ML20086R049
| ML20086R049 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 12/20/1991 |
| From: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| BYV-91-124, NUDOCS 9112310129 | |
| Download: ML20086R049 (1) | |
Text
G^
~
~
VenMONT YANKEE
'NUCLEAll POW' 'It COltl'OltATION
^
B1/Y 91-124 s-
. Ah s rerry noad, Drattleboro, vT 053017092
[
I LNGINLh NG Of MCE
~4-A u.m.mim
.-)
wm.,.w o,
,w,,
December 20, 1991 U.S. Nudear Regulatory Commission Washington, DC 20555 Attention:
Document Coritrol Desk
References:
a)
License No. DPR 28 (Docket No. 50 271) b)
Letter. VYNPC to USNRC (BVY 9196), dated 10/18/91
Dear Sir:
Subject:
LOR Program Corrective Actions This letter is written to clarify-one of our statoments in Reference b),
whl::h addressed the dulles and responsibilities of the Supervisory Control Room Operator.
The second corrective action statement to Finding #5 is more accurately stated._as follows:
"2.
Operations managvurit has redefined the dulles and responsibilltles of tne Supervisory The SCRO is now moreOperator Control Room (SCRO) d Shift Engineer (SE).
,^
involves
. Emergency Operating Procedure implementation than poi mance of Control Man:pulations and the SE la no longer res,Jired to perform the dulles of Shift Communicator.
Instructional = material, and instructor Guide and - training of personnel esignated as the onshift communicators has been compisted The purpose of this clarlfication is to indicate that it is not our Intent to prevent the SCRO from making contfoi manipulations.
I apologize for any inconvenience this may have caused.
In the event I can be of any further assistance, please do not hositato to call.
Very truly yours, Vermon Yankee _ Nuclear Power Corporation wfW/&
,y Senior Vice Presidenr[,j Warren P. Murphy Operations cc:
USNRC Regional Administrator, Region i USNRC Resident inspector, VYNPS USNRC Project Manager, VYNPS
,p,
- w.,
V_
'4 k
71 PIJR