Environ RO 76-38:on 760922,pH for Settling Basin Effluent Exceeded ETS Limit.Cause Not Determined.Settling Basin Isolated & Neutralized.Ph Checked & Normal Operation Resumed
ML20086G098
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/01/1976
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stello V
Office of Nuclear Reactor Regulation
References
RO-76-38, NUDOCS 8401100050
Download: ML20086G098 (2)


Text

.n.9 9

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILADELPHI A. PA.19101 12151841 dooo Uctober 1,1976 A

S

(/

Wlf*'

Mr. Victor Stello, Jr.

y[

,J.

Director

]E OCT4 g!p)

Division of Operating Reactors Office of Nuclear Reactor Regulations United States Nuclear Regulatory Commission v.s wg. ty'jf

?. /

Washington, D.C.

20555 g

Dear Mr. Stellos s,j g

SUBJECT:

ENVIRONMENTAL DEVIATION The following deviation was reported to Mr. Baunack, Office of Inspection and Enforcement, Region 1, United States Nuclear Regulatory Conmission on September 23, 1976.

Reference:

License Number DPR-44/56 Environmental Technical Specifications:

2.2.2 Report No.:

50/277/278-76-38 Report Date:

October 1,1976 Deviation Date:

September 22, 1976 Facility:

Peach Bottom Atomic Power Station Units 2 & 3 R.D. 1, Delta, PA 17314 Identification cf Deviation:

The pH for the settling basin effluent exceeded the Environmental Technical Specification limit.

Conditions Prior to Deviation:

Settling basin operating with maximum holdup. Raw water sump in automatic mode of operation.

Description of Deviation:

A daily routine grab sample from the settling basin effluent measured a pH of 10.5.

The verification sample measured 10 5.

8401100050 761001 gDRADOCK 05000277 PDR GQPX SENT RMy-10007

o o

a Mr. Victor Sto11o, Jr.

50-277/278-76-38 '

~

October 1,1976 Page 2 Designation of Apparent Cause of Desviation:

The specific cause for this deviation could not be determined.

The pH of the inpats to the settling basin (neutralizing tanks and raw water sump) was checked and found to be within Technical Specification limits. The deviation may have been caused by a mechanical f ailure of the seda ash feeder a few hours earlier. High pH soda ash solution may have entered the raw water sump af ter the f ailure. This mechanical f ailure was repaired before the deviation was discovered.

Analysis of Deviation:

It is known that the deviation was less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in length and believed to have been only one to two hours in duration. Because the settling basin is diluted by a factor of 10,000 with circulating water flow, the environmental impact was minimal.

Corrective Action:

The settling basin was isolated and neutralized. The pH was checked and normal operation resumed.

Failure Data:

Environmental Deviation Reports 50*277/278-76-30,50-277/278-76-31, 50-277/278-72-32, and 50-277/278-72-35.

Very truly yours, LA

, / / ' ?,' L( wc L j/

M. J. Cooney "

Superintendent Generation Division - Nuclear 4

4