ML20086F828

From kanterella
Jump to navigation Jump to search
Environ RO 77-3:on 770117,pH for Sewage Plant Effluent Exceeded ETS Limit.Caused by Influent W/Ph Slightly Lower than Normal.Sewage Plant Neutralized & Returned to Normal Operation
ML20086F828
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/27/1977
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stello V
Office of Nuclear Reactor Regulation
References
RO-77-3, NUDOCS 8401090519
Download: ML20086F828 (2)


Text

. _ _.

. O O

3 D COPY l

PHILADELPHIA 21.ECTRIC COMPANY I

i 2301 MARKET STREE' PHILADELPHIA. PA.191Ci 1215)9414000 Jamery 27, 1c,7

{/

,3.[Iy8f.I{ e.<

.3.s a

T,q j..

h.'}W').

d\\

f*D4 *. 24 '

~'

Mr. '13cter Stello, Jr.

i.s \\.,?g d' b / p%

c Dir nter t

S( /

Division of Operating Reactors hk, ION'M Office :.f thciear Reactor Regulations W

U.S. !belear Regulatory Cc= mission Washington, D.C. 20555 Doar Mr. Stallo:

_ DJET:

DNIRCNME'"IA; DEVIN"I'W.

W

"

  • following danatiaa van rge: wt : c Mr. Wi.' Sunsek, C:'fa + cf Insp-ction an1 Enforcenent, Region 1, N.ta.i 3:stos Nucle r ?ogulatcr7 C tr* ecion er. January 17, 1977.

FeDracce:

License uta'aer C'?. 4 4 Y

Envirt.ru-u tal Tec'.n.n L 3pecifi<..*'cas 2.2 3 r

Raport So.:

50-277/2 5 77-3 Eeport Date:

Jama:7 27, 1977 Deviation Date:

Januar/ 17, 1977 Fsellity:

Peain Eattom Atode Pouer Station (Units 2 & 3) relta, FA 17314 Ident'mfication of De'rin+, ion:

The pH for the sewage ph_t :ffluent uce'ded the Environnertal Technical Scecificttien limit.

/

COPY SENT REGION,/

g g ;.c.,s e-im u f e istien:

5evage. ; lat cperstd rg n -- '^.,.

'Le.;;1.nion of Davide.,n1 The daily grab sanple frem the sewage plant-affluent neasured a pH of 5 5.

The fochnical Specification limit is that pH shall be within the range of 6.0 to 9 0.

0401090519 770127 PDR ADOCK 05000277 S

PDR

D O

Mr. Victor Stello, Jr.

50-277/278-77-3 January 27, 1977 Page 2 Designation of Annarent Cause of Deviation:

An acidic solution may have been flushed into the sewage system and reduced the pH of the whole system; however, since no such source could be located, it is thought that the low pH of the effluent was caused by influent with pH slightly lower than normal but a pH above 6.0 coupled with the natural pH drop across the style of sewage treatment plant.

Analysis of Deviadon:

The duration of the deviation was less than one hour. Because the effluent from the sevage plant was being diluted by a factor of 50,000 at the time, the pH change in the. circulating water leaving the discharge canal was not detectable. The environmental impact was insignificant.

Corrective Action:

The sewage plant was neutralized and returned to normal operation.

A joint effort between Peach Bottom and Betz Environmental Engineers, Inc.

1: underway to optimize the operation of the" sewage plant in order to prevent Ibrther deviation of this nature.

Failure Data:

50-277/278-76-36, 50-277/278-76-42 & 50-277/278-76-43 Very truly yours, M

. Cooney perintendent Generation Division - Nuclear cc:

J. P. O'Reilly NBC, Regional Office e

.