Monthly Operating Rept for Nov 1991 for Jm Farley Unit 2.W/
ML20086L546
Person / Time
Site: Farley 
Issue date: 11/30/1991
From: Dennis Morey, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9112160313
Download: ML20086L546 (5)


Text

.

0

, Alabama Power Company 40 insveness Centu Parkway Post Ottee Dox 1295 llamangha% Alabama 35201 h4phoone P05 668 5066 Ma J D. Woodard Alabama POWCf ve eimanni raney Pwet Em nber 12, 1991 g,

Docket No. 50-364 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.

20555 Joseph P.. farle) Nuclear Plant Unit 2 MontMy__Qperatina Dat a JfnqC1_.

Gentlemen:

Attached is the November 1991 Monthly Operating Report for Joseph M. farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have a' questions, please advise.

Respectfully submitted, N Di a tsk

. Woodard AEJ:edb3014 Attachments cc: Mr. 5. D. Ebneter Mr. S. T. Hoffman Mr. G. f. Maxwell l

. <J l

.s. e i.

[hM fil2160313 911130 c'DR ADOCK 05000364 R

f l

PDR

/

L JOSEPil H. FARif.Y NUCIEAR Pl. ANT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS November 1991 At 2000 on '1-8-91, power was reduced to approximately 61 percent for isophase bus duct cooling vork and governor valve testing. The unit returned to 100 percent power at 0045 on 11-10-91.

At 2149 on 11-24-91, power was reduced to approximately 55 percent to remove "2A" Steam Generator Feedvater Pump (SGFP) from service due to the low pressure governor valve oscillating. Main turbine governor valve testing was also performed during this power reduction.

"2/" SGFP was repaired and the unit was teturned to 100 percent pover at 0510 on 11-26-91.

At 1122 on 11-26-91, pover was reduced to approximately 55 percent to remove "2A" SGFP from service due to speed control problems. The "2A" SGFP was repaired and determined operable at 2023 on 11-27-91.

At 2246 on 11-27-91, operators commenced ramping the unit to 100 percent power.

At 0239 on 11-28-91, ramping was secured at 86 percent power due to "2A" SGFP speed oscillation. At 0245 on 11-28-91, operators commenced ramping down to 55 percent to remove "2A" SGFP from service.

Repairs were made to the "2A" SGFP and the unit returned to 100 percent power at 0229 on 11-29-91.

There were no unit shutdowns during the month of November.

The following major safety-related maintenance vas performed during the month:

1.

Hiscellaneous corrective and preventive maintenance was performed on the diesel generators.

l OPERATING DATA REPORT DOCKET NO. 50 364 DATE December 4, 1991 COMPLETED BY D. N. Morey TELEPHONRl205)B99-5156 OPERATING STATUS Notes

1. Unit Name:

Joseph H. Farley - Unit 2

1) Cumulative data since
2. Reporting Period November 1991 7-30-81, date of
3. Licensed Thermal Power (HVt):

2,651

6. Nameplate Rating (Gross HVe):

860 commercial operation.

5. Design Electrical Rating (Net MVe): 829
6. Maximum Dependable Capacity (Gross MVe):

864.2

7. Maximum Dependable Capacity (Net MVe):

824.0

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Vhich Restricted, If Any (Net MVe):

N/A

10. Reasons For Restrictions, If Any:

E/A This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720 8,016 90,625
12. Number Of Hours Reactor Vas critical

~720 7,736.1 78,120T3

~~

13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0

-15. Unit Reserve Shutdown Hours

~

720 7633.3 77,184.5

14. Hours Generator On-Line 0.0 0.0 0.0
16. Gross Thermal Energy Generated (HVH) 1,784,505.6 19,783,775 196,987,724
17. Gross. Electrical Energy Geiserated (MVH) 587,654 6,439,678

