Rev 4 to McGuire Unit 2 Cycle 10 ColrML20086N020 |
Person / Time |
---|
Site: |
Mcguire |
---|
Issue date: |
07/20/1995 |
---|
From: |
Gibby S DUKE POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20086N015 |
List: |
---|
References |
---|
MCEI-0400-47, MCEI-0400-47-R04, MCEI-400-47, MCEI-400-47-R4, NUDOCS 9507250096 |
Download: ML20086N020 (4) |
|
|
---|
Category:FUEL CYCLE RELOAD REPORTS
MONTHYEARML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20249C7031998-05-27027 May 1998 Rev 16 to MCEI-0400-46, McGuire Unit 1 Cycle 13 Colr ML20217R2711998-03-12012 March 1998 Rev 15 to McGuire Unit 1 Cycle 12 Colr ML20217L7471997-07-0808 July 1997 Rev 14 to McGuire Unit 1 Cycle 12 COLR for July 1997 ML20137M9581997-02-13013 February 1997 Cycle 12 COLR, Feb 1997 ML20113C4881996-06-24024 June 1996 Rev 11 to McGuire Unit 1 Cycle 11 Colr ML20101F3821996-03-12012 March 1996 Cycle 11 Colr ML20095J3791995-12-31031 December 1995 Rev 9 to McGuire Unit 1 Cycle 11,Core Operating Limits Rept, for Dec 1995 ML20094Q5771995-11-28028 November 1995 Cycle 10 Colr ML20086B9071995-06-26026 June 1995 Rev 3 to McGuire Unit 1 Cycle 10,Core Operating Limits Rept, June 1995 ML20076K9761994-10-25025 October 1994 Rev 2 to MCEI-0400-46, McGuire Unit 1 Cycle 10 Core Operating Limits Rept, Oct 1994 ML20078B4781994-10-18018 October 1994 Rev 5 to MCEI-0400-46, McGuire Unit 1 Cycle 10 Colr ML20073C3431994-09-14014 September 1994 Rev 4 to MCEI-0400-46, McGuire Unit 1 Cycle 10 Colr ML20063L6731994-02-24024 February 1994 Rev 2 to MCEI-0400-46, McGuire Unit 1 Cycle 9 Core Operating Limits Rept ML20046A0941993-07-13013 July 1993 Cycle 9 Reload Rept. ML20044H3391993-05-28028 May 1993 Rev 1 to MCEI-0400-46, McGuire Unit 1,Cycle 9 Colr. ML20044G7381993-05-24024 May 1993 Cycle 9 Colr. ML20125D2451992-12-31031 December 1992 Rev 3 to McGuire Unit 1 Cycle 8 Core Operating Limits Rept ML20106B6991992-09-25025 September 1992 Rev 2 to McGuire Unit 1,Cycle 8,COLR ML20141M2961992-07-31031 July 1992 Rev 1 to MCEI-0400-05, McGuire Unit 1,Cycle 8 Core Operating Limits Rept ML20094K7471992-03-11011 March 1992 Rev 1 to McGuire Nuclear Station Unit 1 Cycle 8 Startup Rept ML20092J5551991-11-30030 November 1991 Cycle 8 Core Operating Limits Rept ML20086H7231991-11-27027 November 1991 End-of-Cycle 7 Refueling Outage Steam Generator Rept ML20086A3561991-11-0707 November 1991 Rev to McGuire Unit 1,Cycle 8 Reload Rept ML20077H0651991-06-26026 June 1991 Cycle 8 Reload Rept ML20065M9521990-11-30030 November 1990 Rev 0 to Core Operating Limits Rept for Cycle 7 ML20237B1061987-12-11011 December 1987 Peaking Factor Limit Rept for Mcguire Unit 1 Cycle 5:RAOC & Base Load Operation ML20204H6551986-07-31031 July 1986 Rev 1 to Reload Safety Evaluation,Mcguire Nuclear Station, Unit 1 Cycle 4 ML20113H6371984-12-31031 December 1984 Reload Safety Evaluation,Mcguire Nuclear Station Unit 1 Cycle 3 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
!
., t MCEI-0400-47 4 Page 1 of19 Revision 4 McGuire Unit 2 Cycle 10 Core Operating Limits Report July 1995 l (Revision 1)
Duke Power Company ,
Date Prepared By:
aiwtT.bd/m c 1/2o/96 o
Checked By: 3 J /" M -7bo/ef -
d/uu%f. $
Checked By: '//.20/95 0 V Approved By: /[7/M ~7/2.0/7 QA Condition 1 !
l NOTE The contents of this document have been reviewed to verify that no material herein either !
directly or indirectly changes or affects the results and conclusions presented in the 10CFR50.59 M2C10 Reload Safety Evaluation (calculation file: MCC-1552.08-00-0250).
l 9507250096 950720 PDR ADOCK 05000370 P PDR
MCEl-040047 y 't . '
Page 2 of 19 Revision 4 McGuire 2 Cycle la Core Operating Limits Report REVISION LOG Revision Effective Date Effective Pages COLR OriginalIssue August 25,1993 N/A M2C09 .
Revision 1 June 20,1994 N/A M2C09, Rev.1 Revision 2 October 18,1994 N/A M2C09, Rev. 2 Revision 3 December 9,1994 Pages 1 - 19 M2C10 Revision 4 July 13,1995 Pages 1-3,11 M2C10, Rev.1 ;
i
MCEl-0400 47 Page 3 of 19 Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report INSERTION SilEET FOR REVISION 4 l Remove pages Insert Rev. 4 pages MCEl-0400-47,it i. 3 pages 1-3,11 MCEI-0400-47, rev. 4 pages 1-3,11
e q 1
MCEI-040047
- - Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report (FuKy%3tUrawn ,
min 22L mat.231) 240
/ (29.6 %,231) ,- (80%.231) p 220
~~; " ' ' ~~ ~
200 '
' Bank B 180 ,
' ,' (100 %,161) :
(0%,163) , ,
g ~
140 s ,
Inserte.n Position 120 Bank C
'.r' (Steps '
Withdrawn)100 ,- j r 80 , , Bank D s ,
3- ,r 40 - (0%,47) ! ,
20 '
' l (30%,0) l 0 l 0 10 20 30 40 50 60 70 80 90 100 Fudy Instreed) Relative Power (Percent)
Figure 2 Control Rod Bank Insertion Limits Versus Percent Rated Thermal Power ,
l NOTE: Compliance with Technical Specification 3.1.1.3 may require rod withdrawal limits.
Refer to OP/2/A/6100/22 Unit 2 Data Book for details. If reactor powcr is turbine limited, a penalty of 2.3 steps for each percent power below 100% to which the ;
reactor is limited will be required. Refer to OP/2/A/6100/22 Unit 2 Data Book for .j details. I i
l i