ML20086S697
| ML20086S697 | |
| Person / Time | |
|---|---|
| Site: | Byron, Braidwood |
| Issue date: | 07/28/1995 |
| From: | Saccomando D COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086S702 | List: |
| References | |
| NUDOCS 9508020089 | |
| Download: ML20086S697 (1) | |
Text
O>mmonw cahh lilN>n Comp.iny i
l-841 Opin I' lace Dow ncrs Gn n c. II. GIS I 5 l
l July 28,1995 Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Subject:
Additional Information Pertaining to the Application for Amendment to Facility Operating Licenses:
Byron Nuclear Power Station, Units 1 and 2 NPF-37/66: NRC Docket Nos. 50-454/455 Braidwood Nuclear Power Station, Units 1 and 2 NPF-72/77: NRC Docket Nos. 50-456/457
Reference:
D. Saccomando letter to the Nuclear Regulatory Commission (NRC) dated July 21,1995, transmitting "IRB Leak Test Report" The Reference letter transmitted the Commonwealth Edison's "IRB Leak Rate Test Report." This report was transmitted with page missing (Table 2-10 Summary of Test Dimensional Measurement Results), and is included for completeness.
Sincerely, JN h, 2"
Denise M. Sacebr$ando Nuclear Licensing Administrator cc:
D. Lynch, Senior Project Manager - NRR R. Assa, Braidwood Project Manager - NRR G. Dick, Byron Project Manager - NRR S. Ray, Senior Resident Inspector - Braidwood H. Peterson, Senior Resident Inspector - Byron 90 L:nta:brwd.rwise I Q
n.?n n, o
!sR" E888 as838 6 P
PDR A t'nicom Compan>
-