AO 50-271/72-06:on 720928,one Channel of Steam Line High D/P Isolation Failed to Operate at 180 Inches of Water.Caused by Broken Common Lead Between Conduit Fitting & Switch Terminal Board.Lead Repaired
ML20086H295
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 09/29/1972
From: Rosalyn Jones
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086H282 List:
References
AO-50-271-72-06, AO-50-271-72-6, VYV-2269, NUDOCS 8401160328
Download: ML20086H295 (1)


Text

, - - - - - - - - - -

(

9 9 r

VERMONT YANKEE NUCLEAR POWER CORPORATION k

[

sevcwTv anven onovc sinccT RuTomo, Vmmont' osvon WV-2269 P. o. oox is7 l vsnNoN. VERMONT 05S54 September 29, 1972 United States Atomic Energy Comission' Directorate of Regulatory Operations, Region I 970 Broad Street Newark, New Jersey 07102 '

REFERENCE:

Operating License DPR-28 Docket No. 50-271 Abnomal Occurrence No. A0-72-06 Gentlemen:

As defined by Technical Specifications for the Vermont Yankee Nuclear Power Station, Section 6.7. A.c, we are reporting the following "~

Abnortul Occurrence as A0-72-06 and confiming our teleptione conversation with your office on this date.

At approximately 10:30 a.n. on September 28, during conduct of the monthly curve 111ance on the Reactor Core Isolation Cooling (RCIC) System instrumentation, one channel of the steam line high d/p isolation failed to operate at 160 (+ 15) inches of water as required by Table 3.2.2.3 of Technical Specifications. At this timo the Reactor was operating at approximately 18% power. Inspection revealed that the common lead between the conduit fitting and the switch torninal board f or DPIS 13-84 was found to be broken.

The broken lead was it: mediately repaired and the switch was functionally tented end verified to be operable. This remedial action was completed in a.

tine span that precluded the necessity of further in:mediato action.

Very truly yours, DOh o[hghjjg VERMONT YANKEE NUCLEAR PWER CORPORATION

h. <

ftL ' Robert F. Jone -

Plant Superintendent IME/kbd