Environ RO 76-23:on 760429,two Cooling Towers Became Simultaneously Inoperable.Caused by Shaft Line Bearing Housing Thrown Free & Falling Through Structure.Tower C Returned to Svc
ML20086G241
Person / Time
Site: Peach Bottom  
Issue date: 05/07/1976
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stello V
Office of Nuclear Reactor Regulation
References
RO-76-23, NUDOCS 8401100128
Download: ML20086G241 (2)


Text

-.-..... -

~

O O

h.iLADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHIA. PA.19101

  1. 2:si a414ooo f-May 7, 1976 R

i w.-

y s

h k.

j 6k '

Mr. Victor Stello, Jr.

Director h

f Division of Operating Reactors x

D

!i Office of Nuclear Reactor Regulations United States Nuclear Regulatory Commission i

?

Washington, DC 20555

Dear Mr. Stello:

Subject:

Environmental Deviation The following deviation was reported to Mr. Walt Baunack, Region 1, Office of Inspection and Enforcement, United States Nuclear Regulatory Commission on April 29, 1976.

Reference:

License Number DPR-44/56 Environmental Technical Specifications:

2.1 Report No.:

50-277/278-76-23 Report Date:

May 7, 1976 Deviation Date: April 29, 1976 Facility:

Peach Bottom Atomic Power Station Units 2 and 3 R.D. 1, Delta, PA 17314 Identification of Deviation:

Two cooling towers simultaneously inoperable.

Conditig.s Prior to Deviation:

Unit 3 operating at full power. Unit 2 off for a refueling outage. The 'A' cooling tower was out of service due to a previous lift pump bearing failure. The 'B' cooling tower was fully operable during the outage. River flow was about 39,000 CFS.

Description of Deviation:

The 'C' cooling tower was removed from service for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, making two cooling towers inoperable.

8401100128 760507 l

PDR ADOCK 05000277

,1% -4 i

8 PDR 1

sm mux #

Mr. Victer Stollo, Jr.

5 7/278-76-23 May 7, 1976 Page 2 g

Designation of Apparent Cause of Deviation:

The 'C' tower was removed from service to erect scaffolding and repair a section of the tower structure. The structure was j

previously damaged when a shaft line bearing housing was thrown free l

and fell through the structure.

l l

Analysis of Deviation:

I Differential temperatures between the Pennsylvania-Maryland i

State Line and Holtwood Dam remained within Pennsylvania State limits.

Single unit operation during this period uinimized the thermal impact of this deviation.

Corrective Action:

The 'C' tower was returned to service subsequent to completing replacement of shaft line bearing housing.

Failure Data:

None.

Very truly yours, M

. Cooney perintendent Generation Division-Nuclear l