I 1

AVER AGE DAILY UNIT PGWER LEVEL DOCKET NO.

50-250 UNIT Turkey Point Unit #3 12-15-83 DATE

.. G ant COMPLETED BY.

(305) 552-3675 TELEPilONE MONTH.. November, 1983 DAY AVERAGE D I Y P WER LEVEL DAY AVER AGE DAILY POWER LEVEL

-(MWe-Net )

'~

1 g7 2

gg 3

19

~

~

4 20

~

5 33

~

6 22 7

23 8

24

~

9 25

~

10 26

-lI 37

~

12 28

~

13 39

~

14 30

~

IS 3j e

16 INSTRUCTIONS On this format.hst the aser. ige daily unit power lesel in MWe. Net for each day in the reporting inonth. Compute to the nearest whole inegawatt.

(9/77) 8401120363 831130 gDRADOCK 05000250 PDR Q'

OPERATING DATA REPORT

~

DOCKET NO. 50-250 DATE 17-15-83 COMPLETED BY N.W. Grant TELEP110NE (305) 552-3675 OPERATING STATUS

1. Unit Name:

Turkey Point Unit #3 Notes

2. Reporting Period:

November.1983 IJnit #3 reiuained out of

3. Licensed Thermal Power (MWt):

200 service for refueling and

4. Nameplate Rating (Gross MWe):

scheduled maintenance.

693

5. Design Electrical Rating (Net MWe):

700

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

666

8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Rqwrt, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

J This Month Yr o.Date Cumulative 11.' Hours In Reporting Period 7?n 8.016 96.321-6

12. Number Of Hours Reactor Was Critical 0

6,505.9 66,306.2

13. Reactor Reserve Shutdown Hours 0-0*

'844.4

14. Hours Generator On.Line 0

6.416.8 65.921.9

15. Unit Reserve Shutdown Qours 0

0 121.8_

- 16. Gross Thermal Energy Generated (MWII) 0 14.070.680 115.488.507

17. Gross Electrical Energy Generated (MWil) 0 4.584.575 43.210.565

-1,344 4,329,590 40,917,142

18. Net Electrical Energy Generated (MWH)~

0 80.0 68.4

19. Unit Service Factor
20. Unit Availability Factor 0

80.0 68.6 0

82.2 65.7

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 0 77.9 61.3 0

2.0 5.4

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

December 17. 1963

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achined INITIA L RITICAl.lTY

' INITIA L ELECTRICITY COMMERCIAL OPERATION (9/771

y-UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNIT NAM E Turkey Point Unit #3 DATE 12-15-33 November, 1983 COMPLETED BY N W Grant REPORT MONT11 TELEPilONE (305) bb2-3b/b "i

e

=

c, 2=

75'4 Licensee c%

.2 _e Cause & Corrective 8."'E c

c o

o No.

Da te g

ga j

jg5 Event u?

Action to

$E cE j5y Rcport a

<N 0 L

Prevent Recurrence C

10 831001 S

720 C

1 RC FUELXX Unit #3 removed from service for refueling and scheduled maintenance.

I 2

3 4

F Forced Reason:

Method:

Exhibit G -Instructions S Scheduled A.Lyuipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LERI File (NUREG-D Regulatory Restriction q-Other (Explain) 01611 E-Operator Training & License Examination F Adeninistrative 5

G Operational Error (F splain1 4-. y,o e a.gove,..,1 Exhibit I - Same Source t'8/U )

Il-Ot her l E xplain)

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-250 UNIT Turkey Point Unit #3 DATE December 15, 1983 COMPLETED BY N.W. Grant TELEPHONE (305).552-3675 REPORT MONTH November, 1983 Unit 3 remained out of service for refueling and scheduled maintenance.

