ML20086R689

From kanterella
Jump to navigation Jump to search
Second Interim Significant Const Deficiency Rept 93 Re Charging & Letdown Containment Isolation Valve Defect. Initially Reported on 831202.Corrective Action Complete. Further Testing Required.Next Rept Expected by 840701
ML20086R689
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/20/1984
From: Gerrets T
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
93, W3K84-0351, W3K84-351, NUDOCS 8403010069
Download: ML20086R689 (2)


Text

.4 #*

I UISIANA 142 OELARONDE STREET P O W E R & LiG H Tj P O box 0000

  • NEW ORLEANS. LOUIStANA 70174 + (504) 366 2345 UituTIES SYSTEM February 20, 1984 W3K84-0351 Q-3-A35.07.93 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

REFERENCE:

LP&L Letter W3K83-1880 dated December 2, 1983

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Significant Construction Deficiency No. 93

" Charging and Letdown Containment Isolation Valve Deficiency" Second Interim Report The above referenced letter indicated submittal of an Update or Final Report to the USNRC on February 17, 1984.

At the preso t time, corrective action is complete, however, further testing is required during Post Core Hot Functional Testing (HFT) and after Post Core HFT Cooldown.

An Update / Final Report will be submitted to the USNRC on July 1, 1984.

Very truly yours,

//

d. M ~

g T. F. Gerrets Corporate Quality Assurance Manager TFG:CNH:SSTG cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8403010069 840220 PDR ADOCK 05000382 y g. I I

i S PDR J L

FT .'~ l

, . n=

Mr. John T.' Collins February 20, 1984 W3K84-0~51 Page 2=

cc: Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C. 20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130 Records Center

-Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 s

4 J} _