Monthly Operating Rept for Dec 1991 for Wolf Creek Generating Station
ML20087B289
Person / Time
Site: Wolf Creek 
Issue date: 12/31/1991
From: Bailey J, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NO-92-0011, NO-92-11, NUDOCS 9201130071
Download: ML20087B289 (7)


Text

.

LF CREEK W@ NUCLEAR OPERATING

.6hn A tudey v4. e,.m.n op...t.

January 10, 1992 NO 92 0011 i

U. S. Nuclear Regt.latory Cormninston ATTHe' Document Control Desk Hail Station Pl.137 Washington, D. C.

20$$$

Subject:

Docket No. 50 482:

December, 1991. Monthly Operating Report

-Gentlemen Attached is the Lee aber, 1991 Monthly' Operating Report for Wolf Creek

-Generating. Station.

This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours, 8

I John A. Bailey

}

Vice President Operations JA3/aem Attachment cc A. T. Howell (NRC) v/a R. D. Martin (NRC), v/a G. A. Pick (NRC), w/a W. D. Reckley (NRC), v/a

/

l

),/

il g ' wl %.

- " ~ ~.xs m e>>,ere. o'e>>e4 ee><

l

,e An EQva! OMortuNf y Erngdoyer M F tCVE1

i Att$chmenttoNO 92-0011 WOLF CRDE !KCEAR OPUaT110 CUtAUMTIQi RHE CRFIK GDElWTItG Erl?&IGI H2111113 OPDMTDG RUTRT M2 mis t m.wrbor YFAR: JS1L Docket !b. : 50-482 Facility Op1 rating License Ib.: IFF-42 Report !b.

82 Pryd bys

}hrlin G. ' William

kt'tacha ent hNO 92-0011 I

St W M Y

'Ihe followring mport highlights the operating experience of m1f Crmk Ganorating Station for the mxith of Doocmber,1991. '1his mprt is luing providcd pttratwit to ubchnical Specification 6.9.1.8.

1.

SIMERY OP OPDWTIfG EXPD11DCE

'Ihe unit meined shut down the entire nonth of Deccuber 1991 for rufuoling activities, with Deccmber 31 mprusenting day 103 of the continuing mfueling outago. Sho unit mrnined in Mot's 5, cold shutdown for the rettim nonth of Docxmter. thit matart la being dehyed

' ling resolution of noter croratcd valve issues.

l II. MAJOR SM'!7W RE2ATED MAINrDWCE NJf1VITIIE 1.

Ongoing inspection, testing, evaluation, and resolution of notor operattd valves.

i Wlf Creek Generating Station Monthly Operating Report Leccuber 1991 P:nge 1 of b

Attachment to NO 92-0011 CPDMTI!U IMTA RFTOIT DOCKF7P 10, 50-482 NOLP CREEK GDiMMT110 STATICE WJLF CREEK IRICLEAR OPD& TIE 00RIOWTION DNPE 01-01-92.

OrMPLF71TD IW_Ji,,,W1111ane TELEP!KNE 316-364-8831 OPU RTllo STRIUS 1.

Heporting Pericd Decmter. 1991 Grtes ikxtra in Heporting Pc11cds 744_

2.

Currently Authorized Power Invol(IMt) lilj. Max. Depard. Capacity (!No-tht) _,113 Design Electrical Rating (MWe-!bt):

11*LO 3.

Power Invol to Which Restricttd (If Any)(Msh-lbt).

_ll/A 4.

Reasons for restrictico (If Any) _

N/A _

'Jhis Month Yr. to Dato Cmatlativu S.

Number of flours Reactor was Critical 0.Q,.,_,6,294.6

,,.43,690.1

6. - Reactor Reserve Shutdown 11ours

_,,_.9 0

_D., Q _

.2)LL 7.

Ilours Generator at idne 0.0 1,288 4,,_

_43,112.2,

.8.

. thit Ret,arve Shutdown liours 0. 0__,

0.0 0.Q_

9.

