Forwards Simulator Certification Rept,Beaver Valley Power Station,Unit 2
ML20087A161
Person / Time
Site: Beaver Valley
Issue date: 12/30/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087A163 List:
References
NUDOCS 9201080220
Download: ML20087A161 (2)


Text

)

Beaver Va%y Power Stanon Shippmopo PA 15077-0004 (412) 3915h,

kcNr$sfdnIfNoclear Group l

U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 Referenco:

Beaver Valley Power Station, Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 Simulntor Certification Report (10CPR55.45)

Gentlemen:

The purpose of this letter is to submit the Certification Report for the Beaver Valley Unit 2

Simulator in accordance with 10CFR55.45.

Duquesne Light Company by forwarding this report as required by 10CFR55.45 (b)

(5)

(i),

certifies that Beaver Valley Unit 2

is a plant-referenced simulator which meets the Commission's regulations.

Enclored is a completed NRC Form 474.

Questions can be directed to Mr.

Thomas W.

Burns, Director -

Operations Training at (412) 393-5751.

Very truly yours, f

I 1

1 ja Yhhn

. aleber JDS/TWB/cag Enclosure cc: Mr. Thom*

E. Murley, Director, Office of Nuclear Reactor Regulation (with enclosure)

Mr. J.

Beall, Sr. Resident Inspector (w/o enclosure)

Mr. T. T. Martin, NRC Region 1 Administrator (w/o enclosure)

Mr. L. H. Bettenhausen, Chief Operations. Branch Division of Reactor Safety Region 1 (w/o enclosure)

Mr. R. M. Gallo, Chief Operator Licensing Branch (w/o enclosure)

Mr. A.

W.

DeAgazio, Project Manager (w/o enclorure)

Ah l

/

h'.{

sa1otessaSilasli

i P

[

.n,-

.+.h, a,

-n s

+

NRC (Olas474 U1 NUCLE AR HE GULA10nY COMMlJ510N e.#tRQvtD8fOMS NO. 3 ttoet 34 (1403 to Ce3165 a4fb),

i RPiRis: 93047 66.e CW ll A ESTIMATED svR0(N MR Rf 5PON51 TO COMTLY WITH tms INF ORM A tlON Cot t ECTION R E Qut ST: t Jo MR$, eORw ARO SIMULATlON FACILITY CERTIFlCATION

=;"A~?J't,';OtoWyafg='~,',,7J,? A',,";', fat US NLACLf aR Rf outAtORY COMMISSION WASHierOtON, DC 20Z6, AND 10 Te1E P Aef RwORIr Fit DUCTION f*OJfc7 (1154 C12) DFfICt De MANAGEWENT A4D $UOGET, W A4WNiTOsu, DC 2ttfiC3 INSTRUCTIONS, The foem is to to films for Init:el certification, recertifmation lif requiredt anrf for aey change to e simuletion facdity performenes inting plan made af er initial t

submittal of such a pton. Provide the fononing mtormaton, avi check the appropriate bou to 6ndicace renon for submittat.

F ACILIT Y lDouE ! NUMtRR Beaver Valley Power Station Unit 2 S412 uCENstt joATE Duquesne Light Company 12/16/91 The is to certify that:

1 The above named facility licensee is using a sirnulaten facility cons stmg sole'y of a piantreferenced simulator that meets the requirerr ants of 10 CF R 55.45, 2.

Documentstion a eveilable for NRC review in accorda me with 10 CF R 55.45(bL 3.

This simulation facd.ty meets the M$ance contained m ANSI /ANS 3.6,1985, at endorsed by PeRC Regulatory Guide 1.149.

lf there are any exceptioens to the cerlificationof th4 nom, check here j X) end describe fuHy on additional pages as necessary, NAME for otherident//scetion) AND LOCATION OF S!MULATION F ActLIT Y Beaver Valley Power Station Unit 2 Simulator Beaver Valley Training Center Shippingport, PA 15077 y

SIMULATION F ACluTY PE R FORMANCE TE ST ABST RACTS ATTACHEO, (forperformence tears canctucted m the pered nooing with the r/are et tha certifketion)

DESCR IPTION OF PE R FORMANCE TESTING COMPLETED (Attach addithmelpegelsi as necessary, and identify the tren-coecrserwn poing contmund)

Initial Certification - see enclosed Transient, Steady State, Malfunction, and Normal Operating Test Abstracts, 54MULATION FACILITV PERFORMANCE TESTING SCHEDVt E ATTACHED. (for the conduct of appiommare/r 2516 o/pedurmance tests per year for the four year N

pered commencing with the date of this corYification.)

ESCRlPTJON OF FERF0RVANCE TESTaNG TO 8E CONOUCTED. (Attsch additoonelpage(s)as necessary, and odm.i!y the bem derruptkm bemycontinued)

Refer to enclosed Test Schedule.

PE R FCR MANCE TESTING PLAN CH ANGE, (for any modification t? a perforre v<e testmg plan submtried on a previous certification)

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Artech sdditionetpos lslae r'ecessery end mentify theitem descrroten beirvicanteved) w Not applicable.

Initial submittal.

R ECERTIFiCATION (Osecnbe w in setens tanas, ettsch roevits of comploredpe formance restmg in accordance wrth 10 CFR } $$.4${bl(5)ts),

Attact aMtionalpegels) as neansanry, and ioentify the kom dencn' ro" being contmuet) o Not applicable.

Initial submittal.

Any faite st#tement or omission in this d fedht, ;ncluding ettact1ments, may be subject to cffil and Crimmel sanct6cos. I certify under penafty of perjury that the infortri tion in th% documerft and attachments og true and correct.

'GN RE, AUT CRIZED REPRESENTATIVE l TITLE l0 ATE J /h. Sie e

~

Vice President, Nuclear Croup U - 3o - W la pance wetfi 10 CF R g 55.5, Communications, ther form 5ttalt be a.btnttted to the NRC as foHows:

8Y Mall ADDRESSED TO: Detector,Of&e of Nuc6eer Rasctor Reguistion BY DEllVE RY IN PE RSON One whete Fhnt North U A Neeseer Regutatory Conimission TO THE NRCOFFICE AT:

11656 Roded6e Ptke Wasnessen, DC 20564 Recueille, MD enRC FORM 47e f f Mi

_.