Monthly Operating Rept for Jan 1984
ML20086M800
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/31/1984
From: Clayton F, Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8402170089
Download: ML20086M800 (5)


Text

. .

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS i JANUARY, 1984 Recovery from the automatic shutdown on December 31, 1983 continued into the month of January. During the month of January, there were two (2) automatic shutdowns. The first occurred on January 18, 1984 and the second occurred on January 30, 1984.

The following safety-related maintenance was performed in the month of January:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced B seal injection filter.
3. Inspected reactor trip and bypass breakers.
4. Repaired control circuit on containment isolation valve 8820B.

i E

(

4 4

8402170089 840131 POR ADOCK 05000364 R PDR &

O '

OPERATING DATA REPORT I

DOCKET NO. 50-364 DATE 2/7/84 ,

COMPLETFD BY W.G. Hairston, III' i

TELEPHONE _- (2n5) 899-5156 OPEllATING STATUS Joseph M. Farley - Unit 2 Notes

1. Unit Name:
2. Reporting Period: January. 1984 4 2652
1) Cumulative data since

_3. Licensed Thermal Power (MWt): 7/30/81, date of

4. Nameplate Rating (Gross MWe): 860 commercial operation.
5. Design Electrical Ra:ing (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe): 854.7
7. Maximum Dependable Capacity (Net MWe): 813.7
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Level To Which Restricted. lf Any (Net MWe): N/A
10. Reasons For Restrictions.If Any: N/A-This Month Yr to.Date "Cdniulative

!!. Hours In Reportmg Period 744 744 - 21,985

12. Number Of Hours Reactor Was Critical 71o R-719.8 19,262.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On.Line 682.7 682.7 18.981.5

' 15. Unit Rese:ve Shutdown Hours 0.0 -0.0 0.0

16. Gross Thermal Energy Generatedt MWH) l'"I'
  • _47_ nso . 7 T7 1: 711:R91 .
17. G ors Electrical Er:ergy Generated (MWH) R56 858 _ 336.858 15.543.734 _
18. Net Electrical Energy Generated (MWH) 527.612 527.612 ,,14.727.638.
19. Unit Service Factor 91.8 91.8 86.3
20. Unit Avai'. ability Factor 91.8 91.8 86.3
21. Unit Capacity Factor (Using MDC Net) 87.2 87.2 82.3
22. Unit Capacity Factor (Using DFR Net) **D Rs_s 80.8 l
23. Unit Forced Outage Rate 8.2 8.2 5.4 24.' Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):-

N/A '

' . 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

~~26. Units in Test Status (Prior to Commercial Operation): Forecast iAchieved -

' INITIAL CRITICALITY 5/6/81 5/8/81 R INITIA L ELECTRICITY. 5.4241.3.1 5/2S/81 COMMERCIAL OPERATION 8/1/81 7/30/81-

< -(o/77:.

" '~ '

DOCm NO. 50-364 UNIT 2 1

DATE 1/7/84 W.G. Hairston, III COMPWD BY TELEPHONE (2051899-5156 January, 1984 5tCNTil DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL '

talWe-Net) (5tWe-Net)

!, 37 _ 17 828

', 742 82

. I.o

.3 826 g9 59 830 578 4  ;-

830 648 3 73 6

830 n 824 778 828 7 23 g

830 ;4 827 826 826 9 .j,.

818 10 26

' 828 1I 7 821 12 830 23 826 13 822 ;9 gw 826 -559 14 30 15 831 3g 3;g 16 827 BISTRUCTIONS  ;

On this fomut.!ist the averste daily unit power levelin A!We-Net for each by in the reporting munth. Compute to

, the neare:t whole me;: wast.

(9p7) e-, ,w e f y. ,-. ,s%, - .< - . . - + . . . e p .,w ...y.. ,%-

2

'9 UNIT SilUTDOWNS AND POWER REI)UCT10NS DOCKET NO. 50-364 UNIT NAME J.M. Farley-Unit 2 DATE 2/7/84 COMPLETE!) fly W. G. Ifairston, III REPORT MONill _ Januarv- 1984 TEl.LPflONE _(205) 699-5156

.!E "y E' ~ Lkensee g e, cause a c.usective No. Date ( Eg  ;; ) 5 a:

2 Event gT h'8 n Action to b

dE E j gy, g Repent * ,

in 0 ju Pr: vent Recussence 6

001 840101 F 16.7 H 3 NA NA NA :ontinued from 12-31-83, Rx trip due to low level in A S/G in coincidence with

, steam flow greater than feed flow.

002 840118 F 34.8 A 3 84-001-00 JB FCV Jnit was beino shut down for repair of power range channel N-44. While ramping down, the unit tripped inadvertently due to 10-10 level in 2C S/G.

003 840130 F 9.8 A 3 84-003-00 JC .PT unit tripped due to 10-10 level in 2C S/G following failure of PT-495.

i 1 3 4 F: liuted Reason: Method: Exhibit G. Instructiims i

S: Stheilnied A l'quipenent railure(Explaia) 1 Manual for Peepmasjon or D.a4 n Mainienance e,i Test 2 Manual Scearn. I:ntiy Sheets for I.iicusee C RcIncling 3. Autunutic Sciaan. I sent Repius il I.10 l'ile INtlRIE

, D Regulatiny Hestektion 4 Oiher (Emplain) 0161) 1.-Opciains lealning A license Examination F. Administiasise 5 G Opciailinial I sins (E mphin) INint in I . S.une Sonoce I'll77) 11 Ollies (l% plain) i

Malling Address

! Alabama Power Company 600 North 18th Street Post Ot$ce Box 2641 g Birmingham Alabama 35?91 Telephone 205 783-6081 F. L C'ayton, Jr.

Senior Mce President Flintndge Building Alabar11aPotver thesouthern eiectnc system February 10, 1984 Docket No. 50-364 Director, Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the January,1984 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.'0 of the Unit 2 Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, Ms

. . Clayto Jr.(

FLCJr/KWM: sam Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) k 4V0

- . - - .