ML20086E291
| ML20086E291 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 07/05/1995 |
| From: | Cruse C BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086E298 | List: |
| References | |
| NUDOCS 9507110309 | |
| Download: ML20086E291 (1) | |
Text
--
CIIARLES II. CbtJSE Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant l
Plant General Manager 16.Malun cms Parkway j
Calvert C!iifs Nuclear Power Plant Lusby, Maryland 20657 1
410 586-2230 Ext. 4101 Local 410 260-4101 Baltimore July 5,1995 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No. 2; Docket No. 50-318 Unit 2 Cycle 11 Startuo Report: Technical Specification 6.9.1.1 Enclosed is the Calvert Cliffs Unit 2 Cycle 11 Startup Report required by Technical Specification 6.9.1.1.
This report must be submitted within 90 days of completion of testing or resumption of commercial power operation, whichever comes first. Unit 2 resumed commercial power operation on May 18,1995.
Should you have questions regarding this matter, we will be pleased to discuss them with you.
Very truly yours,
-/
CHC/DWM/bjd g/'-
ga/-
Enclosure i
cc:
D. A. Brune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC i
P. R. Wilson, NRC l.
R. I. McLean, DNR l
J. IL Walter, PSC 6#
I t at u 9507110309 950705 l
t PDR ADOCK 05000318 i
P PDR
.__ _ - - _ _ _ _ _ _.