Forwards Engineering Evaluation Rept, Temporary Loss of All AC Power Due to Relay Failures in Diesel Generator Load Shedding Circuitry. Practice of Running Emergency Power Sources in Parallel W/Offsite Power Sys May Be Prevalent
ML20086J892
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/06/1984
From: Heltemes C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20086J894 List:
References
REF-GTECI-A-44, REF-GTECI-EL, TASK-A-44, TASK-OR NUDOCS 8401250468
Download: ML20086J892 (3)


Text

.

pn racq 8-o UNITED STATES

[j% vyf( h NUCLEAR REGULATORY COMMISSION

,,. % /

y WASHINGTON, D. C 20555 M6 1983 MEMORANDUM FOR:

Harold R. Denton, Director Office of Nuclear Reactor Regulation FROM:

C. J. Heltemes, Jr., Director Office for Analysis and Evaluation of Operational Data

SUBJECT:

ENGINEERING EVALUATION REPORT ON TEMPORARY LOSS OF ALL AC POWER AT FORT ST. VRAIN Forwarded herewith is our Engineering Evaluation Report entitled " Temporary Loss of All AC Power Due to Relay Failures in Diesel Generator Load Shedding Circuitry" for your infomation and appropriate action. The report is based on the review of a loss of offsite power event that led to the total loss of AC power at Fort St. Vrair,.

Based on our review of the event and related operational experience, we believe that the practice of r*Jnning the emergency onsite power sources in parallel with the offsite power system, while the offsite power system is experiencing problems, (a practice that led to the total loss of AC power at Fort St. Vrain), may be prevalent at other nuclear power plants. We consider this operational experience to be of significant concern, and her.ce, have included recommendations in this Engineering Evaluation Report for your consideration.

The concern addressed in this report could have been considered in the ongoing USI A-44, " Station Blackout." However, it is our understanding that the USI A-44 report is being finalized and may not be able to incorporate the operational considerations of this report.

We would be pleased to discuss the infonnation contained in this report with appropriate members of your staff at a mutually convenient time. Please contact Karl V. Seyfrit or Matthew Chiramal should you have any questions concerning the report. Please let me know if this office can provide additional assistance.

enies[

, Director C.

e Offb for Analy and Evaluation of Operational Data

Enclosure:

As stated cc: w/ enclosure:

H. Thompson, NRR E. Jordan, IE D. G. Eisenhut, NRR E. Rossi, IE R. Mattson, NRR T. Murley, Region I M. Srinivasan, NRR J. O'Reilly, Region II J. Knight, NRR J. Keppler, Region III 7'

N m

? W O j h. M rti

'$KCWWY Rg nY L