Monthly Operating Repts for June 1995 for Calvert Cliffs NPP Units 1 & 2
ML20086L290
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/30/1995
From: Cruse C, Olsen H
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9507210134
Download: ML20086L290 (12)


Text

, _ _ _ _ _ _ _ _ _

, i 4

CurOLEs II. Cat;sE Baltimore Gas and Electric Company Plant General Manager Calvert Cliffs Nuclear Power Plant f

' 1650 Calvert Cliffs Parkway Calven Cliifs Nuclear Power Plant Lusby, Maryland 20657 410 586-2200 Ext. 4101 Local 410 260 4 101 Baltimore July 14,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 June 1995 Operating Data Reports The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

l Very truly yours, ut J/ / W CllC/Il00/bjd Attachments cc: D. A. Brune, Esquire R. A. Hartfield, NRC J. E. Silberg, Esquire R.1. McLean, DNR L. B. Marsh, NRC J. II. Walter, PSC D. G. Mcdonald, Jr., NRC P. Lewis, INPO T. T. Martin, NRC K. N. Larson, ANI ,

P. R. Wilson, NRC i

)

210031 / t 9507210134 950630 /

PDR ADOCK 05000317 \

R PDR

D6cument Control Desk

. July 14,1995 Page 2 bec: R. E. Denton L. B. Russell /J. R. Len ons .

W. R. Corcoran/M. J. Micrnicki P. E. Katz/P. G. Chabot J. G Keppler D. A. Ward C. P. Johnson /A. R. Thornton S. R. Buxbaum, Jr/D. A. Wright T. N. Pritchett K. J. Nietmann G. L. Detter K. R. Escr S. B.1-laggerty R. P. lleibel K. R. Neddenien P. A. Pieringer M. G. Polak i1. O. Olsen E. M. Lotito M. J. Barranco T. Morello/M. J. Fick II. D. Enoch J. E. Rivera F. Yost, UDI L. S.12rragoite J. E. lijelseth, ABB File # 02.05.04 NRC Chrono File NRC 95-039 l

i l

oce************************************************************************* l UNIT 1 l OPERATING DATA REPORT oc**************************************************************************

Docket No. 50-317 July 14, 1995 Prepared by Herman O. Olsen Telephone:(410)260-6734 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD JUNE 1995
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 865
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 835
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date
11. HOURS IN REPORTING PERIOD 720 4,343 176,604
12. NUMBER OF HOURS REACTOR WAS CRITICAL 614.4 4,237.4 127,118.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 603.0 4,226.0 124,462.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,571,185 11,313,450 316,481,343
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 514,956 3,762,745 105,133,361
18. NET ELECTRICAL ENERGY GENERATED (MWH) 489,890 3,609,552 100,103,820
19. UNIT SERVICE FACTOR 83.8 97.3 70.5
20. UNIT AVAILABILITY FACTOR 83.8 97.3 70.5
21. UNIT CAPACITY FACTOR (USING MDC NET) 81.5 99.5 68.6
22. UNIT CAPACITY FACTOR (USING DER NET) 80.5 98.4 67.1
23. UNIT FORCED OUTAGE RATE 16.3 2.7 8.6
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

N/A

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A 4  !

l l

l l

4 AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 July 14, 1995  ;

Prepared by Herman O. Olsen '

Telephone: (410) 260-6734 JUNE 1995 i Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 846 17 -30 2 852 18 -29 3 768 19 -31 4 795 20 -31 P

5 834 21 29 6 847 22 530 7 848 23 831 8 847 24 841 9 843 25 842 10 847 26 840 11 848 27 840 12 847 28 841 13 848 29 840 14 848 30 842 15 847 1 16 694 1

H

UNIT SIIUTDOWNS AND POWER REDUCTIONS '

DOCKET NO. 50-317 UNIT NAME Cahert Cliffs-U1 ^

DATE Julv 14.1995 .

COMPLETED BY Herman O. Olsen TELEPHONE (410)260 4 734 REPORT MONTil June 1995 MET 110D OF

. SIitflTING UCENSEE CAUSE & CORRECTIVE l DURADON DOWN EVENT SYSTEM COMPONTNT ACRON TO NO. DATE l TYPEI (IIOURS) REASGN2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE 95001 061695 F 117.0 A 2 317/95-002 SJ P On 06/16/95 at 1917 the unit was manually tripped after receiving S/G low level pretrips due to lowering S/G levels. The low S/G levels were caused by the loss of 12 SGFP. Subsequent imestigation restated that wear of the overspeed trip latch mechanism ns the root cause. Repairs were made to the affected pump and the preventive maintenance procedure for overhauling the SGFP was revised to require examination of the trip mechanism.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Exammation 5 - Reduced Load F - Administrative 9 - Other G - Operational Error H - Other

= _ _ _ _ - _ . .. . .. . .

l DOCKET NO. 50-317 CALVERT CLIFFS - UNIT I July 14,1995

SUMMARY

OF OPERATING EXPERIENCE June 1995 The unit began the month at 100% power (840 MWe).

On 06/16/95 at 1917 the unit was manually tripped following the loss of 12 Steam Generator Feed Pump (SGFP). An investigation revealed that wear of the overspeed latch mechanism, over a period of many years, to be the cause of the loss of 12 SOFP. The overspeed trip mechanism was repaired and the unit was restarted.