Gmse 'Ihermal Energy Generated ()MI)

__Q_,

18,020 55.Q 140,093.591

10. Gross Electrical Enem y Generated (bHI) 0

_s,198,737 48,713,506

11. Net Electrical Energy Ganarated (FHi)

O

_S.,S50,5L3 _45,455,471

13. Reactor Service Factor

. _,_ 0.0 71.9 _

_ 78.0

13. Reactor Availability Fector 0 Q,

_ _ l l d __,

79.4

14. Ittit St.rvice hctc,r 0. 0____

71.8

, 77.7 -

15. Unit Availability Factor 0.0 71,8 77.7 16.. tinit Capacity Pactor (UsinJ MDC)

_ Q,.0 58. 9_,

74,.Q_

17. thit Capacity Factor (Using rrssign NWe)
0. 0_,,,

57.2 _

71.6

18. Unit Forced Outage Rate-0.0 0.0 3,.5_
19. Shutdowns Scheduled Over Ibxt 6 Months (Type, Data, and Duration of each): N/A
20. If Shut Down ht End of Report Period, Estinated Date of Startup: January 13, 1992 Wolf Crook Generating Station Manthly Operating Report Ibcmixsr 1991 Page 2 of 5

At'tachment to NO 92-0011 AVITUGE IRILY UtilT IOilR IJNIL IXD'22 DD. _h.Q-4.22 MEP CRPJX GIMDmT110 m'Kr101 MIF CRE!I !TJCIItJt OPDMTI!U CullORTIOJ 4

IWrE 01-01_22._

QFJti!I'lD BY M. Willinmn TEII11 DIE.3J6-lk4-0831

]

tumi IW urder, 1921 IWY AVIPJGE IRILY 1%TR IJNEL IWY AVlWGE r%ILY IOfLR IJNEL (Mb-lbt)

(Mhlbt) j 1

0 17

!)

2 0

10 _

0 3

0 19 0

4 0

20 0

5 Q

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 _ y, 0

11 0

27 0

la 0

20 0

13 0

29 0

14 0

30 0

15 0

31 O

A6 0

v y.

Wolf Crxx& Generating Static 1 tbnthly Qerat.ing ikgr>rt Docuter 1991 Page 3 of 5

N

=

UNIT SHUTDOWN AND F74ER REDUCTIONS DOCEET NO.

50*482 O

VOLF CEEEK GENERATING LIATION 5

VOLF CREEK NUCLEAR OPERATING CCRFCEATION 3

DATE 01-01-92 COMPLETED nY M. William TELEFHCEE 316-364-683f REFORT MONTH December. 1991

r o

O.

N EEASON l METHODS Situ 111NG TYPE

)OWN THE REACTOR CCEREZIVE ACTIONS / COMMENTS a

F: FORCED DURATION g

o No rate S: SCHEDULED _

(BOUP,5 )

(1) f st REDUC::) POWERC21 5

[

3 911201 S

744.0 C

4 Continued refueling outage.

1 l

l 1

I I

SUI 9EARY:

The unit remained in a refueling outage throughout the =onth.

1) REASON: A: EQUIPMENT FAILUEE (EIFIAIN) E: OPERATOR TEAINING AND LICENSE 'EIAMINATICN (2) hr.idOD:

1.

MANUAI 2.

PAWAL SCFAM B: MAINTENANCE OR TEST F: ADMINISTEATIVE 3.

AUTCMATIC SCEAM C:

Er.r u t. LING C: OF~r.aATIONAL ERECR (EIFLAIN) 4 CONTINUED D: Rt W TORY RESTRICTION B: OTHER (EIFIAIN) 5.

FJi'ITJCED LCAD 9.

OTEER Wolf Creek Generating Station Monthly Operating Eeport December 1991 Page i of 5

Attachment to h0 92-0011 WOLF CRDZ IRELEAR OPD%TIIG OCRIURTIQ1 NOTE CRDZ GDElmTIlG STATIQ1 (UIT 10.1 Kuni Dxutber, 1991 StMMARY OF OPD%TIIG 12PDlIDCE Lioted below in chronological soquence is a suannry of oparating experiences for this nanth witich rupti.rud load reduction or resulted in significant ron-load related incidants.

ggg HMg INrWP Dramter 1,1991 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> unit in Modo 5, cold shutdown.

Dacmber 31, 1991 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit in Modo 5, cold shutdown.

l l

I l

tb1f Cruck Generating Station Monthly OpeInting Report Docarber 1991 Page 5 of 5