Major safety related maintenance activities included:

Replaced diesel starting air compressor gasket Boric acid supply pump leaks were repaired Repair bent control rod drive extensions Charging pump leaks were repaired 1

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between TDL and NRC for additional information.

e M"

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-251 UNIT Turkey Point Unit #4 12-15-83 DATE rant COMPLETED liY -

-(305) 552-3675 TELEPilONE MONTil November, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe Net) 687 17 689 2

IS 686 3

686 4

686 g

23 687 22 683 7

685 426 8

24

'S 684 685 10 26 683 688 27 12 159 68 6 2s 685 13 29 34 685 30 15 31 16 INSTRUCTIONS On this formai. list the aser. ige daily unit power leselin MWe Net for och day in the reporting month. Compute to the nearest whole imgawait.

(9/77)

s, m

A 4_

OPERATING DATA REPORT DOCKET NO.

0-251 DATE

~1.' 8

COMPLETED llY N.h rLa.pt

-~

TELEPllONE finRi 662-367S OPERATING STAJtis

.f Eles '

Turkt:'t Point fjni!._#4

l. Unit Name:

Novemb 3

Unit #4 operated at essent-

2. Reporting reriod:
3. Liccused Thermal Power (MWil;. _ 2,200 ially full power except for l,

'4. Namepla'E Rating (Gross MWe):

760

'an outage as described in

~

'5. Design Electrical Reting(Net We).

693 the unit shutdowns and._ power

6. Maximum Dependable Capacil)'(Cross MWe):

700 re;luctions report.

666

7. Maximum Dependable Cap 3 city (Net MWe):
8. If Changes Occur in Capiclay Ratings (Items Number 3 Through 7) Since Last Report, bin PNsons:

t

9. Power Lesel To Which Restricted,If Any (Net MWe): (

[f.o. Reasons For Restrictions,If Any:

r s

a This Month Yr.-lu-Date Cumulatise

\\

11. Hours In Reporting Period 720

'8.016 90,049

12. Number Of Hours Reactor Was Critical 444.5_

4,046.2._

63,901.5 A,

ON 166'.6

)

13. Reactor Reserve Shutdown llours O w
14. Hours Generator On-Line 433.6

-3,838.4

~

61,734.4

15. Unit Rp:rve Shutdown }{ours 0

0 31.2

16. Gross Thermal Energy Generated (MWif) 948,337

_ E,2E 5.02 130,131,746 1

~

17. Gross Electrical Energy Generated (MWil) 308,285 s

2,621.210 41,396,722

~

291,504

]

2,478-) 28 39,203,901

~

18. Net Electrical Energy Generated (MWil),

6 0. 2 "_ _

1,_.___

47.9 68.6

19. Unit Service Factor 68.6 60.2 l'_ j 7.9
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 60 8 10 62 1

- 22. Unit Capacity Factor (Using DER Net) 58.4

~

' 44.6

62. 8_ ~
23. Unit Forced Outage Rate 39.8 12.6 4.5
24. Shutdowns Scheduled Oser Next 6 Months (Type.Date,and Duration of EachP.

f Sem==

__W^

Sy W,

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast S hin ed y

' \\_

x

_A INITI A L CRil'lCALITY

, INITIA L ELECTRICITY COMM ERCI A L OPER ATION 1

Pl/77)

+

50-251

- W':T SilUT'00WNS AND FOWER ikEDUCTIONS DOCKETNO. Turkey Point Unit #4

>i UN?T NAME e

DATE 12-15-83 REPORT MONDI November, 1983 COMPLETED BY N.W. Grant TELEPitONE (305) 552-?675

.l q

,e 5

5===3

=

ei c

License-P.,

3 _g g

Cause & Correenive g*?

-o p

k Date g

gg

.;:E g ec Event

=?

c-Aggion go

$E c"E j5j Report e ',

rN C U

Prevent Recurrence d

,19

~651112' F

286.4

.A 1

CB PUMPXX Unit removed from service to repair No 1 seal leak. Outage extended for repairs to PORV block valves. The unit then returned to power.

I l

1 2

3 4

f Forced Reason:

Method:

Exhibit G. Instructions 5 Stheduled A Lquipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refuehng 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 0161)

E-Operator Training & License Examination F Adrninistrative G-Operational Error (F splain) 4_ /.o o uove,..cl Exh: bit I Same Source t'8/77 )

ll-Ot her ( Explain)

f

SUMMARY

OF OPERATING EXPERIENCE DOCKET HO.

