Forwards Response to NRC 911112 Request for Addl Info Re 911016 Application for Amend to License R-113,moving Current Requirement of Administrative Reviews of Emergency & Physical Security Plans to Tech Specs
ML20086E278
Person / Time
Site: U.S. Geological Survey
Issue date: 11/20/1991
From: Danni Smith
INTERIOR, DEPT. OF, GEOLOGICAL SURVEY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9111270147
Download: ML20086E278 (2)


Text

O

/["*

TAKE -

j "' T United States Department of the Interior IAf#4:l=l::::

H W

l)

GEOLOGICAL SURVEY summmmmmmme 1_

T "a

BOX 25046 M.S.

97, DENVER FEDERAL CENTER DENVER, COLORADO 80225 IN REPLY Rtf't A 70, DRANCH OF GEOCHEMISTRY November 20, 1991 Document Control Desk U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Re: USGS TRIGA Reactor Facility Docket No. 50-274, License R-113 Gentlemen:

This letter is in response to your request for additional information dated November 12,

'991.

Our amendment request dated October 16, 1991 requested that the current requirement of administrative reviews of the emergency plan and physical security plan be moved to the Technical Specifications.

We were not aware that we would be required to change the word " review" to " audit".

We did--not state, nor intend to imply, that the proposed wording of the request was identical to the ANS standard.

In accordance with your request, we have changed the wording of the proposed amendment.

The attached page contains the new wording (see stop l

5).

' ncerely //

, 47

<g David B.

Smith l

Reactor Administrator 1

i Copy to:

l Tim DeBey i

l Subscribed and affirmed before me this 21st day of November, 1371.

i C

Carol Case, Notary MY COMMISSION EXPIRES JULY 11.195 9081'ti AW S38WX3 NOISSWWOO AN nV d

ei 9111270147 911170 POR AIJOCK 05000274 l

F PDR g

m 0-A L

11/91

. 4 3.

Written instructions shall be in effect and followed for:

Testing and calibration of reactor operating I

a.

I;g instrumentation anci control systems, control rod drives, area radiation monitors and air particulate monitors.

b.

Reactor startup, rout'*e operation and reactor shutdown.

c.

Emergency and abnormal conditions, including evacuation, reentry and rc~'very, d.

Fuel loading or unloading e.

Control rod removal and replacement.

f.

Maintenance operations which may affect reactor safety.

4.

Any additions, modifications, or maintenance to the core and its associated support structure, the pool structure, and rod drive mechanisms, or the reactor safety system, shall be made and tested in accordance with the specifications to which the systems or components were originally designed and fabricated, or to upocifications approved by the Reactor Op3 rations Committee as suitable and not involving an unreviewed safety question.

The reactor shall not be placed in operation until the affected system has been verified to oc operable.

5.

The reactor facility emergency plan, emergency procedures aM physical security plan shall be audited by the Reactor Operations Committee at least biennially, with the interval not to exceed 30 months.

I.

HXpfr_inents 1.

Prior to performing any new reactor experiment, the pro-posed experiment shall be evalaated by a person or persons appointed by the Reactor Administrator to ce responsible for reactor safety.

He shall consider the experiment in terms of its effect on reactor operation and the possibil-ity and conse g.

+,of its failure, including, where significant, considt ation of chemical reactions, physical integrity, desia life, proper cooling, interaction

.