ML20086Q969

From kanterella
Jump to navigation Jump to search
Supplementary Interim Deficiency Rept Re Damage to Vessel Top Fuel Guide.Results of Evaluation Being Evaluated & Corrective Action Being Determined.Rept Wil Be Submitted in Feb 1973
ML20086Q969
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/22/1972
From: Boyer V
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Kruesi F
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20086Q971 List:
References
NUDOCS 8402280625
Download: ML20086Q969 (1)


Text

- - - -. --

O O PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET PHILADELPHIA. PA.19101 (215)841 45oo VIC E. PRE SIDENT December 22, 1972 Mr. F. E. Krussi, Director Directorate of Regulatory Operations United States Atomic Energy Commission Washington, D.C. 20545

Subject:

Supplementary Interim Report Concerning Damage to Unit 3 Reactor Pressure Vessel Top Fuel Guide Peach Bottom Atomic Power Station - Unit No. 3 AEC Construction Permit No. CPPR-38 File: QUAL 2-10-2

Reference:

(a) Interim Report dated July 7, 1972 (b) Supplementary Interim Report dated August 16, 1972 (c) F. E. Kruasi letter to V. S. Boyer date~d August 31. 1972

Dear Mr. Kruasi:

This Supplementary Interim Report is to inform you of the current status of the refer nced Top Fuel Guide.

The unit has been eyamined at the manufacturer's plant. The results of the evamination are currently being evaluated and corrective action is being determined. Consequently, the information is not available for the December,1972 report mentioned in the Supplementary Interim Report, reference (b). It is now expected that the report will be submitted in February, 1973 Sincerely, m

Copy to: J. P. O'Reilly, USAEC S' O - [J "{ <{

c .

7' m.:.

! 0625 721222 p%22yOCK05000277 S

PDR 2 1767

~

L