Monthly Operating Repts for Nov 1983
ML20086G580
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/30/1983
From: Jones V, Saunders R, Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
713, NUDOCS 8401120291
Download: ML20086G580 (40)


Text

__-___. __-__ - _ _ _ - _ - _ _ _ - - - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __.

' i 0

e .a d

VIRGDUA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT

~

REPORT NO. n_g_i i iPPROvEo ,1. / N 4 ,.. s e .

STATION MANAGER l

8401120291 831339 gDRADOCK 05000280 PDR

m. . .. .

. .' 3 11ection Page Operating Data Report - Unit #1 Operating Data Report-Unit #2 2 Unit Shutdowns and power Reductions - Unit il 3 Unit Shutdowns and Power Reductions - Unit #2 4 Load Reductions Due to Environmental Restrictions - Unit #1 5 Load Reductions Due to Environmental Restrictions - Unit i2 6 Average DaDy Unit Power Level- Unit il 7 5 g Average DaDy Unit Power Level- Unit i2 Summary c4 Operating Experience 9-10 Amendments to Facility License or Technical Specifications 11  %

Pacility Changes Requiring NRC Approval 12 Facility Changes 1 hat Did Not Require NRC Approval 12 Tests and Experiments Requiring NRC Approval 13 e Tests and Experiments 1 hat Did Not Require NRC Approval 13 Other Changes, Tests and Experiments 14 Chemistry Report ,

15 Description of AH Instances Where 1hermal Di.;d-p Limits Were Exceeded 16 Fuel Handling 17-1g Procedure Revisions 1 hat Changed the Operating Mode 19 Described in the FSAR Description of Periodic Tests Which Were Not Completed Within the Time Limits Specified in Technical Specifications 20 s

. 11 1

Page

, ,8ection Maintenance of Safety Related Systems During Outage or 22 Reduced Power Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or 24 -

Reduced Power Periods - Unit # 2 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance 26 Maintenance of Safety Related Systems Durmg Outage or Reduced Power Periods - Unit # 2 - Electrical Maintenance 28 Maintenance of Safety Related Systems Durmg Outage or Reduced Power Periods - Unit #1 -Instrument Maintenance 30 Maintenance of Safety Related Systems Durmg Outage or Reduced Power Periods - Unit i2 -Instrument Maintenante ,

32 Health Physics Summary 33 Procedure Deviations reviewed by Station Nuclear Safety and 34 Operatfag Committee after Time Limits Specified in T.S.

s - ' OPERATING DATA REPORT DOCKET NO. 50-280

. . DATE 06 DEC 83 CO/!PLETED BY Vivian Jones TELEPHONE 804-357-3184 NEE 2$ EE_DE 1e UNIT NAME SURRY UNIT 1  :

2e REPORTING PERIOD 110183 TO 113083

3. LICENSED THER>fAL POWER (mkt) 2441 l~~~~~~~~~~~~~~l 4e RAMEPLATE RATING (GROSS MVE) 847.5 l NOTES l 5e DESIGN ELECTRICAL MTING (NET NVE) 788 Go M.4XIIRIM DEPENDABLE CAPACITY (GROSS MWE) 811
7. KAXI!!UH DEPENDABLE CAPACIT! (NET MVE) 775

?. IF CHANGES OCCUR IV CAPACIT! RATINGS N/A (ITE!!S 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS

9. POWER LEVEL % VRICH RESTRICTED, IF ANY N/A ,

(NET MVE)

