Monthly Operating Rept for Nov 1991 for Jm Farley Unit 1.W/
ML20086L547
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/30/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9112160314
Download: ML20086L547 (5)


Text

___ _ __ _ _ _ _

+

. w,.m, r; ., cm i o, 45 b w r.eu Ce'w ' ~ 6 6 tey

, I to CWe 1% A M.-

  • A E..ouwv e, Am:, vr ' 9.W 5
  • wo,W. , a io s vn,u L '

i o. wovo.,e v.c c r:ew,..en ,e, tiemix r 12, 1991 Alabamal\)Wer i d'y y I's pg+ ) '* '4 .

f9$ f l, i Docket No. 50-348 U. S. Nuclear Regulatory Commission AT1N: Document Control Desk l Washington, D. C. 20555 Joseph M. f arley Nuclear ilant Unit 1 Monthlyfrerating Data Report Gentlemen:

Attached is the November 1991 Monthly Operating Report for Joseph M. farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical

-Specifications.

l If you have any questions, please advise.

Respectfully submitted, kJ. khntkM

. Woodard l

AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. hoffn."i Mr. G. f. Maxwell i

1 a . .

.r. e s . . , a
1. i l fM2160314911tso u

i .-

r< ADOCK 05000248 PDR [dM ip

l b .

JOSEPil M. PARt.EY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS November 1991 There were no unit shutdowns or major power reductions during the month of )

November.  !

The following major safety-telated maintenance vas performed during the month: 1

1. Miscellaneous-corrective and preventive maintenance was performed on the diesel generators.
2. "B" charging pump seal replacement.
3. "C" charging pump quarterly preventive maintenance.
4. Miscellaneous correctivo and preventive traintenance was performed on the "B" motor driven auxiliary feedvater pump, the turbine driven auxiliary feedvater pump and the "A", "B" and "C" coreponent cooling water pumps. '

l

1

. OPERATING DATA REPORT DOCKET NO. 50-348 DATE December 4, IT9I ~

COMPLETED BY 'b. IC}ios ey TELEPil0NE (255T505M6 OPERATING STATUS ~

Notes

1. Unit flame _

Joseph H. Farley ~~ Unit 1 1) Cumulative data since

2. Reporting Period November 19V1 12-1-77, date of

~

3. Licensed Thermal fover (Mut): 2,652 ~~

commercial operation.

4. Nameplate Rating (Gross HVe):~ 866~
5. Design Electrical Rating (Net HVe): 829
6. Maximum Dependable Capacity (Gross i@e): 856.4
7. Maximum Dependable Capacity (Net HVe): 81T.0 _
8. If Changes Occur in Capacity Ratirgs (Items Number f through'7) Since Last Report, Give Reasons: N/A
9. Power Level To Vhich Restricted. T Any (Net HVe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Tr-to-Date Cumulative
11. Ilours In Reporting Period 720 8016 122,712
12. Number Of floura Reactor Vas Critical 720 6217~6~ 95,166.9
13. Reactor Reserve Shutdovn flours ~~DT 0. 0_ . ~3,650.0~
14. Ilours Generator On-Lino 720 6128.6 933 520.3
15. Unit Reserve Shutdovn llours 0.0 -

0.0 0.0

16. Gross Thermal Energy Generated (HVil) I]909,440.0 T5,809,292.9 239,443,273.9
17. Gross Electrical Energy Generated (MVH) 621,704 5,095j'l26 77,145,464
18. Not Electrical Energy Generated (HVil) 590,162 4,804,164 ~ 72,807,696
19. Unit Service Factor f00.0 76.5 76.2
20. Unit Availability Factor 100.0 76.5 -

76.2

21. Unit Capacity lactor (Using HDC Net) 100.7 73.6 73.3
22. Unit Capacity Factor (Using DER Het) 98.9 TU -

71.6

23. Unit Forced Outage Rate 0 2 5- 7.2
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and DuFa~ tion of EachT:

_N/A

25. If Shut Down At End Of Report Period, Estimated Date of Startup N/A
26. Units In Test Status (Prior to commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77 ,

INITIAL ELECTRICITY 08/20/17 08/18/77 COHHERCIAL OPERATION 12/01/77 12/01/77 Form 2/34

{

_. _ - _ . . _ . - _ . - . _ . _ . ...__ _ .___.._ _ .._...-._.__.m...

I

~ '

l i

+! DOCKET NO. 50-348 )

UNIT __ 1 l DATE_ December 4, 1991 COMPLETED BY_D. N. Horey TELEPil0NE (205)899-5156 HORTil' November ,

DAY -AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY POVER LEVEL j (MVe-Net) (HVe ' et) ]

1 811 17 818 ,

2 823 18 815 3 823 19 814 4< 825 ,

20 813 5 826 21 811 l 6- 827 22 819 __

7- 827 23 819

8 822- 24 822 9 823 25 825- --

10l 821 26 824 11 823 27 __.823 12 823 ,

28 822 13 823 29 815 _ .

lo- 823 30 - 810 15 821 31 16' 798 '

-lNSTRUCTIONS ,

'T

'On this: format list the average daily unit power level in MVe-Net fer each day in the' reporting month. Compute to the nearest whole megavatt.

. _.- - , , _ . . _ _ . _ ,_ _ .- ._ . ,_ .. . , _ . - ~ .. - . . . -

UlfIT SIEN AND FOWER RCXETICIE4 DOGET EZP. M-348 ,

t2 TIT NAPE J.M.TaaE* - c!riT 1 , ,

ORTE _ N r 4, 1991 l CE2TEITED ST D. fr. ?OPET .

ECPORT 705TE R?l"CMBER FM 8205)f19-$154 I I u-rr Cmu s _u . .

l -

tuRAnon l wneD m _um or mzT sr=n enastsT xn= w REPCPT $ CCE CDIE FRETiil:LT RECCF223CZ PC. DW TYTT (IDUFS ) REASON l DCWit PIACTOR here were no tmit shut &nres or major powr re&ardons

' s dtaring the enth of Isosenber.

l I

I l 1 I l

i i

I i

  • iethod: Exhibit G-Instr actiaras F: Forced Reason:

1 4 anal for Properation of te*_a S: Sc heduled W 2igeoct railere (E m lain) 2-Manual scram. Entry sheets for Licensee 1>-ataintensnee or Test h tomatic scram. Event Repert(IZR) File ( N C-Eefueling 4 W e fExplain) 0161)

FRegulato q 9estriction E-Orerstor Training 6 1.i* 2m=* na tiern Ezhibst 1 -Same Source F-Administrative G cperational Error (Explain)

Page 1 b other (Ezplaint

  1. f a

' . a I

( 9 6 ,.

3 t

-U  ;

.