ML20086G810

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Inservice Insp Rept for June & Sept 1983.Rept Details Exam of ASME Class 1,2 & 3 Components & Piping in Accordance W/Section XI of ASME Boiler & Pressure Vessel Code.Rept Withheld
ML20086G810
Person / Time
Site: Beaver Valley
Issue date: 12/16/1983
From: Carey J
DUQUESNE LIGHT CO.
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17214A795 List:
References
NUDOCS 8401120413
Download: ML20086G810 (2)


Text

.

o

'A@

Telephone (412) 393-6000 Nuclear Division P.O. Box 4 Shippingpon, PA 15077-0004 December 16, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcment Attn : Dr. Thomas E. Murley, Regional Administrator Region I 631 Park Avenue King of Prussia, Pennsyvlania 19406

Reference:

Beaver Valley Power Statica, Unit No. 1 Docket No. 50-334, License No. DPR-66 Inservice Inspection beort Gentlemen:

Pursuant to Technical Specification 6.9.2, this letter forwards the Inservice Inspection (ISI) report on ASME Class 1, 2 and 3 components and piping examined between June and September,1983 at Beaver Valley Power Station (BVPS) Unit #1 for your review. These examinations were par t of Interval 1, Period 3 of the BVPS Unit #1 ISI inspection schedule.

The inservice inspections were perfonned in accordance with Section XI cf the ASME Boiler and Pressure Vessel Code,1974 edition through summer 1975 addenda, the BVPS Unit #1 Technical Specifications and the BVPS Unit #1 Final Safety Analysis Report (FSAR).

Subarticle IWA-6220, Reports for Class 1 and Class 2 components, of the Section XI ASME Code requires that an inservice inspection report be submitted to the enforcement and regulatory authority having juris-diction at the plant site within ninety (90) days after completion of an inservice inspection. The latest inservice inspections at BVPS Unit #1 were completed on September 18, 1983.

Submittal of the information contained in Tabs A, B and C fulfills the IWA-6220,Section XI reporting requirements. The remaining sections of the report are composed of the following:

Tab D - Examination Results Tab E - Examinations Perfomed Other Than by Westinghouse NSID Tab F - Indications Tab G - Certifications and Qualifications Tab H - Examination Procedures Tab I - Reactor Vessel Inspection Tool Jata 8401120413 831216 PDR ADOCK 05000334 0

PDR 0

5 me n-B#p SM)(oaf

  1. D6

y Power Stationo Unit No.1 Dockev No. 50-334, License No. DPR-66 Inservice Inspection Report Page E If you require any additional information or further clarification on the attached report, please contact my office.

Very truly yours, J. J. Carey Vice President, Nuclear Attachment cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation and Control Virginia Electric & Power company P. O. Box 26666 One James River Plaza Richmond, VA 23261

.