10. REASONS FOR RESTRICTIONS, IF ANY N/A THIS MONTH XR-TO-DATE CUNULATIVE
11. HOURS IN REPORTING PERIOD 720.0 8016.0 95904.0 12e NUMBER OF HOURS REACNR WAS CRITICAL 708.8 4580.1 58491.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3765.2
14. HOURS GENERA %R ON-LINE 102.0 4431.1 57285.8
15. UNIT RESERVE SHUTDOVN HOURS 0.0 0.0 3736.2
16. GROSS THER*fAL ENERGY GENERATED (MWH) 1677825.5 10340108.7 133020708.6
17. GROSS ELECTRICAL ENERGY GENERATED (Mk7i) 541950.0 3282070.0 42888113.0
18. NET ELECTRICAL ENERGY GENERATED (MWH) 515101.0 3108061.0 40668524.0
19. UNIT SERVICE FACTOR 97.5 ele 55.3 ele 59.7 e/*
20. UNIT AVAILABILITY FAC%R 97.5 e/* 55.3 =/* 63.6 e/*
21. UNIT CAPACIT! FACMR (USI% MDC NET) 92.3 */o 50.0 ele 54.7 e/o
22. UNIT CAPACIT! FACTOR (USING DER RET) 90.8 ele 49.2 e/* 53.8 e/*
23. UNIT FORCED OUTAGE RATE 2.5 ele 1. 4 e /* 21.6 e/*
24. SHUTDOVNS SCHECULED OVER NEXT 6 NONTHS WINTER MAINTENANCE 02-24 10 DA (TYPE,DATE 1ND DURATION OF EACH)
25. IF SHUT D0k7,' AT END OF REPORT PERIOD, ESTIMATE DATE OF STARTUP
26. UNITS IN TEST STATUS FORECAST ACHIEVED (PRIOR % COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9

1

I

= OPERATING DATA REPORT

.s

  • DOGE 7 NO. 50-281 DATE Ok C':C 83 CaiPLETED B1 Vivian Jones TELEPHONE 804-357-3184 SE[IS $[A25
1. UNIT NNIE SURRY UNIT 2 -

2e REPORTING PERIOD 110183 TO 113083 3* LICENSED THEMIM POWER (MWT) 2441 l "~ ~ ~~ ~~~ ~~~ l 847.5 l NOTES l

4. NAMEPLATE RATING (GROSS MVE)
5. DESIGN EE,ECTRICAL RATING (NET NVE) 188
6. MAXII.V! DEPENDABLE CAPACITY (GROSS MhT) 811
1. MAXIMUI.' DEPENDABLE CAPACITY (NET WT) 775
8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITE'IS 3 TiiROUGH 7 ) SINCE LAST REPo r , GIVE REASOVS
9. P0kTR LEVEL TO V9ICH RESTRICTED, IF ANY N/A (NET IST)  !
10. REASORS FOR RESTRICTIONS, IF ANY N/A THIS MONTH XB-TO-DATE CW!ULATIVE 720.0 8036.0 92784.0
11. ROURS IN REPORTING PERIOD 5614,.6 58289.1
12. NUMBER OF BOURS REACTOR WAS CRITICE 118.2 0.0 U.0 0.0
13. REAC%R RESERVE SRUTDOWN HOURS 57322.7 715.2 5478.6
14. BOURS GENERATOR ON-LINE 0.0 0.0 0.0
15. UNIT RESERVE SBUTD0k71 HOURS
16. GROSS THEMIAL ENERGY GENERATED (MVH) 1621527.7 12904572.9 134145919.0
17. GROSS ELECTRICAL ENERGY GENERATED (b5"l) 524630.0 4127740.0 43610459.0 496730.0 3911568.0 41332489.0
18. NET ELECTRICAL ENERGY GENERATED (.%71) 61. 8 * /*
19. UNIT SERVICE FACTOR 99.5 */* 68.3 */o 99.5 e/* 68.3 e /* 61.8 */*
20. UNIT AVAILABILITY FACTOR 57.5 * /*
21. UNIT CAPACIT! FACTOR (USING MDC NET) 89.0 e/o 63.0 */*

87.6 */* 61.9 */* 56.5 */*

22. UNIT CAPACITX FACNR (USING DER NET) 14.3 e/*
0. 5 e /* 2.2 e /*
23. UNIT FORCED OUTAGE RATE
24. SRUTDOWNS SCREDULED OVER NEXT 6 NORTRS SPRING MAINTENANCE 16 10 D (TTPE,DATE,AND DURATION OF EACH)
25. IT SRUT D0k"I AT EN!) 0F REPORT PERIOD, ESTI:! ATE DATE OF STARTUP FORECAST ACHIEVED
26. UNITS IN TEST STATUS (PRIOR % CatfERCIM OPERATION)

INITIM CRITICALITT INITIM ELECTRICITY CONMERCIM OPERATION 2

)I

~

3 .

