Text
y,=.-
1 g
e Ent:rgy Operation 2,Inc.
== ENTERGY eo eox a
.j Ki!!ona LA 70066 Tel 504 7396774 i
R. F. Burski Dvecw NUClodf Sideh VMertov13 W3F1-95-0124 l
A4.05 PR August 2, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Response to NRC Inspection Report 50-382/95-15 Gentlemen:
During the period of June 13-16, 1995, an NRC Augmented Inspection Team examined the facts surrounding a reactor trip and non-safety related switchgear fire that occurred at Waterford 3 on June 10, 1995.
NRC Inspection Report 50-382/95-15 requested that Waterford 3 provide information regarding the efforts to identify the root cause of the faulty fast bus transfer. Waterford 3 should be prepared to provide this I
information by December 15, 1995. This date was selected due to additional testing and troubleshooting on the bus transfer circuitry that must be performed during the Refuel 7 Outage.
The information obtained from this testing will be used in finalizing the root cause of the faulty fast bus transfer. The Waterford 3 Refuel 7 Outage is currently scheduled to start on September 22, 1995.
N' 9soso4ooss 9soeo2 g10 PDR ADOCK 050003B2 L
-Q PDR
-i
_i-Response to NRC Inspection Report 50-382/95-15 i
W3F1-95-0125 Page 2 August 2. 1995 Should you need additional information, please contact R.T. Kullmann at (504) 739-6494.
Very truly yours,
- 1) { f 0)~
R.F. Burski Director Nuclear Safety 1
RFB/RTK/tjs t-cc:
L.J. Callan, NRC Region IV 1
C.P. Patel, NRC-NRR R.B. NcGehee N.S..Reynolds i
NRC Resident Inspectors Office
)