Forwards Ccnpp Unit 2 Cycle 11 Summary of Startup Testing, Per TS 6.9.1.1.Unit 2 Resumed Commercial Power Operation on 950518
ML20086E291
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 07/05/1995
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086E298 List:
References
NUDOCS 9507110309
Download: ML20086E291 (1)


Text

-- - _- - -___-____________-_____ _ - _ _ - - _ _ - _ _ _ _ _ - _

CIIARLES II. CbtJSE Baltimore Gas and Electric Company

, Plant General Manager Calvert Cliffs Nuclear Power Plant l 16.Malun cms Parkway j Calvert C!iifs Nuclear Power Plant Lusby, Maryland 20657 1 410 586-2230 Ext. 4101 Local 410 260-4101 Baltimore July 5,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Unit 2 Cycle 11 Startuo Report: Technical Specification 6.9.1.1 _

Enclosed is the Calvert Cliffs Unit 2 Cycle 11 Startup Report required by Technical Specification 6.9.1.1.

This report must be submitted within 90 days of completion of testing or resumption of commercial power operation, whichever comes first. Unit 2 resumed commercial power operation on May 18,1995.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours,

-/

CHC/DWM/bjd g/'- ga/-

Enclosure i

cc: D. A. Brune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC i P. R. Wilson, NRC

l. R. I. McLean, DNR l J. IL Walter, PSC 6#

I t at u .

9507110309 950705 l t PDR ADOCK 05000318 i P PDR