1 _

1 s G.

~ I'. e

.n I

R P

EoJ "A I N

r a

~

m" e e I

h L

I 7

7 am e o s s si el e

0 I 4 'ts me nF t y a n m r . e 8 a .

f hse)c mo T a e c D i. R t

2 r c l r S

,. 0 pa iv X rn s f l.E.

e o wf e 5 3nvE e. .ec e i i al t

smI( t m

, l t

c s

e pnnk nht t a

s

.EEyE e n =e t t ei I. ee S.

O s rar a ep NM1nNA A O e

o I

n. c odn t

Cshe e pS R I

e T Np)at gl C.e t t

i e 1 l

b n n ora i

be yt A t, R i

E K IT *Tr drr n1e6 l t i e

E E. =An w i

e n u nv1 t

s CN UfI Ll PE =

=

e v

e ow d doP EfEE0 F l' 1 e C r tbI s

il I

4 5 M hee s nh sa a o t wint

' , tkR i

naS UleM  %

S n e

N .

m )n e

0 mei

. t 3 eSl a cp i

C U

D r

e k1[  : llea e

cl m 5esE E b l a

n ae uw m nnt oe(s R m i mt h R e e, > teM- M- A- )4 E

f M

v o gut s

v M17J4 N

N ) 9 3

t 1 N 1 N -

A

$t O e #

M et s sl "

f W T neew e,p m O R f.rEe ht l

) O t R e

  • i P n i E i N

R e m

S n T t~

O )

3{j6j n e )

g s n n M

  • I l

i a

p m J e

c i

l a

p E mI m

(t l oA E e es l g c (

e 4g A .

/- .

l li mT e i

s i n w s i on e n evl'e sm l

r e Reie tl

. t c yT s a i,.

J. nn goe es e e m s.

E 0 t

!.p3 o 8 s  :

mnnt pt el el at i

ni ni ms oil s ir i

minuvif ue gc me, s e 1

. 1 i i ia s e e pd p ,

s e r M R. R O. A O o -

RA9CDEFGi nD I F i

2 3

8

t. 2 n 2

- l d

e 1 la u 1 ed ce rh e

ic 0 FS ,

2  ::

e.

3

- r3 m, N 8 l e 11 l llll ll l fIf'f , L

e IN)CRETNO. _50281 .

(fNIT SIMjilN)WNS AND FOtfER RNDtDIONS IfMIT NAME Surry H ellATE _ December G_.len3 C M .ETEspey Vivian II. Jones.

REPORT MONytt November 1ELErf90NE Ext.477

L .

~

.I j

" l.icensee {*, Osww A Cuentive Acthin se Nu. . Date K g, 3yse Event - p

.. o e,eee,,i n . .e,we os ner. .

A py j 1

A 3 Reactor trip caused by a spike from 83-22 11-16-83 F 3.8 Channel 111 GTAT while testing in Channel

11. Module was found defective in Channel 111 and was replaced.

0.0 Reactor power was reduced to 62% for 83-23 11-19-83 S ,11 1 load follow and to repair leak on

> 2-F W-P-Ill.

l . /

l D.0 A Reactor power was reduced to 67% to 83-24 11-23-83 F 1 repair 2-FW-P-18, has high vibrations.

0.0 i 1 Reactor power was reduced to 40% -

83-25 11-29-83 S 11 1 load follow

.1 4

I 2 Method: Eskilett G . inesencil.ms l F: Fmced Ressim: 1 Mensel Im reepsesehm uf psis 5: Sclwdwled A Ergelpmeni reifuse(Enrista) 2-Msand Scism.

Entry Sheces tw l.leensee R.Melnienance or Test Event Repost (Lf!RI file INURIG.

