ML20086G313
| ML20086G313 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 01/23/1976 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| RO-76-5, NUDOCS 8401110199 | |
| Download: ML20086G313 (2) | |
Text
_
y, rh (v)
(')
8 ;LE COPT; i
7-PHILADELPHIA E'LECTRIC COMPANY 2301 MARKET STREET PHILADELPHIA, PA.19101 cy 2 si e414ooo
-/D
<0f s
gpj{
g h
,;!d O 376 >
January 23, 1976 {
77
,,,,,,mut NE.0I
/
/
Mr. J. P. O'Reilly M
Director, Region I s tu Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 631 Park Avenue y
King of Prussia, PA 19406
.t
Dear Mr. O'Reilly:
t
Subject:
Environmental Deviation j
ThefollowingdeviationwasreportedtoMr..Jimhartlow, Office of Inspection and Enforcement, Region I, United States Nuclear Regulatory Conmission on January 15, 1976.
Reference:
License Number Dpr-44/56 Appendix B f
y Environmental Technical Specifications:
2.2 3"
/
Report No.:
50-277/278-76-5
/
Report Date:
January 23, 1976
[
Deviation Date:
January 14, 1976 Facility:
Peach Bottom Atomic Power Station
(
Units 2 & 3 g
R.D. 1, De l ta, Pennsylvania 17314
,\\
Identification of Deviation:
Settling basin effluent pH in excess of Environmental Technical Specification limit.
Conditions Prior to Deviatio'n:
Unit 2 operating at approximately 99X power. Unit 3 shutdown for maintenance outage.
Description of Deviation:
Routine analysis of the settling basin effluent disclosed a a pH of 11 3 Dy ignation of Apparent Cause of Deviation:
.The neutralizing tank was discharged to the settling basin without being neutrali zed due to an improper volving li,ne-up564 -
l l
8401110199 760123 PDR ADOCK 05000277 N
S PDR COPY SENT REGION
e t O
O Mr.
J. P. O'Reilly 50-277/278-76-5 Januiry 23, 1976 Page 2 Analisis of Deviation:
Because the settling basin flow is diluted by a factor of approximately 100,000 with circulating water flow, the pH of the circu-lating water was unaf fected. Therefore, the environmental impact was minimal.
Corrective Action:
The settling basin was immediately isolated and neutralized.
j The valve in the secondary flow path from the neutralizing tank to the i
settling basin was locked closed. ' Correct operation was emphasized to the operators.
Failure Da a:
None.
4 Very truly yours, M.
. Cooney Superintendent Generation Division - Nuclear cc: