ML20086H457

From kanterella
Jump to navigation Jump to search
Telecopy Ao:On 720406,standby Gas Treatment Sys Fan a Failed to Start.Thermal Overloads Changed from 41 to 44.Repeated Starts Performed for 4 H W/O Failures
ML20086H457
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/07/1972
From: Lawyer L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H450 List:
References
NUDOCS 8401170166
Download: ML20086H457 (2)


Text

_

t

)

BAE M Teleeram mestern union V

vs.,

1115P EST APR 7. 72 PB003 KA604

.I K CVA353 PD VERNON VERMONT 7 NFT US ATOMIC ENERGY COMM DIRECTOR _ DIVN OF COMPLI ANCE REGION ONE 970 BROAD ST NEWARK NJER THIS WILL CONFIRM CONVERSATION AT 1510 HOURS THIS DATE WITH R A FIEL OF REGION ONE COMPLIA' ICE REGARDING A FAILURE OF SGTS FAN A TO START. AT 1615 HOURS.WITH THE RE ACTOR SHUT DOWN AND UNDER THE CONDITION THAT NEITHER SECONDARY CONTAINMENT NOR JE STAND BY GAS TREATMENT SYSTEMS REQUIRED IN ACCORDANCE WITH TECH SPECS ON 4-6-72 A LOW WATER LEVEL SIGN AL-WAS INITI ATED BY INSTRUMENTATION PERSONNEL WHILE PERFORMING MAINTENANCE WORK

^

[

ON INSTRUMENTATION RACK 25-5 SGTS FAN A DID NOT START. FAN 58 B STARTED AND REACTOR BUILDING VENTILATION ISOLATED AS REQUIRED.

}$

1620 HOURS REACTOR BUILDING VENTILATION SYSTEM WAS RETURNEJ S$

TO NORMAL ATTEMPTS TO MANUALLY START FAN A WERE UNSUCCESSFUL.

I IN COURSE OF INVESTIGATION IMPOSED A DOWN SCALE TRIP ON REACTOR mm

~

O r\\

t

)s mesfern union kelegram '

~ EAR M

%%9 Y

l x

l

~' L

{,

BUILDING VENTILATION MONITOR SYSTEM. NEITHER SGTS FAN STARTED.

2147 THERMAL OVERLOADS IN SGTS FAN MOTORS A AND B CHANGED f

FROM 41 TO 44 REPEATED ST ARTS ON EACH F AN WERE PERFCRMED WITH NO F AILURES 0200 4-7-72 SECURED FOUR HOUR. CONTINUOUS RUN FOR

~

BOTH SGTS FANS AGAIN NO FAILURES WERE NOTED L L L AWYER VERMONT YANKEE NUCLE AR POWER CORP PO BOX 157 VERNON x

)

VERMONT s

e,/

h g

T i

f h l

\\

\\

~

b.m. mm

?

-