.1 Auliemsele Sessen.

j C. Refueling 4-thher (Espieln) 0161)

D Reguistusy Restelellem .

l E.Opessent T:sining A Ucense Eneminnehm

' 5 F.Ailminhiestive Exhible 8.Ssaw Souvce I C Opensilimal term (Esplein}

Il-Othes lE spleini I'l/77) .

i l _

. . LOAD REDUCTIONS DUE TO EhTIRONMIXTAL RESTRICTIONS UNIT NO.1 MONTE: November LOAD MW REDUCTIONS, NW MWH REASON InTE, TIME HOURS NC NE DURING THIS REPORTING P3RIOD e

', MONTHLY TOTAL 5 .

. . LOA.D REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS I t! NIT M. 2 MONTE: Nov errte I

g, TIME BOURS- LOAD. W REDUCTIONS W WE REASON NC NE DURING THIS REPORTING P:ERIOD 0

Y

' O.

e 4

  • W e

4 e

5 e

e

', MONTHLY TOTAL 6 _ _ _ _ _ _ - - _ _ - _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

DOCKET NO 50-280 UNIT SURRY I DATE 12-1-83

. . COMPLETED BY Vivian H. Jones AVERAGE DAILY UNIT POWER LEVEL MONTHS NOV.XBER 83 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POVER EVEL DAY (MWE-NET) DAY (MWE-SET) 1 745.6 16 749.3 2 745.8 17 750.2 3 744.2 18 750,3 4 746.9 19 740.1 5 744.3 20 5 749.5 6 745.4 21 749.6 7 747.9 22 106.0 8 747.4 23 450.0 9 747.9 24 744.0 10 - 748.4 25 743.6 11 748.3 26 744.7 12 748.2 27 740.8 13 749.5 28 742.5 14 748.0 29 742.1 15 750.2 30 742.7 DAILY UNIT POWER LEVEL FOMI INSTRUCTIONS ON THIS FOMf, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE-NET MR EACH DAY IN THE REPORTING MONTH. THESE FIGURES WILL BE USED N PLOT A CRAPR FOR EACH REPORT-ING MNTH. NOTE THAT BI USIM MAXIMUM MPENDABLE CAPACITY FOR THE NET ELEC'IRICAL RATING OF THE UNIT. TRERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER EXCEEDS. .

THE 100 */* LINE (CR THE RESTRICTED POWER LEVEL LINE). IN SUCR CASES, THE AVERAGE DAILY UNIT POWER CUTPUT SHEET SHOULD BE 700IMOTED TO EXPLAIN THE APPARENT ANOMALY.

7

. DOCKET NO 50-281 UNIT SURRY II DATE 12-1-83 COMPLETED BY -Vivian H. Jones AVERACE DAILY UNIT POWER LEVEL MONTHS NOVDfBER 83 AVERAGE DAILY POVER LEVEL AVERAGE DAILY POVER LEVEL DAI (MVE-NET) DAY (MWE-NET) 1 748.0 16 529.0 2 748.0 17 742.8 3 748.2 18 744.3 4 745.9 19 720.1 .

746.2 20 0 677.2 5

6 746.8 21 741.6 7 741.0 22 740.2 8 742.3 23 602.5 9 744.0 24 464.6 10 -

743.8 25 444.2 11 744.8 26 479.6 12 746.0 27 469.5 13 746.2 28 682.3 14 745.7 29 737.9 15 746.8 30 738.1 DAILY UNIT POWER LEVEL FOMI INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILY UNIT POWER LEVEL IN MWE-NET FOR EACH DAY IN THE REPORTING NONTH. THESE FIGURES WILL BE USED TO PLOT A GRAPH FOR EACH REPORT- -

IRC NORTH. NOTE THAT BY USING MAXIMUM DEPENDABLE CAPACITI POR THE NET ELECTRICAL RATING OF THE UNIT THERE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POVER EXCEEDS .

THE 100 */* LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILY UNIT POWER OUTPUT SHEET SHOULD BE FOOTROTED TO EXPLAIN THE APPARENT ANOMALY.