~34,646',984

18. Net Electrical Energy Generated (HVH) 558,208 6,119,204

~31,313,326

19. Unit Service Factor 100.0 95.2 85.2
20. Unit Availability Factor 100.0 95.2 85.2
21. Unit-Capacity Factor (Using HDC Net) 94.1 92.6 82.6

-22. Unit Capacity Factor (Using DER Net) 93.5 92.1 81.6

23. Unit Forced Outage Rate 0

3.2 4.2

24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

Refueling /Haintenance Outage, March 6, 1992, Approximatel,y 7 veeks

25. If Shut Down At End Of Report Period, Estimated Date of Startup N/A
26. Units In Tect Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 Form 2/30 1

I DOCKET No.

50-364 UNIT 2

DATE__ December 4, 1991 COMPLETED BY D. N. Moreg TELEPHONE (205)899-5156 MONTH

' November

. DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POVER LEVEL

-(hWe-Net)'

(MVe-Het) 1 827 17 831 2

841 18 828 3

841 19 823 4;

842 20 822

- 5 841

-21 820

. 6, 841' 22 832 7

340-23 833' 8-809 24 817 9

539 25

~ 33 4

10

-834 26 593 11 838 27 441

-- 12 840:

28 517 13 840 29 808 14 840'30-823 15 792 31

- 16 836 INSTRUCTIONS

. On this format, list the average daily unit power level in MVe-Net for each day in the_ reporting month. _ Compute to the nearest whole megava-

7 tEIT 3EUTDatEES AND FUMER REDOCTIGES N 1EO.

%-334 tarIT IEME J. Q. FJJIZT - t3CT 2 ERTE h e 4, E991 C*NtrtKTE: BT D.'W.

vezrrF REP 0EtT Mar:1t norpeEn TE:gygr*JE (2*J5tt**-5156 l 7CET DURATIOtt SRUTTIN3 E

$TSTEM CCFUWENT ACTICEI TO Dater REACTCMt' REPCRT $

CDDE CXX FRE7E!rf -_ - --- - -

No.

CATE TTPE (HOURS)

REASGI I

f49 911103 s

28.8 a

4 s/A At 200C hours en 11-4-91, pvwer was. reesced to agproximately 61 percent for isophase bus duct cooling work and gewerner valee testing. The unit returned to 100 percent power at 0045 on 11-10-91.

v10 911126 F

31.4 A

e WA JK LC At 1149 ca 11-24-91, gn=== was reduced to l

sgproelmately $5 percent te remose *2A* 1GFP free service d.se to the ".aer pressure gosorner valve encillating.

  • 2A* SGrP was repaired and the unit was returned to 100 percent pow =r at 0510 en 11-26-91.

Oil 911126 F

63.1 A

4 N/A JE SC At 1122 en 11-26-91, power was re&rced to appreminately 55 percert to reme=* *2A* SGFP from service em to speed control problems. The "2A*

m was repaired and # terummed og, cable et 2*J23 on 11-27-91.

At 2246 er= 11-27,., operstms c -.

.-2 ramptag the unit to 100 percent pewar. At 0239 m 11-28-91, ramping was secured at 86 gere=nt pcwor dtse to *2A* 3GFP speed escillaties. At 0245 en 11-28-91. eperators _ -._ 4 ranpi.tg dews to 55 percent to remove *2A' 3GFP from service. Sepairs were made to the *2A* SGFP and the at returned to l

100 percoat power er 0229 cc 11-2*-91.

l l

F: Forced Reasen:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Mamal for Pregeration of Data B-Maintenance or Test 2-stanual scram.

Entry sheets for License.

C-stefueling 3-festomatic scram.

twent Report (LER) File (22EG-D-Regulatory Restriction 4-ctfar (Explain) 8161)

E-operator training & 1.icense Examination F-A&tinistrative Fvh4 hit 1 -Same Source G-operaticeol Error (Explain)

(9M 7)

B-other (Explain)

I i

)

-.