Environ RO 76-39:on 760929,pH for Settling Basin Effluent Exceeded ETS Limit.Caused by Soda Ash Solution Mix Tank Overflowing Into Raw Water Sump When Suction Line Plugged. Settling Basin Isolated & Neutralized
ML20086G090
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/08/1976
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stello V
Office of Nuclear Reactor Regulation
References
RO-76-39, NUDOCS 8401100047
Download: ML20086G090 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

mQ PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET PHILA D ELPHI A.' PA.19101 12151 e41-4ooo October 8,1976 Mr. Victor Stello, Jr.

Director U '-

Division of Operating Reactors Office of Nuclear Reactor Regulations

\\,f. ).~.

s U.S. Nuclear Regulatory Conmission Washington, DC 2055.~-

Dear Mr. Stello:

Subject:

ENVIRONMENTAL DEVIATION The following deviation was reported to Mr. Harvey Cantor, Office of Inspection and Enforcement, Region 1, United States Nuclear Regulatory Conmission on September 30, 1976.

Reference:

License Number DPR-44/56 Environmental Technical Specifications:

2.2.2 Report No.:

50-277/278-76-39 Report Date:

October 9,1976 Deviation Date:

September 29, 1976 Facility:

Peach Bottom Atomic Power Station Units 2 & 3 R.D. 1, Delta, PA 17314 Identification of Deviation:

The pH for the settling basin effluent exceeded the Environmental Technical Specification limit.

Conditions Prior to Deviation:

Settling basin operating with two input flow paths. Raw water sump in automatic mode of operation.

Okoh PDR 0316 u>n sur REGON

' Hr. Victor Stel

, Jr.

50-277/278-76-39 October 8,1976 Page 2 l

Description of Deviation:

The daily grab sample from the settling basin effluent measured a pH of 9 35 The verification sample also measured 9 35 The Technical Specification limit is that pH shall be within the range of 6.0 to 9 0.

i Designation of Apparent Cause of Deviations The soda ash solution mix tank overflowed to the raw water sump when the suction line of the solution pump plugged. The un-neutralized sump was automatically discharged to the settling basin because the raw water sump pump discharge pH meter range switch was set on an improper range and would not trip the pump.

Analysis of the Deviation:

i 4

The high pH condition existed for less than twenty - four hours. The exact duration is not known. The settling basin flow is diluted by a factor of 10,000 with circulating water flow, therefore the effect on the pH of the circulating water and the environment was minimal.

Corrective Action:

The settling basin was isolated and neutralized, and the suction line of the soda ash solution pump was cleaned. After check-i ing for proper pH levels, the system was returned to normal. The inline pH meter was re-calibrated an returned to service. The range selector switch is being removed to prevent repeat of error.

Failure Data:

Environmental Deviation Reports 50-277/278-76-30, 50-277/278-76-31, 50-277/278-76-32, 50-277/278-76-35 and 50-277/278-76-38.

i l

l Very truly yours,

' ),

p(, C J./Cooney Superintendent u