8 - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SUMMARY

OF OPERA'!TNG EXPERIENCE November 1983 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents. .

UNIT ONE 11-01-83 0000 This reporting period begins with the unit at 100% power 11-22-83 0153 Commenced load reduction due to steam leak on drain line from "A" MSR to HP drain tank.

0359 Generator off the line 0447 Rx trip from N-31 source range while shutting down reactor.

1858 Rx critical  ;

2157 Generator on the line, increasing power at 3%/hr.

11-24-83 0015 Unit at 100% power 11-30-83 2400 This reporting period ends with the unit at 100% power.

UNIT TWO .

11-01-83 0000 This reporting period begins with the unit at 100% power.

11-16-83 0940 Reactor trip caused by OTAT spike from channel III while testing in channelII.

1128 Reactor critical 1330 Generator on the line, increasing power at 150MW/hr.

2315 Unit at 100% power 11-19-83 2110 Commenced power decrease to load follow and to repair leak on 2-FW-P-1B.

2244 Holding power at 62%,520 MW's.

11-20-83 0355 Commenced power increase to full power 0750 Unit at 100% power 11-23-83 1030 Commenced power decrease to remove 2-FW-P-1B from service due to high vibrations 1113 Holding power at 67%,530 MW's.

11-25-83 0000 Commenced power decrease to load follow 9

UNIT TWO (cont.)

11-25-83 0150 Holding power at 40%,300 MW's 0440 Commenced power increase 0545 Holding power at 67%,520 MW's  :

11-28-83 0125 Commenced power increase, 2-FW-P-1B is returned to service.

0154 Holding power for system operator at 71%,560 MW's 0411 Commenced power increase 0700 Unit at 100% power

+

l l

e 10

l AMENDMEN15 TO FACILITY IJCENSE OR TECHNICAL SPECIFICA'110hS The Nuclear Regulatory Commission issued, on September 22, 1983, Amendment Nos.

90 and 89 to the Operating License for Surry Power Station, Units 1 and 2 respectively.

The change was submitted to the NRC under Change Request No.130 and is now designated for issuance as Technical Specification Change No.102.  :

The change revised the fractional power limit to a 0.3 multiplier instead of a 0.2 multiplier for Units 1 and 2. The change also restores the rod insertion limits to pre-cycle 7 valves for Unit 1.

i l

i l

i 4

e 11

4 e

e FACILITY CHANGES REQUIRING NRC APPROVAL NONE DURING THIS REPORTING PERIOD .

6 e

FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD d

I I

l l

\

l

e g' e 4 l

l TES13 AND EXPERIMENTS REQUIRING

  • NRC APPROVAL NONE DURING THIS REPORTING PERIOD TESTS AND EXPERIMEN'IS THAT DID NOT REQUIRE NRC APPROVAL NONE DURING THIS REPORTING PERIOD l

l i

I e

13

1 -- - - _ma w+_ , .- --a,s- a,.-- ---- a e G e

e 6

4

  • OTHER CHANGES. M AND EXPERIMENTS NONE DURING THIS REPORTING PERIOD 9

F e

a 0

4 14

. . . _ - _ _ _ _. . -_ ____ _ - . . - . _ . .._. _- ... -___.__ _ _ - - _ . . _ _._..__ ___-___ _ ____ ._ __ _ _ - _ ~ .__ _

~

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION CHEMISTRY REPORT November 19 83 T.S. 6.6.3.d PRI N COO N UNIT NO. 1 UNIT NO. 2 ANALYSIS MAXIMUM MINIMUM AVERAGE MAXIMUM MINIMUM AVf. RAGE O ~1 ~ ~ ~ ~

Gross Radioact., uCi/ml 2.05E 5.05E 9.17E 1.79E 6.39E 1.13E Suspened Solids, ppm 0.0 0.0 0.0 0.0 0.0 0.0

~ ~ ~ ~

~

Gross Tritium, uCi/ml 1.87E 1.19E 1.52E" : 1.86E 1.02E 1.57E 131 2.01E O 2.66E ~2 2.57E -1 6.81E

~4 3.54E -5 1.35E ~4 Iodine , uCi/ml I13 /II33 1.25 .35 .84 .17 .06 .11 (A) .

