ML20086T200
| ML20086T200 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/24/1984 |
| From: | Gerrets T LOUISIANA POWER & LIGHT CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 92, W3K84-0398, W3K84-398, NUDOCS 8403060196 | |
| Download: ML20086T200 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. *j A
Louisiama ma oe< moNoE s1eEe1 POWFR & L1GHT P o Box soo8
- NEW ORLEANS. LOutslANA 70174 * (5n4) 386 2345
$u$EYs February 24, I?"'
W3K8I4-G 398 Q-3-A35.07.92 gg]gg%
Mr. John T. Collins E
legional Administrator, Region IV 11 1 U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 I
- 2W hO d
REFERENCE:
LP&L letter W3K84-0241 dated February 3, 1984
Dear Mr. Collins:
SUBJECT:
Waterford SES Unit No. 3 Docket No. 50-382 l
Significant Construction Deficiency No. 92
(
"High Prcssure Safety Injection System Performance" Fourth Interim Report The above referenced letter indicated submittal of a Final Report to the USNRC on February 24, 1984.
At the present time, review of supporting documentation is scheduled to be completed on March 9, 1984. The Final Report will be submitted to the USNRC on March 16, 1984.
Very truly yours, Y
d T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:VBR cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8403060g6840224 g 382 PDR ADO PDR e
,,j,, LQm/ yt!
s
)
[~
"a h
l' Mr. John T. Collino
.. February 24, 1984 W3K84- 0398 O
Page 2
' cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555 Mr.'E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. W. M.-Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center Inatitute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
_ _ _ _ _. _. - _ _ _ _ - _ _