AO 73-24:on 730816,instrument Lines Monitoring Suppression Chamber Pressure Found Incorrectly Tubed to Differential Pressure Sensor Which Activates Breaker Operation,Causing Actuation W/Positive Pressure
ML20086D992
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 08/17/1973
From: George Thomas
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20086D983 List:
References
AO-73-24, VYV-2961, NUDOCS 8312050720
Download: ML20086D992 (2)


Text

,

o o

t VERMONT YANKEP. N UCLEAR POWER CORPORATION SEVENTY SEVEN OROVE STRCCT RUTLAND, VERMONT 03701 VYV-2961

~

REPLY TO:

P. O. sox 157 VERNON. VERMONT 053s4 August 17, 1973

. -: y

,,W United States Atomic Energy Commissic.n Directorate of Regulatory Operations, Region I

'I I j'

3.i,4 p'l O)

'Q,. 4 631 Park Avenue

/

r ?,'.

King of Prussia, Pennsylvania 19406

\\g.

~1

$9&".5

'4 1

REFERENCE:

Operating License DPR-28 N

/

' t" c'

\\.3 [

. l[,

A Docket No. 50-271

' f, Abnormal Occurrence No. A0-73-24 Centlemer.:

-. 4Qf

.V As defined by Technical Specifications for the Vermont Yankee n..,.1. o r pnuar gration Sactinn A.7.3.1. up nre renorrina the followino nu-DI*, and evuflamius uut olsekuu sumu t ma t vetutteuce ao conversation with your office.

At approximately 1400 on August 16, 1973, an instrument technician, while investigating a reported opening of the Pressure Suppression Chamber-Reactor Building Vacuum Breakers, discovered that the instrument Jines monitoring suppression chamber pressure were incorrectly tubed g

to the dif ferential pressure sensors which activate breaker operation, 3

thus causing actuation with positive suppression chamber pressure. This inoperabili ty of the Pressure Suppression Chamber-Reactor Building Vacuum Breaker s-m exceeds the Limiting Conditions for Operations as defined by Section

. 7. A.3.a of Technical

  • Specifications. The subject section requires that two of tvo vacuum breakers shall be operable at 'all times when primary containment integrity is required.

The instrument line connections to DPIS 16-19-32A and,B were immediately corrected and returned to service by 1430 on August 16, 1973.

S f,V

~

9i 0312g30 Nb o

p ena a

6 3, 8 0 S

^

COPY SENI' REGION 4

.)

, L.

O oO k.,),

VERMONT YolKCC NUCLCAR POWER CORPORATiod I

Directorate of Regulatory Operations

}

August 17, 1973 I

Page 2 All other dif ferential pressure sensors are being investigated te ensure that a sin.ilar condition does not exist elsewhere.

Very truly yours, VERMONT YANKEE I.1] CLEAR POWER CORPORATION

""" 3 s.yc George S. Thomas Assistant Plant Superintendent WFC/kbd t