ML20086H294
| ML20086H294 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 07/12/1995 |
| From: | Pontious H COMMONWEALTH EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19325F659 | List: |
| References | |
| NUDOCS 9507180094 | |
| Download: ML20086H294 (2) | |
Text
....iinj...m._,.mi..
..4 i..
3,,,, i.,,,,
i,.. s u i,,.....,.
n..+.-
1 July 12,1995 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-000I
Subject:
Errata Sheets for WCAPs -14046 and -14047, Revision 3 Byron Nuclear Power Station, Unit i Facility Operating License NPF-37 NRC Docket No. 50-454 Braidwood Nuclear Power Station, Unit i Facility Operating License NPF-72 NRC Docket No. 50-456
Reference:
1.
Harold D. Pontious, Jr. (Comed) letter to NRC Document Control Desk, WCAP-14046, "Braidwood Unit 1 Technical Suppon for Cycle 5 Steam Generator Interim Plugging Criteria,"
Revision 3 (Proprietary), dated June 19,1995 Gentlemen:
In Reference (1), the Commonwealth Edison Company (Comed) provided the United States Nuclear Regulatoy Commission (NRC) Staff with copics of WCAP-14046, "Braidwood Unit 1 Technical Support for Cycle 5 Steam Generator Interim Plugging Criteria." Revision 3 (Proprietary) and WCAP-14047, "Braidwood Unit i Technical Suppon for Cycle 5 Steam Generator Interim Plugging Criteria," Revision 3 (Non-Proprietary). These WCAPs were prepared to compile all information previously provided in WCAPs -14046 and -14047 Revisions I and 2 into one revision for each docu ment. No new technical information was provided. These revisions were provided to ease in the retrievability of information previously submitted.
l t
L \\nt.e+ptWisimpens\\l4ther tc\\l 80([
9507180094 950712 PDR ADOCK 05000456' P
\\
t
i USNRC Document Control Desk July 12.1995 Subsequent to the issuance of WCAPs -14046 and -14047 Revision 3, the Westinghouse Electric Corporation identified a typographical error on Page 4-139.
The partial text of the title for Figure 4-61 incorrectly reads " TSP F(7H)". The correct text should read " TSP F(5H)". Enclosures (1) and (2) are the Errata Sheets for WCAPs -14046 and -14047, Revision 3, respectively, Comed and the Westinghouse Electric Corporation apologize for any inconvenience that this error may have caused.
Please address any comments or questions regarding this matter to this office.
Very truly yours,
,\\
Harold D. P ntious r.
Nuclear Licensing I, dministrator : Errata Sheet for WCAP-14046, Revision 3 (Proprietasy) : Errata Sheet for WCAP-14047, Revision 3 (Non-Proprietary)
P cc:
H. J. Miller, Regional Administrator - Rlli M. D. Lynch, Senior Project Manager - NRR R. R. Assa, Braidwood Project Manager - NRR G. F. Dick Jr., Byron Project Manager NRR S. P. Ray, Acting Senior Resident inspector - Braidwood H. Peterson, Senior Resident inspector - Byron Office of Nuclear Facility Safety.- IDNS 1