ML20086G283
| ML20086G283 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/17/1995 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | |
| References | |
| OLA-3-I-MOSBA45, NUDOCS 9507140209 | |
| Download: ML20086G283 (1) | |
Text
. - - _
3 yz q p.-- OL A-3 5' Ill0Slbb' Ex$
gage I Of Tape # 27 side B, 45%
USNRC O
SEGMENT #3 75 E -6 P3 :19 Date: 4-2-90 Location : Large Conference room, Adminestration Building 0FFICE OF SECRETARY 00CKETING & SERVICE Chaffee: So basically, so then, you replaced the one that was venting, you 94Wd H the one that was tripped and after you did that that then how many successful starts did you have of runs of the diesel ? Because that's what you currently have in place.
i Bockhold: Right. About 14,12.
Stokes: After actually replacing the switches, maybe not quite as many.
Holmes: I know that when we were there, we started it 6 times.
i Bockhold: Six times plus the undervoltage test plus the operability test, eight.
Chaffee:
So how about jacket water pressure low that didn1 give you any problems j
at all and that was replaced before you even started the testing.
O l
l l
l NUCLEAR REGULATORY COMMISSION y.W24.otA-3 Dacket N3 Y'
- 2 f* A -7 0fficial Exh. No.
L+. 4I In the matter o!
$P(
e4 Al.
St.W IDENTIFlED g
(
Appucant RECOVED 7
Intervenor 7
REJECTED Contg Off r 9507140209 950517 Contractor DATE ON f 7-Af ADOCK 0500 4
hDR Ot'ler witness s e,. ( = &cc4 Reporter
(.
O g f-
_. -......... -..,