Forwards Simulator Certification Rept,Beaver Valley Power Station,Unit 2
ML20087A161
Person / Time
Site: Beaver Valley
Issue date: 12/30/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087A163 List:
References
NUDOCS 9201080220
Download: ML20087A161 (2)


Text

)

Beaver Va%y Power Stanon Shippmopo PA 15077-0004 (412) 3915h ,

l kcNr$sfdnIfNoclear Group '

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Referenco: Beaver Valley Power Station, Unit No. 2 BV-2 Docket No. 50-412, License No. NPF-73 Simulntor Certification Report (10CPR55.45)

Gentlemen:

The purpose of this letter is to submit the Certification Report for the Beaver Valley Unit 2 Simulator in accordance with 10CFR55.45. Duquesne Light Company by forwarding this report as required by 10CFR55.45 (b) (5) (i), certifies that Beaver Valley Unit 2 is a plant-referenced simulator which meets the Commission's regulations. Enclored is a completed NRC Form 474.

Questions can be directed to Mr. Thomas W. Burns, Director -

Operations Training at (412) 393-5751.

Very truly yours, f I 1 1 Yhhn . aleber ja JDS/TWB/cag Enclosure cc: Mr. Thom* E. Murley, Director, Office of Nuclear Reactor Regulation (with enclosure)

Mr. J. Beall, Sr. Resident Inspector (w/o enclosure)

Mr. T. T. Martin, NRC Region 1 Administrator (w/o enclosure)

Mr. L. H. Bettenhausen, Chief Operations. Branch Division of Reactor Safety Region 1 (w/o enclosure)

Mr. R. M. Gallo, Chief Operator Licensing Branch (w/o enclosure)

Mr. A. W. DeAgazio, Project Manager (w/o enclorure)

/

Ah l h' .{

sa1otessaSilasli
i P [

, - , , .n,- .+.h, a, -n s --.

+ -- ,- , , - - , .- - , , , . . - ,,., -

, NRC (Olas474 U1 NUCLE AR HE GULA10nY COMMlJ510N (1403 e.#tRQvtD8fOMS NO. 3 ttoet 34 to Ce3165 a4fb), i RPiRis: 93047 66.e CW ll A ESTIMATED svR0(N MR Rf 5PON51 TO COMTLY WITH tms INF ORM A tlON Cot t ECTION R E Qut ST: t Jo MR$, eORw ARO

  • SIMULATlON FACILITY CERTIFlCATION =;"A~?J't,';OtoWyafg='~,',,7J,? A',,";', fat US NLACLf aR Rf outAtORY COMMISSION WASHierOtON, DC 20Z6, AND 10 Te1E P Aef RwORIr Fit DUCTION f*OJfc7 (1154 C12) DFfICt De MANAGEWENT A4D $UOGET, W A4WNiTOsu, DC 2ttfiC3 INSTRUCTIONS, The foem is to to films for Init:el certification, recertifmation lif requiredt anrf for aey change to e simuletion facdity performenes inting plan made after initial submittal of such a pton. Provide the fononing mtormaton, avi check the appropriate bou to 6ndicace renon for submittat.

F ACILIT Y Beaver Valley Power Station Unit 2 lDouE ! NUMtRR uCENstt S412 joATE Duquesne Light Company 12/16/91 The is to certify that:

1 The above named facility licensee is using a sirnulaten facility cons stmg sole'y of a piantreferenced simulator that meets the requirerr ants of 10 CF R 55.45,

2. Documentstion a eveilable for NRC review in accorda me with 10 CF R 55.45(bL
3. This simulation facd.ty meets the M$ance contained m ANSI /ANS 3.6,1985, at endorsed by PeRC Regulatory Guide 1.149.

lf there are any exceptioens to the cerlificationof th4 nom, check here j X) end describe fuHy on additional pages as necessary, NAME for otherident//scetion) AND LOCATION OF S!MULATION F ActLIT Y Beaver Valley Power Station Unit 2 Simulator Beaver Valley Training Center Shippingport, PA 15077 l

y SIMULATION F ACluTY PE R FORMANCE TE ST ABST RACTS ATTACHEO, (forperformence tears canctucted m the pered nooing with the r/are et tha certifketion)

DESCR IPTION OF PE R FORMANCE TESTING COMPLETED (Attach addithmelpegelsi as necessary, and identify the tren- coecrserwn poing contmund)

Initial Certification - see enclosed Transient, Steady State, Malfunction, and Normal Operating Test Abstracts, N 54MULATION FACILITV PERFORMANCE TESTING SCHEDVt E ATTACHED. (for the conduct of appiommare/r 2516 o/pedurmance tests per year for the four year pered commencing with the date of this corYification.)

ESCRlPTJON OF FERF0RVANCE TESTaNG TO 8E CONOUCTED. (Attsch additoonelpage(s)as necessary, and odm.i!y the bem derruptkm bemycontinued)

Refer to enclosed Test Schedule.

PE R FCR MANCE TESTING PLAN CH ANGE, (for any modification t? a perforre v<e testmg plan submtried on a previous certification)

DESCRIPTION OF PERFORMANCE TESTING PLAN CHANGE (Artech sdditionetpos w lslae r'ecessery end mentify theitem descrroten beirvicanteved)

Not applicable. Initial submittal.

R ECERTIFiCATION (Osecnbe w in setens tanas, ettsch roevits of comploredpe formance restmg in accordance wrth 10 CFR } $$.4${bl(5)ts),

Attact aMtionalpegels) as neansanry, and ioentify the kom dencn' o ro" being contmuet)

Not applicable. Initial submittal.

Any faite st#tement or omission in this d fedht, ;ncluding ettact1ments, may be subject to cffil and Crimmel sanct6cos. I certify under penafty of perjury that the infortri tion in th% documerft and attachments og true and correct.

'GN RE , AUT CRIZED REPRESENTATIVE l TITLE l0 ATE J /h. Sie e ' ~

Vice President, Nuclear Croup U - 3o - W la pance wetfi 10 CF R g 55.5, Communications, ther form 5ttalt be a.btnttted to the NRC as foHows:

8Y Mall ADDRESSED TO: Detector,Of&e of Nuc6eer Rasctor Reguistion BY DEllVE RY IN PE RSON U A Neeseer Regutatory Conimission One whete Fhnt North TO THE NRCOFFICE AT: 11656 Roded6e Ptke Wasnessen, DC 20564 Recueille, MD enRC FORM 47e f f Mi