GPU Nuclear Corporation Manyw w-200 interpace earkway EEM a
Parsippany. New Jersey 07054 201 263 6500 TELEX 136-482 Writers Direct Dial Number:
February 13, 1984 RFW-0041 Office of Nuclear Reactor Regulations Attn: John F. Stolz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Three tiile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Doc (et No. 50-289 Independent Fire Rating Test for Rockbestos Fire Proof Cable Ref: GPUN Letter 5211-83-324, Dated November 30, 1983 GPUN and the Rockbestos Company are cooperating in the development of a fireproof cable designed to be used in lieu of one (1) hour fire barriers in meeting the requirements of 10CFR50, Appendix R (Fire Protection). You are invited to witness the ASTM E-119 oven exposure and water spray test to be performed with fireproof cables in both cable tray and conduit.
The test is tentatively scheduled for 10Aff, Tuesday, February 21, 1984 at Underwriter's Laboratories Inc., 333 Pfingsten Road, Northbrook, Illinois.
(Directions from O' Hare Airport to UL are attached.)
The proposed test program is described in detail in the above referenced letter. The scope of the test includes the following:
a)
A 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ASTM E-119 oven exposure of test cables wired for circuit integrity monitoring.
b)
.An inrush current loading of the test cabins tc be performed during the last 15 minutes of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> oven e y n re.
8402210135 840213 h
DR ADOCK 05000289 PDR QO
'I
}
GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation
e 2-LJ. F. Stolz RFW-0041 c)
A hose stream exposure of the test cables, while energized, will be performed immediately after removal of the test setup from the oven i
at.the end of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> oven exposure, d)
Following~the' hose stream exposure, the test cables will be'ener-
- gized and monitored for circuit integrity for approximately 79 hours9.143519e-4 days <br />0.0219 hours <br />1.306217e-4 weeks <br />3.00595e-5 months <br />. Periodically the test cables will be subjected to 4 addi-tional inrush current sequences.
If you wtai to attend, please contact Mr. M. Iqbal (201-299-2257). We will keep youfinformed of:any schedule changes.
Sincerely, I
kr\\w R. F. W 11 son Vice President -
Technical Functions
/mt att.
- cc:
-R. J. Conte T E.:Murley J. Van Vlist C. Ramsey e
i 5
4 i
r-ir---%
g y
ye-y
+ -
- gg-g9-wy g--y, - -
g-+e-7
-+m--+-w-we 9 ya
--yn-
--+-
,p.
g-ewww--
gy-ry-wwry-wgwwgw-s*'w-r t4vDwa-Mv-M--
avu-ve--
w Underwriter's Laboratory Inc.
333 Pfingsten Road Northbrook, Illinois (Travel Time 30 minutes) 1.
Leaving O' Hare get on 294 North towards Milwaukee.
2.
Af ter 1 or 2 tolls get off on Willow Road.
3.
Proceed east on Willow Road to the second traffic light (Pfingsten Road).
4.
Turn left onto Pfingsten Road and proceed north to Dundee Road.
5.
Cross Dundee Road and continue approximately 1/2 mile on Pfingsten Road.
The Underwriter's test facility is on the right hand side.
6.
Proceed to the area in the rear of the Underwriter's test facility near the smoke stack.