ML20086L402

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Response Procedures,Including Rev 19 to ERP-110,App1,Rev 16 to ERP-110,App 2,Rev 16 to ERP-140,App 1,Rev 19 to ERP-140,App 2 & Rev 21 to ERP-140,App 3.W/911209 Release Memo
ML20086L402
Person / Time
Site: Peach Bottom  
Issue date: 11/08/1991
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086L406 List:
References
NUDOCS 9112160215
Download: ML20086L402 (4)


Text

_ - -

10 CFR 50 Appendix E,

.o Section v l'IllLADEll' Illa El.ECTRIC COMi%NY 4

NUCl.l!AR GROUP lii!ADQUARTIIRS 955 65 CllliSTliRilROOK !!LYD.

WAYNii, PA 19087 5691 (215) 640 MOO NUCLliAR l'NOINI.! klNG A $1.RVICl3 Di*ARTMl'N1 tiovember 8, 1991 Docket lios. *0-277 50-278 License fios.

DPR-44 DPR-56 U.S. 14uclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 SUBJECT Peach Bottom Atomic Power Station, Unitu 1 and 3 Emergency Plan Implementing Procedures Dear Sir Enclosed is revision 69 to the Emergency Responce Procedures for Peach Bottom Atomic Power Station, Units 2 and 3.

These procedures are being submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 10 CFR 50.4.

The following revised procedures are enclosed.

ERP-110 Rev.

19

" Emergency Classification Appendix 1 Notification Telephone List For An Unusual Event or Alert" ERP-110 Rev. 16

" Emergency Classification Appendix 2 flotification Telephone List For A Site Emergency or General Emergency" ERP-140 Rev. 16

" Emergency Director (ED)

Appendix 1 ERP-140 Rev. 19

" Technical Support Team Appendix 2 Leader (TSTL)"

r.

ERP-140 Rev. 21

" Dose Assessment Team

[

d Appendix 3 Leadar (DATL)"

gi ERP-140 Rev. 14

" Chemistry Sampling &

~

Appendix 4 Analysis Team Leader p,

(CSATL)"

f' 9112160215 911100

[

ADOCK 0500g7 DR

Peach Bottom Atomic Power Station tiovember 8, 1991 Emergency Plan Implementing Procedures Page 2 ERP-140 Rev. 13

" Damage Repair Team Appendix 5 Leader (DHTL)"

ERP-140 Rev. 12

" Security Team Leader Appendix 6 (STL)

ERP-140 Rev. 15

" Personnel Safety Team Appendix 7 Leader (PSTL)"

ERP-140 Rev. 10 "ficarby Public and Industrial Appendix 9 Users of Downstream Water" In accordance with 10 CFR 2.790(a)(6), we request that names and telephone numbers contained in the above procedures, ERP-110 and ERP-140, be withheld from public disclosure since such disclosures would constitute an unwarranted invasion of the persorni privacy of the individuals involved.

If you have any questions or require additional information, please contact us.

Sincerely, n

I

(,,/,w)( 14.4 k.

f L 1

G.

J.

Beck, Manager Licensing Section tiuclear Engineering f.

Services Enclosure cci T. T. Martin, Administrator, Region I, USt4RC (2 copies)

J. J.

Lyash, USliRC Senior Resident Inspector, PBAPS

f****vg UHill D ST A1i S f.

,f.,

{

)

g NUCLE Aft itLGULA10 fly COMMISSION

.j w Asm901oN, o c at.a o,

\\.....'

December 9, 1991 Docket 50 - 2 7 '/ / 2 7 8 p r A C H BOTT011 ATOMIC POWLR STATION MEMORAtlDUM FOR:

Chief. Document Control Branch, IRK FROM:

Director, Division of freedom of Information and Publications Services, ADM

SUBJECT:

Rt

..'W Of UTillTY EMERGEf40Y PL Afi DOCUMEliT AT10H The Division of freedom of Information and Publications Services has reviewed the attached document and has detennined that it may now be made publicly j[

7 available, P

,dinw d,tk, &.,

j' Donnie H. Grimsley, Direct Division of freedom of infonnation and Publications Services Offict nf Administration l /

'f \\

=.. :

g

.