Text
,
o o
t VERMONT YANKEP. N UCLEAR POWER CORPORATION SEVENTY SEVEN OROVE STRCCT RUTLAND, VERMONT 03701 VYV-2961
~
REPLY TO:
P. O. sox 157 VERNON. VERMONT 053s4 August 17, 1973
. -: y
,,W United States Atomic Energy Commissic.n Directorate of Regulatory Operations, Region I
'I I j'
3.i,4 p'l O)
'Q,. 4 631 Park Avenue
/
r ?,'.
King of Prussia, Pennsylvania 19406
\\g.
~1
$9&".5
'4 1
REFERENCE:
Operating License DPR-28 N
/
' t" c'
\\.3 [
. l[,
A Docket No. 50-271
' f, Abnormal Occurrence No. A0-73-24 Centlemer.:
-. 4Qf
.V As defined by Technical Specifications for the Vermont Yankee n..,.1. o r pnuar gration Sactinn A.7.3.1. up nre renorrina the followino nu-DI*, and evuflamius uut olsekuu sumu t ma t vetutteuce ao conversation with your office.
At approximately 1400 on August 16, 1973, an instrument technician, while investigating a reported opening of the Pressure Suppression Chamber-Reactor Building Vacuum Breakers, discovered that the instrument Jines monitoring suppression chamber pressure were incorrectly tubed g
to the dif ferential pressure sensors which activate breaker operation, 3
thus causing actuation with positive suppression chamber pressure. This inoperabili ty of the Pressure Suppression Chamber-Reactor Building Vacuum Breaker s-m exceeds the Limiting Conditions for Operations as defined by Section
. 7. A.3.a of Technical
- Specifications. The subject section requires that two of tvo vacuum breakers shall be operable at 'all times when primary containment integrity is required.
The instrument line connections to DPIS 16-19-32A and,B were immediately corrected and returned to service by 1430 on August 16, 1973.
S f,V
~
9i 0312g30 Nb o
p ena a
6 3, 8 0 S
^
COPY SENI' REGION 4
.)
, L.
O oO k.,),
VERMONT YolKCC NUCLCAR POWER CORPORATiod I
Directorate of Regulatory Operations
}
August 17, 1973 I
Page 2 All other dif ferential pressure sensors are being investigated te ensure that a sin.ilar condition does not exist elsewhere.
Very truly yours, VERMONT YANKEE I.1] CLEAR POWER CORPORATION
""" 3 s.yc George S. Thomas Assistant Plant Superintendent WFC/kbd t