Applicant Exhibit A-92,consisting of History of DG Pneumatic Controls Problems
ML20086U467
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 06/07/1995
From:
GEORGIA POWER CO.
To:
References
OLA-3-A-092, OLA-3-A-92, NUDOCS 9508040111
Download: ML20086U467 (10)


Text

.

Attc hment A % q O-NF '/25 - OQ1 -3 00CKETED i

USHRC ff( gy, y __yg f7/93 A -9Z 95 x la k9 S1 LJAda sys. p RISTORY OF DG PNEUMARIetrotffAf1

~

DOW{ggj[Cfi IT HAS BEEN STATED THAT V0GTLE HAS LO DG PROBLEMS.

~

NUREG-1410 LISTS 69 CALCON SENSOR FAILUR h

1 PRESENTATION WILL COVER 3 AREAS:

CALCON TEMPERATURE SWITCNES j

CALCON PRESSURE SWITCNES i

IN ADDITION, WE HAVE BEEN REQUESTED TO ADDRES RECENT PROBLEMS WITH COOPER STARTING AIR ADMISSION VALVES FOLLOWING A PRESENTATION OF THE HISTQ TECHNICAL FACTS RELATED TO THESc 3 SEP PROBLEMS, OUR CONCLUSION IS THAT:

i NO CLEAR PRECURSORS TO THE 3/20/9 ARE EVIDENT FROM A REVIEW OF THE' P SENSOR WORK HISTORY.

GPC DID DO THOROUGH TESTING'AND 3 GENERIC COMPONENT DEFICIENC SUPPLIED COMPONENTS.

GPC DID NOTIFY OTHER OWNERS OF AND SOLUTIONS.

J l

9509040111 950607

{DR ADOCK 05000424 PDR

j':.^-

g 4

1

+.

d e-

)%

t w

h s

D h

g'

\\

N n

a v

8 OoS I

e3tm s ts w e:s ss-a c. d s

o a -

6

& W g

g

$jl,

\\

h ME!A$ISIl

Ie CALCON TEMPERATURE SENSOR i

MODEL A3500-W3 L

TOP PLATE e

TOP PLATE GASKET C

0-RING DISK 5 HAFT POPPET DISK POPPET g

AIR INLET r POPPET SPRING BASE GASKET g

\\N, SPRING RETAINER l

VENT PORT i

'5EN50R TENSION SPRIN iROTATED)

BASE SENSOR DISK 5 EXPAND AS SPACER TUBE TEMPERATURE INCREASES. THEREBY PULLING THE POPPET DISK DOWN ONTO THE POPPET. AS THE POPPET IS PUSHED DOWNVARD. THE AIR ESCAPE 5 THROUGH THE VENT.

AS THE TEMPERATURE DECREASES, SENSOR DISK 5 THE SENSOR DISK 5 CONTRACT. THE SENSOR TENSION SPRING PUSHE5 6

UPWARD AGAINST THE SPRING RETAINER.6 VHICH PUSHE5 THE POPPET DISK v

UPWARD OFF THE POPPET. THE AIR SUPPLY AND POPPET SPRING PUSH THE POPPET BACK INTO THE POPPET HOLE.

i 4

SUIMARY OF DIESEL GENERATOR TEMPERATURE SENSOR PROBLEMS AT V0GTLE UNIT 1 UNIT 2 UNIT 1 1R1 UNIT 1 CYCLE 2 POST EVENT CONSTRUCTION CONSTRUCTION (9/88-10/88)

PRE-OUTAGE DUTAGE PRE-EVENT 3/20-3/25/90 (NSTRUMENT FUNCTIdM PROBLEM (8/85-12/86)

(1/88-12/88) 2 4

4 J. W. Temp.

Out-of-cal.

8 7

l' 6

J. W. Temp.

Defective 1

1 1

I L. O. Temp.

Out-of-cal.

l l

1 10 Brg. Temp.

Defective mummmmmmmmes Misc.

3 f

Vib. Snsrs.

Defective e

~~-

" - - - - - ^ - - - - - -

4 9

JACKET WATER SWITCH PROGRAM RESULTS INSUFFICIENT TEMPERATURE STABILIZATION PERIOD PRIOR TO CALIBRATION.

CONTAMINANTS ON THE TEMPERATURE SENSO CALIBRATION BATH HEATUP RATE.

THERM 0WELL SETSCREW TIGHTNESS.

SPACER-TUBE TIGHTNESS.

INTERNAL CONTAMINANTS.

O I

b JACKET WATER TEMPERATURE SWITCH PROBLEMS t

Roor CAUSE INTERNAL CONTAMINATION CAN CAUSE SWITCH TO CONTINUOUSLY VENT.

CALIBRATION OF THE SWITCHES WAS INADEQUATE.

J CORRECTIVE ACTION CALIBRATION PROCEDURE THAT CLEANS AND PROPERLY CONTROLS THE CALIBRATION REQUIREMENTS.

