent status and condition of the 2 pes. of 4" S/10 5.R.90'
)
elbows of Heat Code AAC8 in order that we may possibly arrange for tne return of r
the 4" 90* elbows with the 6" 45' elbows. '
b Based on the foregoing advice and the actions required by the referenced NRC Bulletin of nuclear power facilities holding an operating license or construc-tion gruit, we request forinal advice of the location, status, and any propossd
-disposition of the balance of* the items listed herein.
This advice may be fumished to our Wayne, Pa. sales office servicing your account, or to the writer, and ' hould include details of any commerical considerations affected by the proposed disposition.
For your further assistance in responding to NRC IE Bulletin No. 83-06 with re-
- gard to possible indirect receipt of material of Tube-Line origin, please also be advised that the Bulletin 83-06 Table 2 listing of companies receiving material of Tube-Line origin purchased by Guyon Alloys is correct and complete.
We thank you for your cooperation with regard to this matter.
Ve truly yours.
o corrected GUONAhl0
!i 10/3/83 d
L gT Nw4 L
George H. Grunthaler Vice President GHG:nt_
Technical Services
g, 3
umener 2 - 1%se 1 2840525940 l E'M l TUDE LINE
~
CORPORATION j*
oO ra., o.
)2 90 000 8
STAINLESS STEEL DIVislON April 25, 1983
~
Bechtel Power' Co.
c/o Phillip Electric Linerick General Station Evergreen Road Pottstown, PA.
19464 Attention:
Quality Assurance Manager Gentelmen:
We shipped to you pursuant to purchase order issued by you to Guyon Alloys the stainless steel flanges listed on the attahced Appendix A on the dates indicated.
We have recently initiated a comprehensive review of our Quality Assurance Program. This review has indicated that the items listed may not be heat treated in accordance with all of the requirements of ASME'SA-182.
We have initiated steps to determine whether the physical properties.of the items shipped to you differ in any material respect from items heat treated to ASME SA-182 We would like to meet with you as promptly as possible once the test results are available to evaluate them and to detemine whether any upgrading or replaccment is required.
In the meantime, we request that you ascertain the location of each piece involved and that there be no further installation of any pieces currently under r.eview.
We are undertaking this effort to ensure that any potential safety Problem is addressed at the earliest possible time and because we value our reputation as.a supplier of high quality products.
Very truly yours,
'S arkey 6
~
4 ice Presid General Manager Tube-Line poration
'JJS:st encloure e
}
,wr----- - - - - +., - -
.-------e
[
ld )*
l'id J I 'o.o'.
A'1"rACUMENT 2 - PAGE 2 2840525940 CUSTOMER:
Bechtel Power Co.
8.O.4/- 803 /- F-572 2.F Pottstown, Pa.
PURCHASED BY: cuyon Alloys O
TU E-LINE CUSTOMER QUANTITY DESCRIPTION GRADE DATE HEAT CODE PURCHASE ORDER 1
8" 150# RF Blind 304 2/16/83 ABXA A 62900tM M=4 Mmen+ f= rope /y cscerniniked hS J)
.Asnar SA -/B 2. sEme. G-u-ym /e%er 9/ao/as c
G 9
6 e
9 l
D l
e,"
7 e
9 e
m-
^mc== 3 - aror 8 aM TuseUNE 2840525940 e
@ 6 g.
CORPOR M N 170 Teowe c * ~ ~rDme
_1I
- r. oin..,.e "
g3g F210676 STAINLESS STREL DlWSION y 6, 1983 Bechtel Power Corp.
- p., -
1 c/o Phila. Electric Corp.
y j
{
Limerick Generating Station P.E.CO.
Evergreen Rd.
FIELD QA ORANCH l
Pottstown, Pa.
19464 I
l NAY 16 m) l, 1 4 ~
,,,,. (
Attention: Quality Assurance Manager Centlanent We shipped to you pursuant to purchase ortler issued by you to Guyon Alloys, Inc.
the stainless steel fittings ltated on' the attached Appendi.i A.
We have recently initiated a comprehensive review of our Quality Assurance Progress. Viis review has indicated that the itano listed uhich were made freus A-240 plate and which appear to have been welded with filler metal were not manufactured in accordance with all of the requirements of sh-403 and section III of the ASME Boilar & Pressure vessel Code.
Vie particular requirements to-volved concern NPT symbol stamping, verification of welding procedures and welder qualifications, verification of welding work by an authorised inspector, receipt of Data Reports f ams the manufacturer, and verification of the chemical properties of the weld metal used in the fittings under review. De have tattisted steps to detenaline the chemical properties of the weld metal and whether any of the fittings were welded without filler metal.
We are sending this notice to you pursuant to 10 C.F.R. 921.21(a) and have provided a similar notice to Guyon Alloys, Inc.
We are undertaking this eff ort to ensure that any potential safety problem la evaluated at the earliest possible time and because we value our reputation l
as a supplier of high quality products.
9'
~~
f' Very truly yours, n
1
\\ p <-
/
f c
[J
. Sharke Vice-Pres t & General Manager cg,,,
,.,:, UIi M Tube-Line Corporation i
JJSist enclosure t
i i
i
}
g
... _.. -.. )
~
i
^
1 l
e
.9' anacnun a - vacu 2 F210G76 May 6, 1983 i
o I
SHIPPED TO:
Bechtel Power Corp.
1 c/o Phila. Electric Corp.
Limerick Cenerating Station Evergreen Rd.
Pottstown, Pa.
19464 CUS*lVMER:
Cuyon Alloys, Inc.
'Ibbe-Line Customer Quanity_ z$sm _ Description Grade fleat Code Purchase Order 2
'[0 4" SR 90 103 304 AACB A-51372-NW 7.
(2) 613" CR 808 304 AAEW A-51770-NW 10
(.9) 6" 45 los 304 AACB A-51346-NW I
(4.)
4" LR 90 805 304 ABLAC M 3.ayon jeWer (AHachmenh /).27mlicad** /E5 W "A-517gNW 7"""
. 2-t em (Q
/-C'Oucu cu"2+inecL-+ /~ znaha)/ed-y=ar /VW M5 tzy + e aca wace car na na-ca.ph--a.- wis s