Text
.
~
,T.
i.
PHILADELPHIA ELECTRIC COMPANY
~
"~,
2301 MARKET STREET PHILADELPHIA PA.19101 if:. g 1215)841-4000
~!
Q *$ &
@{
May 12, 1976 E
hE t
I~
in. s' 2
Mr. Victor Stello, Jr.
a f, a
Director Division of Operating Reactors
-N Office of Nuclear Reactor Regulations
/,9 United States Nuclear Regulatory Comission Washington, D.C.
20555
('
Dear Mr. Stello:
Subject:
Environmental Deviation s'
The following deviation was reported ~to 14r. Walt Baunack,"
Region 1 Of fice of Inspection and Enforcement," United States Nuclear Regulatory Commission on May 2, 1976.
f
Reference:
License Number DPR-44/56 2.1 s
Environmental Technical-Specification:
Report No.
50/277/278-76-24
~
Report Date:
May 12, 1976 Deviation Date: May 2. 1976 Facility:
Peach Bottom Atomic Power Station Unit 2 and 3 R.D., Delta, PA 17314~
Identification of Geviation:
Two cooling towers simultaneously inoperable.
Conditions Prio> to Deviation:
Unit 3 operating at 70% power. Unit 2 off for refueling outage. The "A" tooling tower was out of service due to a previous lift pump bearing failure. The "C" cooling tower was fully operabic during the outage. River flow was about 39,000 CFS.
l j$66 0401100124 760512 t
PDR ADDCK 05000277
-N*
l S
/~
l s
3 N
v' COPY tiENT RL'GION
_ _1 s
l
5 Mr.VictorStllh,Jr.
()
50-277/278-76-24
,Mzy 12; l'976 Pagn 2 a
Description of Deviation:
T An operator making his rounds saw water gushing from the door of the "B" lif: pump structure. The pump-was removed from service making two coollag towers inope.:able.
Designation of Apparent Cause of Deviation:
Bolts holding the suction bell housing to the pump casing f ailed, causing the housing to fall ~to the bottom of the lif t pump pit.
T The lif t pump discharge piping was cracke'd, and the base plate of the pump had shifted.
s s
Analysis of Deviation:
N Differential temperatures between the Pennsylvania-Maryland State and Holtwood Dam remain within Pennsylvania _ State limits. Single unit operation during this period minimized the' thermal impact of this deviation.
.,C_orrective Action:
Investigative work is continuing to determine the exact cause of failure. Expidited maintenance work !s in progress to return the lif t pump to service as promptly as possible. Philadelphia Electric Company Engineering Department and several consultants are involved in a co-ordinated effort to identify the cause of this failure and defermine a course of action to prevent recurrence of this type f ail-N ure.
e Failure D&ta:
A similar environmental deviation was reported in Environ-mental Deviation Report 50-277/278-76-9
\\
\\
Very truly yours, N,
1 L
l Ww
{
M.
Cooney Superintendent Generation Division-Nuclear g