Forwards Application for Amend to License DPR-40,changing Tech Spec 2.10 to Reflect Changes Necessary for Cycle 14 Operation,Per Generic Ltr 88-16
ML20086F415
Person / Time
Site: Fort Calhoun 
Issue date: 11/27/1991
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086F416 List:
References
GL-88-16, LIC-91-320A, NUDOCS 9112030219
Download: ML20086F415 (2)


Text

,

l g;

s magnem==r

~.

R.

~

~.

Omaha Public Power District 444 South 16th Stieet Mall Omaha, Net;raska Ca102 2247 402/6W 2000 November 27, 1991 LIC-91-320A i

U. S. Nuclear Regulatory Conrnission Attn: Document Control Desk Mail Station Pl 137 Washington, DC 20555

References:

1.

Docket No. 50 285 i

2.

Letter from 0 PPD (W. G. Gates) to NRC (Document Control Desk) dated November 27, 1991 (LIC-91-32]A)

Gentlemen:

SUBJECT:

Application for Amendment of Operating License for Cycle 14 Enclosed please find Omahs Public power District's (OPPD) " Application for Amendment of Operating License" which seeks to amend the fort Calhoun Station Unit No. 1 Technical Specifications.

This submittal contains only one proposed thange associated with the design of Cycle 14, specifically a change in the negative limit for the Moderator Temperature Coefficient (MTC),

in Reference 2, OPPD proposed thanges to the Technical Specifications for implementation of a Core Operating Limits Report (COLR) in accordance with Generic letter 88-16.

For Cycle 14, all core parameter changes are being included in the COLR with the exception of the MTC.

Copies of the Cycle 14 COLR will be provided to the NRC Document Control Desk as well as the Region IV Administrator and the fort Calhoun Station Senior l

Resident inspector, upon document issuance, in accordance with Generic letter 88-16 and the, reposed Technical Specification 5.9.5 (of Reference 2).

Approvil of this proposed MIC Technical Specification change is requested by April 15, 1992, which is prior to the planned Cycle 14 criticality, i

Attachment A coitains a markup reflecting the requested change to the Technical l

Specifications.

Attachment B provides a Discussion, Justification and No l

Significant HazarJs Consideration Analysis, for the change requested.

,T 1

41 n%

(

g,g g o 91j};7

~ W""

"W 4 % 124 7

um m,.

. ~.

f U. S. Nuclear Regulatory Comission LIC-91-320A Page 2 i

If you should have any questions, please contact ice.

Sincerely, o'

9'"

,,k.gk"%_._ _ _.

~

u ---

l W. G. Gates

/ % Division Manager Nuclear Operations WGG/sel c:

LeBoeuf, Lamb, Leiby & MacRao R. D. Martin, NRC Regional Administrator, Region IV 4

D. L. Wigginton, NRC Senior Project Manager R. P. Mullikin, NRC Senior Resident Inspector H. Borchert Director - Division of Radiological Health State of Nebraska