RELIABILITY OF THE BASIC SWITCH COMPONENT WAS ESTABLISHED.

l SWITCHES HAVE BEEN DEFEATED IN THE EMERGENCY START MODE.

CURRENTLY EVALUATING REPLACEMENT.

~

SIGNIFICANCE OF PROELEM INADEQUATE CALIBRATION PROCEDURES AND TECHNIQU l

RESULTED IN REDUCED RELIABILITY OF THE EMERGE DIESEL GENERATORS.

i CONCLUSION BEGINNING WITH PROBLEMS ENCOUNTERED DURING TH FIRST UNIT 1 REFUELING IN 1988, GPC MAS TAKEN A SERIES OF ACTIONS TO RESOLVE DG TEMPERATURE SWITCH MALFUNCTIONS.

i

i WTES:

l i

l 1. 'A' = Wem asa,tsassa 945 FIEES Mr&IR.

3.

E M BICR M ImprtuG paars W W SEN CORRIuG G 333-1 3

  • SacTITE 4 M 1/4379

- 4370 4340 4390 bh 4395 SSpeteNG IIS AS.4 84 7

' eve es, 430 seus 8 4381 as 1

A Y 4375 333 D1Armange 4383 1

A 4394 4370 MAD 1

A 4300 passages FEAR 4

345 Q.==- '

4 4378 4379e 1M7 C

l 4366 A

v 393 segIng A33ggg gaggy 4337 e,,.

WhtVE SECilOSE+4884 go,' see me

'eesse 4

se-essee 1

A i

1 A

373 I>trag f> a--

1 A

3841 TEWF SEAL fERFr """""4 1

A 1967 37t25G 1

A

  1. apr = ===m1 1

MS9 O-3330 1

A l

antt 1

A 4364 Alh30eTER stat assesLY f

ants

= w -u 6 1

A I

A 4M8 alhpugTER SC33r anal

~=T 1

A 1

4377 SPRE818 EDustsIG 1

A 4379 MIRetus StaETE 1

A amas

- --s 439e WM 1

A Wm8#3 perps?

rw g

A

439, gygEEG SERT 1

anta 1

A 4993 abgerlAM 4395 artfuG 34400 lPtESSURE SEli50R Sul ASSENILIES 7*"*if 1

~

SUMMARY

OF DIESEL GENERATOR l

PRESSURE SENSOR PROBLEMS AT V0GTLE UNIT 1 UNIT 2 UNIT 1 1R1 l UNIT 1 1RZ lPOSTEVENT

MSTRUMENT CONSTRUCTION CONSTRUCTION (9/88-10/88)

PRE-OUTAGE OUTAGE PRE-EVENT 3/20-3/25/90 UNCTION PROBLEM (8/85-12/86)

(1/88-12/88) 2 L. O. Pres.

Out-of-cal.

4 1

L. O. Pres.

Defective 1

T. O. Pres.

Out-of-cal.

1 1

1 T. O. Pres.

Defective I

M. P. (P-3)

Out-of-cal.

1 1

M. P. (P-3)

Defective i

1

~~

~-

-~ -.

i s,-..

r i

DIESEL GENERATOR CALCON PRESSURE SWITCHE j

10CFR PART 21 (MAY 1988)

" DEVICES THAT ARE ALREADY INSTALLED AND. OPER i

AFTER SEVERAL-HOURS BE W EEN TESTS HAVE DEM IMO DELAVAL RECO>t4 ENDS THAT ALL l

THEIR RELIABILITY.

DEVICES NOT INSTALLED, OR THAT ARE INSTALLED BUT HAVE

~

NOT OPERATED FOR SEVERAL HOURS BEWEEN TESTS, BE l

RETURNED TO.IMO DELAVAL FOR REMACHINING, INSPECTION AND TESTING."

10CFR PART 21 (JUNE 8.1990. AnorNouM 3)

-i 12, 1988 MAY HAVE BEEN 3

"OuR REC 0t#4ENDATION OF MAY CONFUSING AND IN LIGHT OF THIS FAILURE AFTER 9 YEA i

IT IS APPROPRIATE TO RESTATE OUR REC 0t#4END COOPER INDUSTRIES REC 0044 ENDS THAT ALL COOPER P/N F-573-156,.BE MODIFIED OR REPLACED

DEVICES, BY DEVICES IDENTIFIED AS CALCON'P/N B4400 t

l I

b PRESSURE SWITCH FAILURE ANALYSIS R 4

- Roor CAUSE MIS-INTERPRETATION OF PART 21 (MAY 19 CORRECTIVE ACTION

)

ALL CALCON PRESSURE SWITCHES HAVE BE SIGNIFICANCE OF PROBLEM STICKING PRESSURE SWITCHES COULD HAV IN REDUCED RELIABILITY OF THE EMERGE GENERATORS.

_ CONCLUSION AS A RESULT OF THE GPC Root CAUSE EV A PRESSURE SWITCH PROBLEM IN 1990, THE VENDO CLARIFIED AND REISSUED THE 10CFR21 NOT l

I