50-251 UNIT Turkey Point' Unit #4 DATE December 15, 1983 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH November,1983 See t!.e Unit Shutdowns and Power Re. ductions report for details on unit outages.

Major ! safety related maintenance activities included:

Main feedwater chegk valve replaced Replaced C reactor coolant pump seal assembly Replaced personnel hatch 0-ring Inspections and requirements of IB Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments to NUREG-0737 implementation are continuing.

Refer to correspondence ~ between FPL and NRC for additonal informa tion.

A

4 1

AVER AGE DAILY UNIT POWER LEVEL

~

. DOCKET NO.

50-335 UNIT St. Lucie Unit #1 c

D/.TE 12-15-83 COMPLETED BY -

N.W. Grant (305)552-36N5 TELEPilONE MONTH November, 1983 DAY.

AVER AGE DA!LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe-Net)

. (MWe-Net )

~

~

I 17

~

~

2 I8 3

19 4

20 5

21 6

22 7

23 8

24 9

~

25

~

10 26

~

~

27 II 12 28 13 29 14 30 IS 31 m

16 INSTRUCTIONS On this formai.hst the everage daily unit power lesel in MWe-Nei for cach day in the reporting m.inth. Compute to the nearest whole megawaii.

(9/77)

OPERATLNG DATA REPORT

~

50-335 DOCKET NO.

DATE 12-15-63 COMPLETED BY N W Grant TELEPHONE (305) 552-3675 OPERATING STATUS

1. Unit Name:

St. Lucie Unit #1 Notes

2. Reporting Period:

November, 1983' Unit #1 remained out of-

3. Licensed Thermal Power (MWt):

2,700 service for refueling and 890 scheduled ~ maintenance.

4. Nameplate Rating (Gross MWe):

830

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

867

~ 7. Maximum Dependable Capacity (Net MWe):

822

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumulative 11; Hours in Reporting Period 720 8,016 60,864

12. Number Of Hours Reactor Was Critical 0

1,366.9 44,466.1 0

0' 205.3

13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 0

1,350.9 43,576.2

15. Unit Reserve Shutdown Hours 0

0 39.3

16. Gross Thermal Energy Generated (MWII) 0 3,352,422 108,667,938
17. Gross Electrical Energy Generated (MWil) 0 1:160 7R0 35 373 875

-2,896 1,073,120 33,337,311

18. Net Electrical Energy Generated (MWH)'

0 16.9 71.6

19. Unit Service Factor 0

16.9 71.7

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 0 16.3 69.5
22. Unit Capacity Factor (Using DER Net) 0 16.1 67.7
23. Unit Forced Outage Rate 0

1.1 4.6

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
25. lf Shut Down At End Of Report Period. Estimated Date of Startup:

Spring 1984

26. Units in Test Status (Prior o Commercial Operation):

Forecast Achined INITIAL CRITICALITY

' INITIA L ELECTRICITY COMMERCIAL OPERATION 01/771

s,

,;e UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-335 UNIT NAME St. Lucie Unit 1 DATE 12-15-83 REPORT MONT11 November, 1933 COMPLETED BY NW Crant TELEPilONE (305) 552-36/6

~

e*

c.

3=

.=I _g 8

7.c j Licensec e%

g.

Cause & Corrective o

N".

Date i

e; 4

.2 s a:

Event

??

o3 Action to

$5 E

jd Report =

80 L

H Prevent Recurrence c

3 830226 S

720 C

4 RC FUELXX Unit #1 remained out of service for refueling and scheduled maintenance.

I 2

3 4

F Forced Reason:

Method:

Exhibit G -Instructions S. Scheduled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refuelmg 3 Automatic Scram.

Event ReporI(LER) File (NUREG-D Regulatory Restriction q-Other (Explain) 0161) li Operator Training & License Examination F Administrative Y ~ 0 * *' " ""

5 G-Operational lir ror ( F xplain)

,v Aoao eLro v<.,.. r>

E xhibit I - Same Source t'8/77 )

Il-Olher ( Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-335 UNIT St. Lucie Un'it 1 DATE December 15, 1983 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH November, 1983 St. Lucie Unit I remained out of service-for a refueling and maintenance outage.

