Environ RO 75-3:on 750211,second Fan Lost on Cooling Tower C.Caused by Loosening or Fracture of Mounting Bolts.Fan F Will Be Returned to Svc as Soon as Conditions Permit.Fan D Awaiting New Shaft Bearing Box Prior to Repair
ML20086H962
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/21/1975
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Giambusso A
Office of Nuclear Reactor Regulation
References
RO-75-3, NUDOCS 8401200372
Download: ML20086H962 (2)


Text

- ,

O. <

0 - w a PHILADELPHIA ELECTRIC COMPANY >

e g g, eN -

<. = pg , 44 2301 MARKET STREET f df i PHILADELPHI A. PA.19101 -

6I Y N d; T[i:jj-)'

( y ;, ;;d p. g C'!

s 2 ,

wisi s414ooo Q

M d h ,f k'

Febmary' 21,1975

(

Mr. A. Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulations United States Nuclear Regulatory Carcuission Washington, D.C. 20555 s

Dear Mr. Giambusso:

Subject:

Environmental Deviation The following deviation was reported to Mr. Walt Baunack, Office of Inspection and Enfomement, Region 1, United States Nuclear Regulatory Camissicn on Febmary 12, 1975 Ruleruicus Licumu Uuduer L?R-IA/55 Environmental Technical Specifications: 2.1 Rcport No.: 50-277/278-75-3 Report Date: Febmary 12, 1975 Deviation Date: Febmary 11,1975 Facility: Peach Bottcm Atomic Power Station Units 2 and 3 R.D.1, Delta, Pennsylvania 1731h Identification of Deviation:

l Loss of the second fan on the 'C' cooling tower.

l Conditions Prior to Deviation:

Units 2 and 3 both operating essentially at full power.

Units 2 shutdown late on Febmary 11,1975 Description of Deviation:

With the tower in service, the 'D' f in shaft bearing box came loose and dropped frtxn its support pedestal to the base of the tower.

{O' '; P.

8401200372 750221 ,M - 24.L V POR ADDCK 05000277 PDR S

COPY SENT REGION 1 _

Mr. A. Giambusco Febmcry 21,1975 hs Pcga 2 '

r, Desiniation of Apoarent Cause of Deviation:

Loosening or fracture of mounting bolts.

Analysis of Deviaticn:

There were no significant environmental consequences as a result of the inoperability of this additional fan. The water temperature leaving the tower changed only slightly. Tmperature differentials '

frcan Holtwood to the Pennsylvania-Maryland State boundary rmained with-in linits. River flow exceeded 25,000 cubic feet per second during the period that the two fans were inoperable.

Correctivo" Action:

In orde'r:to recover the shaft bearing bar it was necessary to rmove service for a short period of time. The shaft bearing box was removed from the base of the tower and the tower returned to service with 9 of the 11 fans operating.

Because of the extremely cold weather and the ice coating on the top of the tower, replacment of the defective motor on the 'F' fan was not censidered prudent. The 'F' fan will be retumed to service as soon as working conditions pcmit. . .The 'D' fan must await.n new shaiu ceanng oux pnor to repair. It is expected that 10 of the 11 ~

  • fans on this cooling tower will again be operabic within 10 days.

_ Failure Data:

There have been no previous failures of the cooling tower fan shaft bearing box supports. t Very truly yours, M J. Cooney Ass't Gen'l Superintendent Generation Division cc: . Mr. J. P. O'Reilly~

Director ad Office of Inspection and Enforement Region 1 United States Nuclear Regulatory Ccr=nission 631 Park Avcnue King of Prussia, PA 19h06

[