The unit was paralleled to the grid on 06/21/95 at 1618. Power was returned to 100% (825 MWe) at 0346 on 06/23/95.

The unit ended the month at 100% power (835 MWe).

l I

l 1

. I

July 7,1995 NFM 95-189 Page 2 of 3 REFUELING INFORMATION REOUEST

l. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: March 1,1996
3. Scheduled date for restart following refueling: April 27,1996
4. Will refueling or resumption of operation thereafter require a Technical Specification change or L other license amendment?

Yes.

a. License amendment to reficct the new electrical distribution system configuration.
b. An amendment and exemption to allow the use of four lead fuel assemblies with advance cladding material.
5. Scheduled date(s) for submitting proposed licensing action and supporting information.

I

a. August 1995* I
b. July 1995*
6. Important licensing considerations associated with the refueling.

Physical modifications required to bring Calvert Cliffs in compliance with the Station illackout rule will be completed in the 1996 Unit I refueling outage.

l

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1434 (Note 2)*

Spent fuel pools are common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. l (a) 4710 (Note 1) (b) 0
9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 totallicensed site storage capacity.

(1830 pool + 2880 ISFSI)  !

NOTE 2: 216 Spent Fuel Assemblies in the ISFSt.

24 assemblics are in transit.*

4 Entry has changed since last reported.

es**************************************************************************

UNIT 2 OPERATING DATA REPORT ce**w,**********************************************************************

Docket No. 50-318 July-14, 1995 Prepared by Herman O. Olsen Telephone:(410)260-6734 OPERATING STATUS

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD JUNE 1995
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 911
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 870
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 840
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A Year- Cumulative This month to-Date to Date
11. HOURS IN REPORTING PERIOD 720 4,343 159,959
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 2,788.8 116,825.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 720.0 2,719.3 115,170.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,935,193 7,113,128 294,610,057-
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 629,336 2,356,751 97,372,060
18. NET ELECTRICAL ENERGY GENERATED (MWH) 603,831 2,246,027 93,067,637
19. UNIT SERVICE FACTOR 100.0 62.6 72.0
20. UNIT AVAILABILITY FACTOR 100.0 62.6 72.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 99.8 61.6 70.4
22. UNIT CAPACITY FACTOR (USING DER NET) 99.2 61.2 68.9
23. UNIT FORCED OUTAGE RATE 0.0 6.0 5.9
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX HONTHS (TYPE, DATE AND DURATION):

N/A

25. IF UNIT IS SHUTDOWN AT END OF_ REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A

~

AVERAGE DAILY UNIT POWER LEVEL c ce**********************************************************************

Docket No. 50-318 Calvert Cliffs Unit No. 2 July 14, 1995 Prepared by Herman O. Olsen

  • Telephone: (410) 260-6734 JUNE 1995 Average Daily Power Level Average-Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 849 17 839 2 851 18 840 ,

3 850 19 839 4 847 20 839 5 847 21 844 6 847 22 844 7 845 23 837 8 844 24 837 9 840 25 837 ,

10 846 26 835 11 795 27 835 12 794 28 837 13 843 29 835 14 844 30 836 15 842 16 843 i

. . , - . . n- -- -

UNIT SHUTDOWNS AND POWER REDUCTIONS '

DOCKET NO. 50-318 UNIT NAME Cahrrt Cliffs-U2 ,

DATE Julvl4.1995 -

COMPLEED EY Herman O. Olsen .

TELEPHONE (410)260-6734 REPORT MONTH June 1995 -

METHOD OF SHUITING LICENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM CONTONENT ACITON TO NO. DATE TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODES PREVENT RECURRENCE

' There were no significant power reductions for this month.

i 4

1 p. Forced 2 Reason 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.

C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Traming & License Exanunation 5 - Reduced Load F - Admmistrative 9 - Other G - Operational Error H - Other

4 DOCKET NO. 50-318 CALVERT CLIFFS - UNIT 2 July 14,1995

SUMMARY

OF OPERATING EXPERIENCE June 1995 l.

The unit began the month at 100% power (840 MWe). On 06/11/95 at 0130 power was reduced to 95% to repair a pump casing gasket leak on 21 Ikater Drain Pump. Repairs were completed and power was restored to 100% on 06/12/95 at 2106.

The unit ended the month at 100% power (835 MWe).

i e _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______ _ _ _ _ _ _ _ _ _ _ _ _ _ _

n July 7,1995 NFM 95-189 Page 3 of 3

~

REFUEI,1NG INFORMATION REOUEST

1. Name of facility: Calvert Clifts Nuclear Power Plant, Unit No. 2
2. Scheduled date for next refueling shutdown: March 1,1997
3. Scheduled date for restart following refueling: April 11,1997
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

No, t

5. Scheduled date(s) for submitting proposed licensing action and supporting infonnation. ,

None.

6. Important licensing considerations, associated with the refueling.

None.

7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1434 (Note 2)*

Spent fuel pools are common to Units I and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in  ;

licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 4710(Note 1) (b) 0 I l

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.

March 2007 NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 ISFSI)

NOTE 2: 216 Spent Fuel Assemblies in the ISFSI.

24 assemblies are in transit.*

]

1 a

Entry has changed since last reported.

l 4

I 1

-- _---_- - - --- -- -