~ Major safety related maintenance included:

A heat tracing circuit was repaired Inspections and requirements of IE Bulletin and NUREG-0737 are continuing.

. Florida Power &. Light Company commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additonal information.

In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORY or safety valves during the repart month.

~

See correspondence between FPL and NRC for information concerning the thermal shield.

e o

AVER AGE DAILY UNIT POWER LEVEL 50-389 DOCKET NO, St. Lucie Unit #2 P

UNIT DATE 12-15-83 COMPLETED BY ' N.W. Grant TELEPilONE (305) 552-3675 MONTH November. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

~

(MWe Net)

-(MWe Net) 760 812 37 2

812 3

812 3

812 813 39 811 810 4

20 810 809 3

810 739 6

g 806 807 7

23 8

811 793-24 810 812 9

25 812 811 go 26 11 812 812 27 12 812 798 28 13 '

812 OU 29 806 810 34 30 810 15 33 810 INSTRUCTIONS On this formai. list the average daily unit power leselin MWe Nei for each day in the reporting inonth. Compute to the nearest whole megawait.

(9/77) y w

r g

y

Y OPERATING STATUS

~

2 l. Unit Name.

St. Lucie Unit #2 N"1" 2

2. Reporting Period.

N.pvem btrm l983 Unit #2 operated at

3. Licenwd lhennal Power (MWf) 2>560
4. Nameplate Rating (Gross MWe):

"50 ossentially full power.

5. Design Electrical Rating (Net MWe) 804

~

6. Maximum Dependable Capacity (Gross MWe).

832

7. Maximum Dependable Capacity (Net MWe).

786

~

8. If Changes Occur in Capacity Ratings (items Number 31hvough 7) Since l2st Report Gise Reason c

?

