ML20086S656

From kanterella
Jump to navigation Jump to search
Forwards Rev 13 of USAR for Cns.Rev Reflects Changes Made Since Last Submittal of USAR & Current for Work Completed as of 950122.Rev 11 of CNS QA Program Transmitted to NRC on 950410 & Ref in App D to USAR
ML20086S656
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/20/1995
From: Horn G
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086S660 List:
References
NLS950142, NUDOCS 9508020073
Download: ML20086S656 (5)


Text

[k p '

~

p_.

I

(:

+

j f

L{

GENERAL OFFICE P.O. BOX 499. COLUMBUS. NEBRASKA 68602-0499 TELEPHONE (402) s64-8561 Nebraska Public Power District rAx <4m s6>sssi GUY R. HORN '

Vice-Prenident, Nuclear (402) 563-5518 NLS950142 July 20,1995 h

U. S. Nuclear Regulatory Commission Attention: Document Control Desk 1

Washington, DC 20555 Gentlemen:

Subject:

10CFR50.71(e) Revision for USAR Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 Pursuant to 10CFR50.4, Nebraska Public Power District hereby submits one (1) original and ten (10) copies of the thirteenth (13th) revision (dated July 22,1995 effective date) of the Updated Safety Analysis Report (USAR) for Cooper Nuclear Station. This revision reflects changes made since the last submittal of the USAR and is current for completed work as of January 22,1995.

Revision 11 of the Cooper Nuclear Station's Quality Assurance Program was transmitted to you on April 10, 1995. That program document is referenced in Appendix D to the USAR and was submitted in accordance with 10CFR50.54(a).

Also enclosed is a List of Effective Pages for this revision of the UsAR in accordance with 10CFR50.71(e)(i).

Sin rely,

/p~~~---

G Iorn Vice-resident, Nuclear Cooper Nuclear Station GRII/tja:umunnu Enclosure cc:

Regional Administrator USNRC - Reg;on IV Arlington, TX NRC Resident Inspector Cooper Nuclear Station 63 NPG Distribution w/o encl.

010035 0

J[0 9508020073 950720 PDR ADOCK 05000298 K

PDR M h m mi;&i;t%H7%T6 M M E E M ani@-

==S c

nn=

=

.=

==

=

u.

=

n..

_w.

e NLS950142 July 20,1995 Page 2 of 2 STATE OF NEBRASKA )

)ss PLATTE COUNTY

)

G. R. IIorn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this information on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his ipowledge an belief.

v/w '

w G. R. IIorn Subscribed in my presence and sworn to before me this M" day of slu/y

,1995.

fiI e

suunumsnames It d I

annL80FF NOTARY PUBI]C "IkW EM

. 07/20/95 09:30 Q402 825 5827 CNS-LHENSING_ *** NUCLE.ut SUPPORT

@ 003 e

LIST OF NRC COMMITMENTS l ATTACHMENT 3 l t

Correspondence No:

NLS950142 The following table identifies those actions committed to by the District in this document.

Any other actions discussed in the submittal represent intended or i

planned actions by the District.

infor1 nation and are not regulatory consniements.They are described to the NRC for the NRC i

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

4 COMMITTED DATE COMMITMENT OR OUTAGE

[

"NONE" r

E l

l i

I i

MF --

PROCEDURE NUMBER 0.42 REVISION NUMBER 0 PAGE 10 CF 16

7 GENERAL (VFCE M i,,,,,,,

P.O. BOX 499. COLUMBUS, NEBRASKA 68602-0490 Nebraska Public Power District "luT/EE**

NLS950142 L

July 20,1995 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

10CFR50.71(c) Revision for USAR Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 Pursuant to 10CFR50.4, Nebraska Public Power District hereby submits one (1) original and ten (10) copies of the thirteenth (13th) revision (dated July 22,1995 effective date) of the Updated Safety Analysis Report (USAR) for Cooper Nuclear Station. This revision reflects changes made since the last submittal of the USAR and is current for completed work as of January 22,1995.

Revision 11 of the Cooper Nuclear Station's Quality Assurance Program was transmitted to you on April 10, 1995. That program document is referenced in Appendix D to the USAR and was submitted in accordance with 10CFR50.54(a).

Also enclosed is a List of Effective Pages for this revision of the USAR in accordance with 10CFR50.71(e)(1).

Sinc'ely, orn resident, Nuclear Cooper Nuclear Str. tion i

GRH/tja: nunaw l

Enclosure cc:

Regional Administrator USNRC - Region IV l

Arlington, TX l

NRC Resident Inspector Cooper Nuclear Station NPG Distribution w/o encl.

M M

M E

NLS950142 July 20,1995 Page 2 of 2 STATE OF NEBRASKA )

)ss PLATTE COUNTY

)

G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska: that he is duly authorized to submit this information on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his lpowledge and belief.

_ sw L-G. R. Horn Subscribed in my presence and sworn to before me this JU" day of du/y

,1995.

k /7

['

ann NOTARY PUB 13C NON 4