ML20086G616
| ML20086G616 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/23/1983 |
| From: | Herbert R, Mroczka E NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| MP-5634, RO-50-336-83-31, NUDOCS 8401120312 | |
| Download: ML20086G616 (1) | |
Text
General Offices
- Selden Street, Berlin. Connecticut i, cowcece s.c, a o nom co.a,,
P.O. BOX 270 ms's=. =ssacmstm atecmc cow =
HARTFORD. CONNECTICUT 06141-0270
.avo.a. rea soma ce***
(203) 666-6911 ontwasr evws seacca cewa-sconf1a37.suCLEna E.eFauf Conspast, December 23, 1983 Dr. Thomas E.
Murley MP-5634 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Reference:
Facility Operating License DPR-65 Docket No. 50-336 Reportable Occurrence RO-50-336/83-31
Dear Dr. Murley:
This letter provides notification of Reportable Occurrence 83-31 pursuant to the requirements of Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.8.i.
This report concerns the discovery, during Service Water system modifications, of conditions not specifically considered in the Safety Analysis Report or Technical Specifications that may require remedial action or corrective measures to prevent the existence or development of an unsafe condition.
While performing a seismic analysis on the Service Water System for the addition of flanges, it was discovered thut heavy versus standard wall pipe was installed.
An evaluation of this condition was made and it was determined that all pipe stresses were within satisfactory limits, however, hanger loading analyses showed five hangers to be undersized based on present requirements.
Two hangers had undersized snubbers due to the heavier pipe and three hangers had a safety factor of less than 4 but greater than 2.
Further information will be provided, if available, in the 14 day report.
Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY FOR:
E.
J.
Mroczka Station Superintendent Millstone Nuclear Power Station 84011203.' 831223 15000 lY:
R.
J.
Herbert gDRADOCF Station Services Superintendent Millstone Nuclear Power Station EJM/TP:ejl cc:
Director, Office of Management Information and Program Control, Washington D.C.
(3)
U.S.
Nuclear Regulatory Commission, c/o Document Management
/g Branch, Washington, D.C.
20555.
g