'~

~

9. Power Lesel To Which Restricted, if Any (Net MWe). _.

a

10. Reasons For Restrictions If Any:. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3_

e

~I his Month Yr -to Date *

< o m ul.i t n e

'+

11. Hours in Reporting Period
12. Nurnber Of Hours Reactor Was Critical 720 2 761 2,761 1

720 2,483 2,483

13. Reactor Resene Shutdown Hours 0

0 0

~

14. Hours Generator On-Line 720

~~~

5~,3f63 ~~'

~~2, 3FI5. 4 J.

m

~

^

' ^

15. Unit Resene Shutdown Hour 0

0 0

M'-

16. Gross l'hermal Energy Generated (MWil) 1 4 11,226 5,_781 l44 5,781,144 17 Gross Electrical Enerm Generated (Mulo i

.i - { e

18. Net Electrical Energ.y Generated (MWH)

_ _ _ 612,330 1, 914,640 191.46_40 7

579,887 1,802,339 1,802,39 m

1 1

?,N,C,.

19. Unit Senice Factor 100.0 86.4 TM. 4 m

., ' Q :

20. IJnit Asailability I actor 100.0 86.4 86.4 o

5

. '.:. 9.-,#.'

21. Unit Capacity Fat for (Using M Dc Net) 102.5 B3.1 H2.9 3_

i g~. Q-22 Unit Ca; aciry I' actor (Usmg DI R Net) 100.2 81.2 99.5

~

5.

.~

23 Unit Forced Ontane R. te

~

Shutdowns Scheduled Os er Nest 6 Months (1

-- _ _ __ 0 13.6 13.6 L

f f y.,,

24 3 pc. D.ste. and Duration of I ach )

.j.1 *I 7

]

].

~

.y

~ '(NN.v 25 IfShutDown u rnd Of Repon pe,,od.1.ininned D.ne of start uii kwj' Y

.}9 IT Umts in i est Stains iPrno to ( oinmert ial ()per.u nen i q

.6 O'-yg}q,gt igk

q. (d.*e r

a F m.cw

~

4,g,g

,o

n. :p 4 S (i%.*.d k g-

.g,

e

~

INIII A L CRII f(' AI il y s+

s

'^

INillAL I-Li-( I nicII Y

,, - k.

A C-N COMMI RCl \\ L OPI R A IION WN,.,.I '

S I

2!

?ggM '..,

,i

= ' ~ ' " ' _ $h h

'l

  • These columns contain data from date of commercial operation only.

l.

OPERATING DATA REPORT DOCKET NO.

50-389 DATE 12/15/83 COMPLETED BY N_W. Grant TELEPliONE (305) 552-3675 OPERATING STATUS

1. Unit Name:

St. Lucie Unit #2 Notes

2. Reporting Period:

November. 1983

3. Licensed Thermal Power (MWt):

2,560 Unit #2 operated at 850 essentially full power.

4. Nameplate Rating (Gross MWe):

804

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

832

7. Maximum Dependable Capacity (Net MWe):

786

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions,If Any:

Cumulative

  • This Month Yr to.Date 11.* Hours in Reporting Period 720 2,761 2,761
12. Number Of Hours Reactor Was Critical 720 2,483 2,483
13. Reactor Reserve Shutdown Hours 0

0' 0

14. Hours Generator On-Line 720 2,386.4 2,386.4
15. Unit Reserve Shutdown Hca.rs 0

0 0

16. Gmss Thermal Energy Generated (MWii) 1.833.226 5.781.144 5.781.144
17. Gross Electrical Energy Generated (MWii) 612.330, _,

1.914,640 1,914,640 579,887 1,802,339

'1,802,339

18. Net Electrical Energy Generated (MWH),

100.0 86.4 86.4

19. Unit Service Factor
20. Unit Availability Factor 100.0 86.4 86.4
21. Unit Capacity Factor (Using MDC Net) 102.5 83.1 82.9
22. Unit Capacity Factor (Using DER Net) 100.2 81.2 99.5
23. Unit Forced Outage Rate 0

13.6 13.6

24. Shutdowns Scheduled Oser Next 6 Months (Type.Date.and Duration of Eacht:
25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Tes' Status (Prior to Commercial Operation):

Forecast Achined INI flA L CRITICALITY

' INITIA L ELECTRICITY COMMERCIAL OPER ATION

  • These columns contain data from date of commercial operation only.

g

n m=-.

y e

,y, UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-389 UNIT NAME St._Lucie Unit #2 DATE 12-15-83 REPORT MONT11 November, 1983 COMPLETED BY N hl - Gra nt TELEPHONE (305) 552-3675 "i

. 5:

e*

=_

.2 e s

,.s ~4 Licensee ev Cause & Corrective c

-o o

o L.

Date g

g j

,g g 5 Event a?

83 Action to

$E E

j 15 l Report tN0 L

Prevent Recurrence 6

,11 831122 S

11.9 A

1 HC HTEXCH Unit removed from service for condenser 2B2 and 2A1 ' cleaning.

t 2

3 4

F Fitreed Reason:

Metho1:

Exhibit G Instructions S. Scheduled A Lyuipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 9 Other (Explain) 0161) li-Operator Training & License Examination F Administrative p

5 G Operational lirror (F splain) 4

/.o ao axovc.i..d Exhibit I-Same Source 19/77) 11-Other I Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-389 UNIT St. Lucie Un'it #2 DATE December 15, 1983 COMPLETED BY N.W. Grant TELEPHONE (305) 552-3675 REPORT MONTH November, 1983 See the Unit Shutdowns and Power Reductions report for details on unit outages.

Major safety related maintenance inc.luded:

C & D batteries were cleaned HPSI pump leaks were repaired Charging pumps leaks were repaired Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company Commitments for NUREG-0737 implementation are continuing.

Refer to correspondence between FPL and NRC for additional information.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report month.

E-

,.n-r p.

FLORIDA POWER & LIGHT COMPANY December 15, 1983 PNS-LI-83-739

&,b'OY c

6HIS wk c

(

Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Attached are the November 1983 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.

Very truly yours,

/

~

J. W. Williams, LJr.

Vice President Nuclear Energy Departn' ~t JWW/NWG/djc Attachment cc:

J.P. O'Reilly, Region II 9

r%

y

\\

Pt opt c.. SERVING PEOPLE

.