ML20086N020

From kanterella
Jump to navigation Jump to search
Rev 4 to McGuire Unit 2 Cycle 10 Colr
ML20086N020
Person / Time
Site: Mcguire
Issue date: 07/20/1995
From: Gibby S
DUKE POWER CO.
To:
Shared Package
ML20086N015 List:
References
MCEI-0400-47, MCEI-0400-47-R04, MCEI-400-47, MCEI-400-47-R4, NUDOCS 9507250096
Download: ML20086N020 (4)


Text

!

t MCEI-0400-47 Page 1 of19 4

Revision 4 McGuire Unit 2 Cycle 10 Core Operating Limits Report July 1995 l

(Revision 1)

Duke Power Company Date Prepared By:

aiwtT.bd/m 1/2o/96 c

o Checked By:

3 J /" M

-7bo/ef Checked By:

d/uu%f. $

'//.20/95 0

V Approved By: /[7/M

~7/2.0/7 QA Condition 1 NOTE The contents of this document have been reviewed to verify that no material herein either directly or indirectly changes or affects the results and conclusions presented in the 10CFR50.59 M2C10 Reload Safety Evaluation (calculation file: MCC-1552.08-00-0250).

9507250096 950720 PDR ADOCK 05000370 P

PDR

MCEl-040047

't.

Page 2 of 19 y

Revision 4 McGuire 2 Cycle la Core Operating Limits Report REVISION LOG Revision Effective Date Effective Pages COLR OriginalIssue August 25,1993 N/A M2C09 Revision 1 June 20,1994 N/A M2C09, Rev.1 Revision 2 October 18,1994 N/A M2C09, Rev. 2 Revision 3 December 9,1994 Pages 1 - 19 M2C10 Revision 4 July 13,1995 Pages 1-3,11 M2C10, Rev.1 i

MCEl-0400 47 Page 3 of 19 Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report INSERTION SilEET FOR REVISION 4 l

Remove pages Insert Rev. 4 pages MCEl-0400-47,it i. 3 pages 1-3,11 MCEI-0400-47, rev. 4 pages 1-3,11

e q

1 MCEI-040047

  • o,'

Page 11 of 19 Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report (FuKy%3tUrawn min 22L mat.231) 240

/

(29.6 %,231)

(80%.231) p 220

~~

~~

~~

~~

~

~~;

200 Bank B 180 (100 %,161) :

(0%,163) g

~

140 s

Inserte.n

'.r' Bank C Position 120 (Steps Withdrawn)100 r

j 80 Bank D s

3-

,r 40 -

(0%,47) !

20 l (30%,0) l 0

l 0

10 20 30 40 50 60 70 80 90 100 Fudy Instreed)

Relative Power (Percent)

Figure 2 Control Rod Bank Insertion Limits Versus Percent Rated Thermal Power NOTE: Compliance with Technical Specification 3.1.1.3 may require rod withdrawal limits.

Refer to OP/2/A/6100/22 Unit 2 Data Book for details. If reactor powcr is turbine limited, a penalty of 2.3 steps for each percent power below 100% to which the reactor is limited will be required. Refer to OP/2/A/6100/22 Unit 2 Data Book for

.j details.

i l

i