Pvdrogen, cc/kg 40.0 25.6 29.4 51.0 28.1 37.2 Lithium, ppm 1.30 .94 1.13 1.75 1.37 1.57 Boron-10, ppm

  • 133 98 107 184 155 161 Oxygen, ( D . O . ) , ppm <0.005 40.005 40.005 40.005 4 0.005 40.005 Chloride, pom 4 0.02 40.02 40.02 40.02 4 0.02 <0.02 6.77 6.65 6.71 6.67 6.51 6.57 pH 9 25'C 0 Boron-10 = Total Boron x 0.196 NON-RADIOACTIVE CHEMICAL (C)

RELEASES, POUNDS T.S. 4.13.A.6 Phosphate - Boron. 737 Sulfate - Chromate 0.0 50% NaOH - Chlorine 0.0 REMARKS: (A). Operations notified; Chemistry recommended decrease in VCT pressure. (B). Lithium additions made to Unit 1: 160 ans.11/1; 600ams.11/22; 260 7 11/23; 300 gns.11/24; 230 gas.11/28. AMit N to Unit 2: 240 gns.11/1; 400 gns.

4

.11/16; 325 gns.11/24. Cation Bed placad in service en Unit 1 for Lithium removal: 11/7, 11/11, 11/16, and 11/30. Lithiun renoval Unit 2: 11/3, 11/7, 11/11, 11/16, 31/18, 11/23, and 11/30. (C). 'Ihe levels of these ch=4e=1s should produce no adverse enviuuwental impact.

15

^

h g S

1 ;q w; 4

u

.. ~
j '

DESCRIPTIGH OF ALLINSTANCES WHERE

. THERMAL D1BCHARGE LIMiin WERE EXCMED

~

. G ,

t. --

.x et ..

-r 1: 'i _ \'~/ .NONE DURING tills REPORTING PERIOD '

a,,?,s g '.

4 or l  %,,-

2 f' yp_ ; ,

h i

T

- -r 3 ') '*i .

' I ~t v3 If

-(,.' g' i s

^fi .

}

Nu.

9 4

?

1

)

k  ?

.s q

'P g

N

- ,3

'~> 1 l } . \

i  % *

,y -y

.+ -

e f

r.?

,/[' N Y' 16 -

f -- _ _ - . _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ . _ - _ _ _ _ _ _ - - _ _ _ _ _ - _ _ _ _ _ _ _ __ __

r 7"Il EANDLINO ..

(UNIT D November,1983 go, oy ANSI No. hTw' 0F, E?DC :Ls_

3.., ,

SE!??IDh.ICI!VID ASSnsi.;IS PIF SEIPXINT IN!!!A1. rg,1CEgn ; i SEI??!KO CASE ACT!VI~T LIVI g

. e

_r.

A i

None during tnis reporting period. l 3

e y

( e l -1 Ps f

r a r-

, m'-

l .

I s

n l

I M.

C'

]__

'T di

. 41 2

pt ,

_7 it -

f4L p-,

5 w

1.-

K-_

]

s m.

l l 17 i

7"El EANDLII:0 (UNIT II)

November,1983 DATI EO 07 A1:SI No. , hv OR S?D J : La SEI??ID/EECIn*ID ASS N 1;IS PIE SE!?l2KT IK!!IX DEICEMD'T i SEI??ING CASK ACT3'IU L7 I None during this eporting period.

  • 1 G

t "M

j h

\ 18

i e

PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR NONE DURING THIS REPORTING PERIOD 9

4 e

DESCRIPTION OF PERIODIC TES'IE WHICH WERE NOT

- . COMPLETED WrrmN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS d

M M

S4 e NONE DURING THIS REPORTING PERIOD.

