ML20086N020

From kanterella
Jump to navigation Jump to search
Rev 4 to McGuire Unit 2 Cycle 10 Colr
ML20086N020
Person / Time
Site: Mcguire
Issue date: 07/20/1995
From: Gibby S
DUKE POWER CO.
To:
Shared Package
ML20086N015 List:
References
MCEI-0400-47, MCEI-0400-47-R04, MCEI-400-47, MCEI-400-47-R4, NUDOCS 9507250096
Download: ML20086N020 (4)


Text

!

., t MCEI-0400-47 4 Page 1 of19 Revision 4 McGuire Unit 2 Cycle 10 Core Operating Limits Report July 1995 l (Revision 1)

Duke Power Company ,

Date Prepared By:

aiwtT.bd/m c 1/2o/96 o

Checked By: 3 J /" M -7bo/ef -

d/uu%f. $

Checked By: '//.20/95 0 V Approved By: /[7/M ~7/2.0/7 QA Condition 1  !

l NOTE The contents of this document have been reviewed to verify that no material herein either  !

directly or indirectly changes or affects the results and conclusions presented in the 10CFR50.59 M2C10 Reload Safety Evaluation (calculation file: MCC-1552.08-00-0250).

l 9507250096 950720 PDR ADOCK 05000370 P PDR

MCEl-040047 y 't . '

Page 2 of 19 Revision 4 McGuire 2 Cycle la Core Operating Limits Report REVISION LOG Revision Effective Date Effective Pages COLR OriginalIssue August 25,1993 N/A M2C09 .

Revision 1 June 20,1994 N/A M2C09, Rev.1 Revision 2 October 18,1994 N/A M2C09, Rev. 2 Revision 3 December 9,1994 Pages 1 - 19 M2C10 Revision 4 July 13,1995 Pages 1-3,11 M2C10, Rev.1  ;

i

MCEl-0400 47 Page 3 of 19 Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report INSERTION SilEET FOR REVISION 4 l Remove pages Insert Rev. 4 pages MCEl-0400-47,it i. 3 pages 1-3,11 MCEI-0400-47, rev. 4 pages 1-3,11

e q 1

MCEI-040047

  • o,' Page 11 of 19
  • - Revision 4 McGuire 2 Cycle 10 Core Operating Limits Report (FuKy%3tUrawn ,

min 22L mat.231) 240

/ (29.6 %,231) ,- (80%.231) p 220

  • *; '*- - - -- ~~ ~~ ~~

~~; " ' ' ~~ ~

200 '

' Bank B 180 ,

' ,' (100 %,161) :

(0%,163) , ,

g ~

140 s ,

Inserte.n Position 120 Bank C

'.r' (Steps '

Withdrawn)100 ,- j r 80 , , Bank D s ,

3- ,r 40 - (0%,47) ! ,

20 '

' l (30%,0) l 0 l 0 10 20 30 40 50 60 70 80 90 100 Fudy Instreed) Relative Power (Percent)

Figure 2 Control Rod Bank Insertion Limits Versus Percent Rated Thermal Power ,

l NOTE: Compliance with Technical Specification 3.1.1.3 may require rod withdrawal limits.

Refer to OP/2/A/6100/22 Unit 2 Data Book for details. If reactor powcr is turbine limited, a penalty of 2.3 steps for each percent power below 100% to which the  ;

reactor is limited will be required. Refer to OP/2/A/6100/22 Unit 2 Data Book for .j details. I i

l i