ML20086S946

From kanterella
Jump to navigation Jump to search
Forwards Rev 22 to Emergency Plan,Incorporating Editorial Changes.Section H Incorporates Replacement of ERF Computer by Integrated Plant Computer for Unit
ML20086S946
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/28/1995
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086S951 List:
References
LCV-0652, LCV-652, NUDOCS 9508020186
Download: ML20086S946 (3)


Text

'1 l

. Georgia Power Company

' 40 inverness Ccnter Parkway Pom ONce Box 1295 Birmingnam. A!abama 35201 Te6ephone 205 877 7122

.[ )

s

.Q Georgia Power-C. K. McCoy Vce President, Nuclear Vogthe Protect the southern electnc system LCV-0652 Docket Nos. 50-424 50-425 l

l l:

U. S. Nuclear Regulatory Commission

(.

ATTN: Document Control Desk l

Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT ENERGENCY PLAN REVISION 22

- )

Gentlemen:

l In accordance with 10 CFR 50.54(q) and 10 CFR 50.4, Georgia Power Company hereby submits Revision 22 to the Vogtle Electric Generating Plant (VEGP) Units 1 and 2 Emergency Plan (the Plan).

Revision 22 incorporates editorial changes. Section H incorporates the replacement of the ERF computer by the Integrated Plant Computer (IPC) for VEGP Unit 2. Enclosure 1 provides a description and justification of the individual changes. Enclosure 2 provides insertion instructions. The revised plan pages are in enclosure 3. The changes made to the Plan do not decrease the effectiveness of the Plan.

In accordance with 10 CFR 50.4, two copies of revision 22 are being sent to the NRC Region II office and one copy is being sent to the NRC Senior Resident Inspector at q

Vogtle Electric Generating Plant.

Please contact this office ifyou have any questions regarding this submittal or contact Mr. J. N. Roberts, Emergency Preparedness Coordinator at (706) 826-3416.

Sincerely, C. K. McCoy I

CKM/PAH/gmb cc: (See next page)

L i!A*A85!e!s8?sb Aoff PDR ElI

Georgia Power d 1

U. S. Nuclear Regulatory Commission Page 2 1

Enclosures:

1. Description and Justification ofChanges i
2. InsertionInstructions l
3. Revised Plan Pages l

cc:

Georcia Power _Comoany l

Mr. J. B. Beasley, Jr.

l Mr. M. Sheibani NORMS U. S. Nuclear Reculatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. L. L. Wheeler, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle LCV-0652 O

700775

O DESCRIPTION AND JUSTIFICATION OF CHANGES O

O

_