Requests Extension of Final Reporting Date for Response to IE Bulletin 83-06 Re Tubeline Products to 840430.Addl Time Needed to Complete in-depth Search & Review.No Evidence of Tubeline Products Found to Date
ML20086L620
Person / Time
Site: Fermi 
Issue date: 01/30/1984
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 EF2-66-464, IEB-83-06, IEB-83-6, NUDOCS 8402080338
Download: ML20086L620 (2)


Text

_

a DMb Donald A. Wells g; ego gy A% rave Edison EtEi=>-

January 30, 1984 EF2 - 66,464 Mr. James G. Keppler Regional Administrator U. S. Nuclear Regulatory Conunission Region lli 799 Roosevelt Road Glen Ellyn, Illinois 60137 Ref erence: Enrico Fermi Power Plant, Unit 2 USNRC Licensing Docket:

50-341 USNRC IE Bulletin 83-06 (7-22-83)

Detroit Edison Letter EF2 - 64,690 (11-22-83)

Subject:

Detroit Edison Interim Report Response to NRC IE Bulletin 83-06

Dear Mr. Keppler:

in response to the subject bulletin request, we submitted the referenced interim report on Detroit Edison's investigation for the determination of the existence of Tubeline products at the Enrico Fermi 2 site.

To date Project quality Assurance for the Enrico Fermi Power Plant, Unit 2, has reviewed most of the records of site contractors and has found no evidence of Tubeline products. Also, General Electric advises us of similar results.

Originally, we had committed to a final report date of February 1, 1984. However, we find that additional time is needed to complete our in depth search and review.

Therefore, we request an extension of the final reporting date.

A final report will be submitted by April 30, 1984. Should you require additional information from Detroit Edison in this matter, please advise us.

Very truly yours,

'1fff(;

8402000338 840130 PDR ADOCK 05000341 G

PDR j

j DAW /JDR/ms 1 6

_ __ J

3 Mr. James.G. Keppler January 30, 1984 EF2 - 66,464 Page 2 cc: Director Division of Reactor Construction inspection Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washing ton, D. - C.

20555 Mr. Paul Byion Senior Resident inspector U..S. Nuclear Regulatory Commission Resident inspector's Office 6450 North Dixie Highway Newport, Michigan 48166 Mr. M. D. Lynch Division of Licensing Of fice of Nuclear Reactor Regulation U. S.. Nuclear Regulatory Commission

- Wash ing ton, D. C.

20555 Document Control Desk U. S. Nuclear Regulatory Commission Washing ton, D. C.

20555 i

s T

.