Y er e

e, k

20

+maFW4W-h

%w 4

  • O MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO.1 MECHANICAL MAINTENANCE e

e

- __ __________________21______

--m- - - - - . . , , _ _ _ _ . ,

g S

  • 6 e

d 4

One a

!=

^

k

- E-

^e.:::~ "

9 E

E* g a k

E "5 g n .k

=

E '

t- E Ec 4

?

Ei e

u

p. . t E

B E t =

t  ! s h, E. E

=

E It a a

j E O k

i= e

    • E ltt .,

t

=

hapuu suam ii iisim ie i--an mi -

wO & WQ e O

O t e O G MADTTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 MECHANICAL MAINTENANCE 3

O 4

4

1l!l

' ) s

- = ' - . ' ,

4 k

e M 1%0n M l121 7211 00t 1

% nn?1 71nn M 1 1%$

C t 1n0 A 3333 P

f 3

3 s

3 3

R s

t

't o

y tK AA t R FF f g 1. L p

1

, r g MM ti E

V T r rcVA t T T.

A D w r A A 1, V I PP4 R 0 VD F r DD E.

c r FTT[ E 6,T T.

st l R SSAA

t. Y

! lTT f

R l K

V A

D AATE NSSRR R

O E

  • C A

T N

I M

I 1 R

I s M ET I

CIN WVE T, L FJL AA T VV S

1 S NM IE D TT E WRSS T AAEl A EEtl L LLEE E

R T

T R

A MMRC ffAA CC t

T F  ? i l iLL fPr F W t A A E f:

A S PPRR S

r O

E RA 1 1

'nt 00 a 111O n 0 - - 5G M

i T

n R

n SGiS N!CC i A VV - -

a N TT22 M

CEFE P FVFV 9

F LLLL D

C AAAA VVVV 9

S T

S 6tS3 1 oCC t

f 7 T 4 O 3333 W V R

n8R8

////

T

r 0033 7212 P T ////

M 1111 M R 1111 lhl1lls{l1 a, i6"I (

,1 t , '

(

l t

f l'

@ O g

e 4 0 e

4 e MAINTENANCE OF SAFETY RELATED SYSTEMS DURING .

OUTAGE OR REDUCED POWER PERIODS e

UNIT NO.1 ELECTRICAL MAINTENANCE e

e hus su muss asu u m O

N= &.

. e .,

4 0 9 d

ft m R 2~

$e=

a a

O a I' .

EB - E.

b

, a E.

o .

8 as l

g "lE .

p =

, 4 E

E' t =

E E E g  !! h

-h I, .

R .

3 i i s

b t -

B R E

  • k ki kt e D

. 2 e

~ ^-- -. - _ _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,

o'

~

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING .

OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 ELECTRICAL MADfTENANCE e

e

'u '

M.__--______._.______._________________________._____ _ _ _ _ ___m.__._ _ _ _ _ _ _ _ _ _ . _ ___ ..

~

- . o ,

FREM T, 2 Itr 83

  • 3t13 IW PACE %

NetWNNANCE OF SANTT RELATED  !! METS 7 STSTFMS tilRinC OITACE OR REINCEV NWER PERf0ld ,

DEPTs EE.MC MR Sl90 FART miltRF RET 5ERVOT STS CDNY linMR0 3112019%5 '

VALVF" .itMwYD tMIT NOV-CS-203M VT.V VIT4 NOT OFFW ELEC 3111Rn130 11/20/93 CS NOV FErLACE OVEM,0AD ASStPtttiT RfTT.A M D OVE,0 ASSF.MM1,7 3111s1%51 11/1%fE3 .W BMVARER 2 .W-P-10M

  • LIGHTS TESTED SAT TV-St>200-P val.VE SNOVS INTEMtEDIATElatCtfTS 31117tSSR 11/2%f83 NO VALVE  !.itCARO REARinc 90131 for!NO M0 EXCESStVE MOIST  ?

11/2%/n3 EFCR CEWERATR 2-NC-1

?

