Environ RO 76-24:on 760502,two Cooling Towers Became Simultaneously Inoperable.Caused by Failure of Bolts Holding Suction Bell Housing to Pump Casing.Investigation Continuing to Determine Course of Action
ML20086G237
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/12/1976
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stello V
Office of Nuclear Reactor Regulation
References
RO-76-24, NUDOCS 8401100124
Download: ML20086G237 (2)


Text

.

~

,T.

i.

PHILADELPHIA ELECTRIC COMPANY

~

"~,

2301 MARKET STREET PHILADELPHIA PA.19101 if:. g 1215)841-4000

~!

Q *$ &

@{

May 12, 1976 E

hE t

I~

in. s' 2

Mr. Victor Stello, Jr.

a f, a

Director Division of Operating Reactors

-N Office of Nuclear Reactor Regulations

/,9 United States Nuclear Regulatory Comission Washington, D.C.

20555

('

Dear Mr. Stello:

Subject:

Environmental Deviation s'

The following deviation was reported ~to 14r. Walt Baunack,"

Region 1 Of fice of Inspection and Enforcement," United States Nuclear Regulatory Commission on May 2, 1976.

f

Reference:

License Number DPR-44/56 2.1 s

Environmental Technical-Specification:

Report No.

50/277/278-76-24

~

Report Date:

May 12, 1976 Deviation Date: May 2. 1976 Facility:

Peach Bottom Atomic Power Station Unit 2 and 3 R.D., Delta, PA 17314~

Identification of Geviation:

Two cooling towers simultaneously inoperable.

Conditions Prio> to Deviation:

Unit 3 operating at 70% power. Unit 2 off for refueling outage. The "A" tooling tower was out of service due to a previous lift pump bearing failure. The "C" cooling tower was fully operabic during the outage. River flow was about 39,000 CFS.

l j$66 0401100124 760512 t

PDR ADDCK 05000277

-N*

l S

PDR

/~

l s

3 N

v' COPY tiENT RL'GION

_ _1 s

l

5 Mr.VictorStllh,Jr.

()

50-277/278-76-24

,Mzy 12; l'976 Pagn 2 a

Description of Deviation:

T An operator making his rounds saw water gushing from the door of the "B" lif: pump structure. The pump-was removed from service making two coollag towers inope.:able.

Designation of Apparent Cause of Deviation:

Bolts holding the suction bell housing to the pump casing f ailed, causing the housing to fall ~to the bottom of the lif t pump pit.

T The lif t pump discharge piping was cracke'd, and the base plate of the pump had shifted.

s s

Analysis of Deviation:

N Differential temperatures between the Pennsylvania-Maryland State and Holtwood Dam remain within Pennsylvania _ State limits. Single unit operation during this period minimized the' thermal impact of this deviation.

.,C_orrective Action:

Investigative work is continuing to determine the exact cause of failure. Expidited maintenance work !s in progress to return the lif t pump to service as promptly as possible. Philadelphia Electric Company Engineering Department and several consultants are involved in a co-ordinated effort to identify the cause of this failure and defermine a course of action to prevent recurrence of this type f ail-N ure.

e Failure D&ta:

A similar environmental deviation was reported in Environ-mental Deviation Report 50-277/278-76-9

\\

\\

Very truly yours, N,

1 L

l Ww

{

M.

Cooney Superintendent Generation Division-Nuclear g