ML20086S649

From kanterella
Jump to navigation Jump to search
Amend 118 to License NPF-49,revising DG Fuel Oil Testing Performed on New Fuel Prior to Addition of New Fuel to Storage Tank
ML20086S649
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/26/1995
From: Mckee P
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20086S654 List:
References
NUDOCS 9508020072
Download: ML20086S649 (4)


Text

_ _ _ _ _ _ _ _ _

p*%,

y UNITED STATES g

j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20ea6 0001

~

'S9*****

NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.

DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 118 License No. NPF-49 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated April 28, 1995 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable I

requirements have been satisfied.

9508020072 950726 PDR ADOCK 050004 3 p

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 118, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto i

are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.

i FOR THE NUCLEAR REGULATORY COMMISSION g-Phillip F. McKee, Director Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 26,1995 G

e

ATTACHMENT TO LICENSE AMENDMENT NO.118 FACILITY OPERATING LICENSE NO. NPF-49 DOCKET NO. 50-423 Replace the following page of the Appendix A, Technical Specifications, with the attached page. The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

Remove Insert 3/4 8-5 3/4 8-5 i

i l

i e

-_~

ELECTRICAL POWER SYSTDis 1

SURVEILLANCE'REQUIRENENTS (Continued)

,l 1

~

b).

A kinematic viscosity at40*C of greater than or equal.to l

1.g centistokes, butless' than or equal to 4.1 contistokes (alternatively, S:ybolt viscosity, SUS at 100*F of greater i

gravitywasnotdeterminedbycomparisonwiththesupplier's;l j

than or equal to 32.6, but less-than or equal to 40.1), if i

certification; j

c)

- A flash point equal to or greater than 125'F; and j

d)

Water and sediment less-than 0.05 percent by volume when j

tested in accordance with ASTM-D1796-83.

l 2)

By verifying within 30 days of obtaining the sample that the other properties specified in Table 1 of ASTM-D975-81 are met j

when tested in accordance with ASTM-D975-81 except that:- -.

i e

(1) the cetane index shall be determined in accordance.with a

ASTM-D976 (this test is an appropriate approximation for cetane i

number as stated in ASTM-D975-81 (Note E]), and (2) the analysis for sulfur may be performed in accordance with ASTM-D1552-79, ASTM-D2622-82 or ASTM-D4294-83.

I f.

At least once every 31 days by obtaining a sample of fuel oil in accordance with ASTM-D2276-78, and verifying that total particulate.

contamination is less than 10 mg/ liter when checked in accordance hith ASTM-D2276-78, Method A; g.

At least once per:18 months, during shutdown, by:

1)

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service; 2)

Verifying the generator capability to reject a load of greater-than or equal to 595 kW while maintaining voltage at 4160 i 420 volts'and frequency'at 60 1 3 Hz; 3)

Verifying the generator capability to reject a load of 4986'kW without tripping. The generator voltage shall not exceed 5000 volts during and 4784 volts following the load rejection; 4)

Simulating a loss-of-offsite power by itself, and:

a)

Verifying deenergization of the emergency. busses and load shedding from the emergency busses,'and 1

b)

Verifying the diesel starts from standby conditions on the j

auto-start signal, energizes the emergency busses. with permanently connected loads within 11 seconds, energizes the auto-connected shutdown loads through the load sequencer'and operates for greater than or equal to 5 minutes while its-generator is loaded with the shutdown loads. After energization, the steady-state voltage and frequency of the

~

emergency busses shall be maintained at 4160 1 420 volts and 60 1 0.8 Hz during this test.

NILLSTONE - UNIT 3 3/4 8-5 Amendment No. (, 15, M, 77. Jpp, i

esu lip,lif,118

-