I I

I l

1 3 '

l I

2 I

( ts 3 .

t I

P .

i l

4 i

0

%i e

MP,

me e

b Fp

  • e MADTTENANCE OF SAFETY RELATED SYErrEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. I DISTRUMENT MAINTENANCE e

9

1

. _ p e 9 0 9

y e* e a

e

'4 g

~

NONE DURING THIS REPORTING PERIOD

~

er e

e

MAINTENANCE OF SAFETY RELATED SYSTEMS DURING OUTAGE OR REDUCED POWER PERIODS UNIT NO. 2 INSTRUMENT MAINTENANCE NONE DURING THIS REPORTING PERIOD e

11

lI ' 1l I

e  %  ? ' , ' , 1 e

e, s  :

  • e.

a R 018 M 351 396 n00 E s1 0 n33 r 1 1 \0RG M

P 333 W

F 3

3 e

3 ,

  • I I

3 i C 9

t f TT 0 AI

  • T t

R S~ W.

N E P

RR 1

R MMT AAl R

. E RCS Y V AIS A 0 PPE D

E 1 M1R t 1P R D C F E DD C oKE w f R tC'l tA t

R R

E P

iIl WP A

W V

NTW CRR M

E ,

C S A P T R t T O S R

M 1 1

I1 R

t n s T ITI ATT WR SN NU GFA f CT E ORS T nE S

0 PO T T

S 15U GA D E

- E RTT A0 T

. A T 0 T. 0t E 0eD E R T R 0 T A T. B O T f P

I PP t W N N 0t M f I A

I S S (DPt S

f O

E C RD N 1t A 2 -

R O %P-R W n-T R

I t

i n

a rC- 1

- T C

A M CT1 N T ET CA NC 9 !P P t N

D N0N NR t .

C A1I S

T S 1 R 'n t 'C t

?

s T t O 333 i V R88 R ///

s E s6G T S t11 P T ///

E 111

  • N M 111 n W

[( ll7Llbl a al, F ,lG 4 ,l

4 HEALTH PHYSICS NONE DURING THIS REPORTING PERIOD O

f 33

m - - - - - - - . _

. ..J ,

PROCEDURE DEVIATIONS REVIEWElf BY STATION NUCIEAR SAFETY AND OPERATING COMMITTEE AFTER TIME LIMus SPECIFIED IN TECHNICAL SPECIFICATIONS November, 1983 Date bateSUSOC Title Deviated Reviewed Precedure No. Unit EMP-C-SOV-92 2 Diode Replacement on Safety si 11-15-83 12-01-83 Related Valcor Solenoid Valves W

e V

34

G

., i .

VIRGINIA ELECTRIC AND Powan COMPANY Ricnwoxn, VIRGINIA 20261 W.L.SrawAmr Vaca Panasomwr Wectuam opumarnown December 14, 1983 Mr. N. M. Haller, Director Serial No. 713 Office of Management and Program Analysis N0/WDC: Jab U. S. Nuclear Regulatory Commission 20555 Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Non. DPR-32 DPR-37

Dear Mr. Haller:

Enclosed is the Monthly Operating Report of Surry Power Station Unit Nos. 1 and-2 for the month of November, 1983.

Ve trul yours, UL d W. L. Stewart Enclosure (3 copies) cc: Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station 9

k

,,/

  • VIRGINIA ELECTRIC AND Powan CoxPANY RIcnwoNI>,VIBOINIA 20 261 w.L.seawaar Vaca Pmmenosar ,

Noctuaa Opssatrose December 14, 1983 Mr. N. M. Haller, Director Serial No. 713 Office of Management and Program Analysis N0/WDC: Jab U. S. Nuclear Regulatory Commission 20555 Docket Nos. 50-280 Washington, D. C. 20555 '

50-281 License Nos. DPR-32 DPR-37

Dear Mr. Haller:

Enclosed is the Monthly Operating Report of Surry Power Station Unit Nos. I and 2 for the month of November, 1983.

Ve truly yours,

_s W. L. Stewart Enclosure (3 copies) cc: Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator Region 11 Mr. D. J. Burke NRC Resident Inspector Surry Power Station

.