O O
L -
~
Public SeMee Company *fP ConrotrA-o e
P. O. Box 361, Platteville, Colorado 80651 3
a January 14, 1974 Mr. E. Morris Howard Director, Directorate Regulatory Operations, Region IV USAEC 10395 West Colfax Denver, Colorado 80215
Dear Mr. Howard:
On Saturday, January 12, 1974, inspection of the permanent half size top reflector to be installed in layer two of the Fort St. Vrain reactor, revealed a number of elements that did not meet the specifications for chips and gouges.
One element was found to have an off-center drilled dowel hole.
Spare reflectors were substituted for five of these out-of-specification blocks.
Seven blocks remain to be replaced.
To facilitate continued testing, these seven out-of-specification reflectors lJ,.; y.
have been installed in the reactor in layer 2 and layer 3, Column 7 of
- 3. '..' (.J.;.
region six.
, e r.
.9;:. " ; Ap Great Lakes Carbon, supplier of the reflector elements, has been contacted 54, m - p
.g.gr~
and their schedule for delivery of the replacement elements call for them to arrive during the first week in February.
~,
Substitution of the replacement reflector.s for the out-of-specification blocks presently installed shall be made to minimize schedule interference.
4 Very truly yours0
[
f
-l
/:f f
\\
~
~4 e C weg s
Frederic E. Swart Superintendent i
Fort St. Vrain Nuclear Generating Station FES:11
=
'MJ5 8312060271 740114 3
PDR ADOCK 05000267 S