_

i O

7..e>

PHILADELPHI A ELECTRIC COM Y

i

)

2301 MARKET STREET

. ' ; iJ"Gm i

, [. '

< h[3,

PHILADELPHI A. PA.10101 e

. m..,/f_} x N

' 'l' M,e 1

.: v k

i 9;

mm 04i-4ooo t

' 10,;,7,3 s. -I 7

23, 19767 war u.s. o in January

\\

wnm,m m.i u..

s g-y

\\

h'/

Mr. J. P. O'Reilly N.Qd Director, Region I Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission j;

631 Park Avenue r

19406 King of Prussia, PA

Dear Mr. O'Reilly:

i i

Environmental-Ocvintto_n

Subject:

1 I

l The following deviation was reported to Mr.. Jim Part ow,i d States f Of fice of Inspection and Enfo.:cment, Region 1, Un te 15, 1976.

Reg > latory Cotrmission on January License Number Dpr-M/56 Appendix 8 2.2 3 Environmental Technical Specifications:

Reference:

i 50-277/278-76-5 Report No.:

23, 1976 January Report Date:

14, 1976 January Peach Bottom Atomic Pewer Station Ocviation Date:

f' ac i li ty :

Units 2 & 3 17314 R.D.1, Ocita, Pennsylvania e

Identification of Deviation:

l Technical Settling basin effluent pil in excess of Environmenta Specification limit.

Cmditions Prior to Ocviation:

Unit 3 sbitdown Unit 2 operating.at approximately 99/opower.

for maintenance outage.

O g ry t_fon of Deviation:

l da Routine miclysis -of the settling basin ef fluent disc ose a pil of 11 3 DMnation of Apparent Cau.c er noviation:

e was dixharged to the settling basin s

g The neutrali zing tants vaiving 1i.nc-upi3GG -

h without being neutralized duo' to an impeoper I

8401100495 760123 PDR ADOCK 05000277

_s PDR 8

(~

Q Q,)

(G Mr.

J. P. O'ReilIy 50-277/278-76-5 Januiry 23, 1976 Page 2

Analisis of Deviation:

Uccause the settling basin flow is diluted by a factor of approximately 100,000 with circulating water f low, the pil of the circu-lating water was unaffected.

There fore, the environmental impact was minimal.

Corrective Action:

The settling basin was imnediately isolated and neutralized.

The valve in the secondary flow path from the neutralizing tank to the settling basin was locked closed. Correct operation was emphasized to tne operators.

Failore Data:

None.

Very truly yours, M a y?.

<r-may.

H.

.. Cocncy Superintendent Generation Division - Nuclear cc:

Mr. J. G. Davis, NRC Mr. W. G. McDona ld, NRC m

0

o e

/*

4 PHILADELPHIA ELECTRIC COMPANY d

23O1 MARKET STREET PHILADELPHI A, PA.19101 1285)841 40o0 January 23, 1976 Mr. J. P. O'Reilly Director, Region 1 Office of Inspection and Enforcement U.S. Nuclear Regulatory Conunission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. O'Reilly:

Subject:

Environmental Deviation The following deviation was reported to Mr. Jim Partlow, Office of Inspection and Enforcement, Region 1, United States Nuclear Regulatory Coninission on January 15, 1976.

Reference:

License Number Dpr-44/56 Appendix B Environmental Technical Specifications:

2.2 3 Report No.:

50-277/278-76-5 Report Date:

January 23, 1976 Deviation Date: January 14, 1976 Facility:

Peach Bottom Atomic Power Station Units 2 & 3 R.D.1, Delta, Pennsylvania 17314 Identification of Deviation:

Settling basin effluent pH in excess of Environmental Technical Specification limit.

Conditions Prior to Deviation:

Unit 2 operating at approximately 99% power. Unit 3 shutdown for maintenance outage.

Description of Deviation:

Routine analysis of the settling basin effluent disclosed a a pH of 11 3 Designation of Apparent Cause of Deviation:

The neutralizing tank was discharged to the settling basin wi:.hout being neutrali zed due to an improper valving line-up.

I A

(

O O

i Mr. J. P. O'Reilly 50-277/278-76-5 January 23, 1976 Page 2 Analysis of Deviation:

Because the settling basin flow is diluted by a factor of l

approximately 100,000 with circulating water flow, the pH of the circu-i lating water was unaffected. Therefore, the environmental impact was minimal.

I Corrective ' Action:

The settling basin was innediately isolated and neutrali zed.

The valve in the secondary flow path from the neutralizing tank to the settling basin was locked closed. Correct operation was emphasized J

to the operators.

1 Failure Data:

None.

Very truly yours, inff M.

. Cooney F

Su erintendent Generation Division - Nuclear cci Mr. J. G. Davis, NRC Mr. W. G. Mcdonald, NRC i

i e