Forwards Rev 4 to CNS Second Ten Yr Interval ISI Program for ASME Class 1,2 & 3 Components, Per Commitments Stated in Ref Documents
ML20086H751
Person / Time
Site: Cooper Entergy icon.png
Issue date: 07/14/1995
From: Mueller J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086H752 List:
References
NLS950139, NUDOCS 9507180263
Download: ML20086H751 (3)


Text

- _ _ _ _ - _ _

1, M Nebraska Public Power District P.O. BOX B

60321

  • iL%bT,""

NLS950139 July 14,1995 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Second Interval Insenice Inspection Program Cooper Nuclear Station Docket No. 50-298, License No. DPR-46

Reference:

See Attachment 1 Gentlemen:

Enclosed with this letter is the fourth revision of the Cooper Nuclear Station's Second Interval Inservice Inspection (ISI) program. This program has been revised in accordance with the commitments stated in the referenced documents. The revised program includes additional components (including Reactor Equipment Cooling and Senice Water systems), containment penetrations, and relief requests. Existing reliefrequests l'av: ' on reformatted and repaginated.

Corrections have been made in certain cases to reficct chai the system boundaries, components, component classifications, or to provide clarifiunon. The enclosed package also contains relief requests that were previously submitted for NRC review and approval per References 6 and 7.

The enclosed information concludes the corrective act ons committed to in References 1 through i

5 for the second ten-year interval. Since the additional relief requests are being reviewed separately, no action is required regarding this submittal. If you have any questions regarding this submittal, please call.

Sincerely,

3. H. Mueller Site Manager

/dnm

/

Enclosure 0kL sAyv 1

L J.

o g

9507i80263 9507:4 PDR ADDCK 050C' 298 c

PDR

-.. m.

j_

nn-___==_

~

NLS950139 July 14,1995 Page 2 of 2 cc:

Regional Administrator USNRC Region IV Arlington, TX NRC Resident Inspector Cooper Nuclear Station NRC NRR Project Manager Rockville, MD NPG Distribution l

I~

l

NLS950139 July 14,1995 Attachment i

References:

1)

Letter (No NSD931162) to U.S. NRC Document Control Desk from Nebraska Public Power District dated November 12,1993," Reply to Notice of Violation (NRC Inspection Report 93-17)"

2)

Letter (No. NLS950069) to U.S. Nuclear Regulatory Commission from Nebraska Public Power District dated March 16,1995," Reply to Notice of Violation (NRC Inspection Reports 94-14,94-16, and 94-19)"

3)

Letter (No. CNSS948056) to U.S.NRC Document Control Desk from Nebraska Public Power District dated February 17,1994," Transmittal of Cooper Nuclear Station License Event Report No.93-026, Revision 1" 4)

Letter (No.CNSS948204) to U.S.NRC Document Control Desk from Nebraska Public Power District dated July 5,1994," Transmittal of Cooper Nuclear Station License Event Report No.94-011" 5)

Letter (No. NLS950036) to U.S. NRC Document Control Desk from Nebraska Public Power District dated January 26,1995, " Transmittal of Cooper Nuclear Station License Event Report No.94-032" 6)

Letter (No. NLS940047) to U.S. NRC Document Control Desk from Nebraska Public Power District dated November 1,1994," Inservice Inspection Program Relief Request" 7)

Letter (No. NLS950119) to U.S. NRC Document Control Desk from Nebraska Public Power District dated June 21,1995,"Second Ten-Year Interval Inservice Inspection Relief Requests" L