Text
'
n r1
!w.
V V
P PHILADELPHIA ELECTRIC COMPANY i
2301 MARKET STREET g.'
PHILADELPHIA. PA.19101
/\\'
b I
SY
.r n :
{. '-
1215 841-4000 JUL1 E'l5-A June 27, 1975
{
.f g
Q'N 'ZI' ; ' ' ' ~
Mr. A. Giambusso Dire tor Division of. Reactor Licensing Office of Nuclear Reactor Regulations United States Nuclear Regulacory Commission Washington, DC 20555 s.
Dear Mr. Giambusso:
Subject:
Environmental Deviation The following deviation was reported to Mr. Walt Baunack, Region 1, Office of Inspection and Enforcement, United States Nuclear Regulatory Commission on June 18, 1975
't eforence:
License Number DPR-44/56 Environmental Technical Specifications 2.1 Report No.:
50-277/278-75-11 Report Date:
June 27, 1975 Deviation Date:
June 18, 1975 F aci lity:
Peach Bottom Atomic Power Station Units 2 and 3 R.D. 1, Delta, Pennsylvania 17314 Identification of Deviation:
Removal of a second cooling tower from service within the allowable 48-hour maintenance period.
Conditions Prior to Deviation:
With the 'C' cooling tower out of service for scheduled main-tenance (less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) the
'A' cooling tower was removed from service due to a gross leak on the distribution header.
Designation of Apparent Cause.of Deviation:
Failure of the banding around the distribution header which resulted in the blowout of a portion of this wooden structure.
-h 6401200347 750627 PDR ADOCK 05000277 N g,3 S
PDR fl COPY SWI' REGION /C gg
l Mr.A.Giambusso()
()
-e 50-277/278-75-11
, June - 27,~ 1975 Page 2 Analysis of Deviation:
Since the "A" to,wer was out of service for only 30 minutes, there were no significant environmental consequences as a result of this deviation. River flow during this period was in excess of 45,000 cfs.
Corrective Action:
The damaged wooden planking was replaced and secured by a stainless steel plate and the tower was returned to service.
Failure Data:
Environmental Deviation Reports 50-277/278-74-2,- 50-277/278-75-1, 50-277/278-75-2, 50-277/278-75-6, 50-277/278-75-8 and 50-277/278-75-10.
Very truly yours,-
.J Cooney Ass' Gen't Super'ntendent Generation Divis on cc: