VIHOINIA Ex.ecTarc Ano Powna COMPANY yig ' (*
I Rrenw own.Va norx A 2 0 c 61
'"
- v. COP %.
December 27, 1976 Mr. Norman C. Moseley, Director Serial No.
301A/102176 Office of Inspection and Enforcement P0&M/ALH:dgt U. S. Nuclear Regulatory Comission Region II - Suite 818 Docket Nos. 50-280 230 Peachtree Street, Northwest 50-281 Atlanta, Georgia 30303 License Nos. DPR-32 DPR-37
Dear Mr. Moseley:
This is to provide information in addition to that submitted in our letter serial 301/102176 dated December 6, 1976. Due to an administrative oversight, our coments on a deviation from the ESAR were not provided.
This information is provided in the attachment to this letter.
Very truly yours, C. M. Stallings g Vice President-Power N pply and Preduction Operations Enclosure d
2
,Y
@ Me?desgg pff v'
o o
RESPONSE TO DEVIATION REPORTED IN IE REPORT NOS. 50-280/76-14 AND 50-281/76-14 Virginia Electric and Power Comoanv Surry Power Station
_ Unit Nos. I anc 2 NRC COMMENT
" Contrary to FSAR Section 10.3.8.2, the steam generator blowdown tank condensate, when contaminated, doesn't go to the vent and drain system and the flashed vapor does not exhaust through the process vent."
RESPONS2 The above deviation is correct as stated in the inspection report.
A design change to modify the steam generator blowdown system is currently being completed on Surry Unit No. I and is scheduled for e
implementation on Surry Unit No. 2 in the near future. This design change
.d.
involves the installation of a heat exchanger which will subcool the blowdown liquid and thus eliminate the release of flashed vapors. The subcooled liquid will then be released from the station through existing blowdown system piping.
M_..,
f.xy.f.-Mi
.y' j 7 ;[."y' Our future plans include a system that will process all blowdown liquid prior to its release from the site.. This process is to include both 77. ',
chemical and radiological purification. This project is in its
.[.,{i ;.
preliminary stages and therefore schedule and detailed description are
- #.3 '.,f not available.
. o 6,. c !.~
g c 3. $.
4
- k. k.
r,_ [?
e.
,4 jWs Q; #..o
. J Q,. ~
..?*.,.p,'.
- ',. '.f
^
[; ?. 'j i.' j c
Y.
i 4
.:.,h, gpg >
g g,", W
,: ',< y.,i.
'.lf
. ~.
& N &.:
p,. ;.:
,Q,'f 3. *, ",. '
i; ;,.q,' 9