ML20086Q969
| ML20086Q969 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 12/22/1972 |
| From: | Boyer V PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Kruesi F US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20086Q971 | List: |
| References | |
| NUDOCS 8402280625 | |
| Download: ML20086Q969 (1) | |
Text
- - - -
O O
PHILADELPHIA ELECTRIC COMPANY 23O1 MARKET STREET PHILADELPHIA. PA.19101 (215)841 45oo VIC E. PRE SIDENT December 22, 1972 Mr. F. E. Krussi, Director Directorate of Regulatory Operations United States Atomic Energy Commission Washington, D.C.
20545
Subject:
Supplementary Interim Report Concerning Damage to Unit 3 Reactor Pressure Vessel Top Fuel Guide Peach Bottom Atomic Power Station - Unit No. 3 AEC Construction Permit No. CPPR-38 File:
QUAL 2-10-2
Reference:
(a) Interim Report dated July 7, 1972 (b) Supplementary Interim Report dated August 16, 1972 (c)
F. E. Kruasi letter to V. S. Boyer date~d August 31. 1972
Dear Mr. Kruasi:
This Supplementary Interim Report is to inform you of the current status of the refer nced Top Fuel Guide.
The unit has been eyamined at the manufacturer's plant. The results of the evamination are currently being evaluated and corrective action is being determined. Consequently, the information is not available for the December,1972 report mentioned in the Supplementary Interim Report, reference (b). It is now expected that the report will be submitted in February, 1973 Sincerely, m
Copy to:
J. P. O'Reilly, USAEC S' O - [J "{ <{
c 7' m.:.
p%22yOCK05000277 0625 721222 S
~
2 1767 L